Questão 1
Questão
Which of the following statement about composite structure diagram element are correct?
Responda
-
Ports are modeled as small squares
-
Ports appears on the boundary of an object
-
Collaboration element is represented by a rectangle
-
Collaboration occurrences show instances of collaboration
Questão 2
Questão
Which of the following statements are true about the Subsystem?
Responda
-
Subsystems are smaller systems within a large system
-
A subsystem realizes one or more interfaces. Which define the behaviour it can perform
-
It may be represented as a UML packagcustosche or a set of operations
Questão 3
Questão
Which of the following situation , aggregation may be appropriate?
1. An object is physically composed of other objects.
2. An object is logical collection of other object.
3. An object can physically contain other objects.
Questão 4
Questão
A_________ is represented as a task of zero duration showing an important achievement
Responda
-
Milestone
-
Schedule
-
Project Phase
-
Tracker
Questão 5
Questão
By default, MS Project 2010 accrues resource costs ______________
Responda
-
On a prorated basis
-
At the start of the project
-
At the end of the project task
-
As soon as the specific task starts in the project
Questão 6
Questão
In Ms project 2010, project managers can use the _________ field in the Resource sheet to designate resources with estimated rates or costs that update with actual rates as the project progresses
Responda
-
Material
-
Code
-
Work
-
Resource
Questão 7
Questão
By default, all tasks in MS Project are ____________
Responda
-
Fixed units tasks
-
Fixed duration tasks
-
Fixed work tasks
Questão 8
Questão
Increasing the number of resources of a task will __________ the duration and decreasing the resources will _________ the duration of the task
Responda
-
Increase, Decreases
-
Decreases, Decreases
-
Decreases, Increase
-
Increase, Increase
Questão 9
Questão
Which of the following task types MS Project dose not considered as effort – driven tasks by default?
Responda
-
Fixed duration
-
Fixed work
-
Fixed units
-
Fixed time
Questão 10
Questão
MS Project 2010 comes with a unique feature of saving a project baseline data up to _________ times during the project life cycle
Questão 11
Questão
Which of the following are elements of the custom groups?
Responda
-
Field type
-
Field name
-
Order
-
Field group
Questão 12
Questão
Which of the following leveling order delays or splits the task with the highest ID number in the project?
Responda
-
Standard
-
ID only
-
Priority
-
Priority, Standard
Questão 13
Questão
Which of the following tracking method is useful if managers want to present in their weekly status meeting. the work hours and costs put in during that week?
Responda
-
Task-total
-
Task-time phased
-
Assignment-total
-
Assignment-timephased
Questão 14
Questão
Cost performance is the difference between earned value and ____________
Responda
-
Total value
-
Planned value
-
Actual cost
-
Project
Questão 15
Questão
By default, Gantt Charts in MS Project following a _______ and________ color for the taskbars
Questão 16
Questão
___________ produces information reliably grounded in the observed behaviour of a system
Responda
-
Walkthroughs
-
Verification
-
Validation
-
Testing
Questão 17
Questão
________ produces value indirectly through information about valuable system behaviors.
Responda
-
Testing
-
Walkthroughs
-
Validation
-
Verification
Questão 18
Questão
Performing a test is a _________activity
Responda
-
Physical
-
Logical
-
Technical
-
Non-technical
Questão 19
Questão
Which of the statements about testing principles is true?
Responda
-
Testing resources are limited
-
It is impossible to test everything
-
Testing is based on the design created.
-
Testing begins after the modules are integrated
Questão 20
Questão
Testing is based on ___________
Responda
-
Design team requirements
-
User requirements
-
Design outputs
-
Code developed
Questão 21
Questão
Identify the measurement areas of Motorola Quality Policy for Software Development
(QPSD).
Responda
-
Delivered defects and delivered defects per size
-
Total effectiveness throughout the process
-
Estimation accuracy
-
Decrease software defect density
Questão 22
Questão
How can users enter the task information in the MS Project?
Responda
-
Using the Gantt table
-
Importing tasks from Excel or Outlook
-
Importing tasks from Word document or project table
-
Using the Task information dialog box via the Gantt Chart view
Questão 23
Questão
In which of the following situation, any two tasks can become a predecessor-successor pair?
Responda
-
When they both auto scheduled.
-
When they have a timing relationship between them.
-
When they share resources between them.
-
One cannot Start before another finishes
Questão 24
Questão
Which of the following diagram is a pictorial representation of a system’s functions? Functions from part of various processes that are executed for a system.
Responda
-
Structured Analysis
-
Dataflow Diagram
-
Graph designing
Questão 25
Questão
The project size can be measured by using the Program Complexity Method.
Questão 26
Questão
Which of the following helps us to find answers to questions related to data processing applications such as identifying the primary data object to be processed by the system, the composition of each data object and the attributes which describe the object?
Responda
-
Data Modeling
-
System Elements
-
Data Object or Entities
Questão 27
Questão
Attributes define the properties of a data object. It may serve which of the following purpose?
Questão 28
Questão
Relationships can be bi-directional. Data object, attributes and relationships from the basic elements of data modelling and provide the basis for understanding the information domain of a problem.
Questão 29
Questão
__________ IS THE SPECIFICATION OF THE NUMBER OF OCCURRENCES OF ONE OBJECT THAT CAN BE RELATED TO NUMBER OF OCCURRENCES OF ANOTHER OBJECT.
Responda
-
MODALITY
-
CARDINALITY
-
ENTITY
Questão 30
Questão
The term __________ can be applied to a person, place ,thing ,object or event.
Responda
-
Modality
-
Cardinality
-
Entity
Questão 31
Questão
Bubbles within a Data Flow Diagram are used to represent data stores.
Questão 32
Questão
Which of the following is an organized listing of all data elements that are pertinent to the system with precise, rigorous, definitions so that both user and system analyst will have a common understanding of inputs, outputs ,components of stores and intermediate calculations?
Responda
-
Control Flow
-
Data Dictionary
-
Cardinality
Questão 33
Questão
An Entity- Relationship diagram identifies a number of components such as objects, attributes relationships and various type-indicators.
Questão 34
Questão
Which of the following defines the relationship among the major structural elements of the program?
Responda
-
Component-level design
-
Interface design
-
Architectural design
Questão 35
Questão
Which of the following describes how software communicates with system that interoperate within it and with people who use it?
Responda
-
Component-level design
-
Interface design
-
Architectural design
Questão 36
Questão
The _________ diagram is a form of activity diagram in which the nodes represent interaction diagram.
Responda
-
Differential Overview
-
Interaction Overview
-
Partial Overview
-
Activity Overview
Questão 37
Questão
The ________ diagram shows the internal structure of a class, component or collaboration, including its interaction points with other parts of the system.
Responda
-
Complex Structure
-
Medium Internal
-
Composite Structure
-
Definition Structure
Questão 38
Questão
The __________ diagram is composed only of packages and the dependencies between them
Responda
-
Namespace
-
Activity
-
Package
-
Use-case
Questão 39
Questão
Which of the following statements about the use-case model are correct?
Responda
-
The Use-Case model only consists of actors.
-
The Use-Case model allows users to validate the fact that the system will become what they expect.
-
The Use-Case model only consist of use-cases.
-
The Use-Case model serves as a contract between customers, users, and system developers.
Questão 40
Questão
Which of the following are types of project calendars in MS Project 2010?
Responda
-
Basic Calendar
-
Standard Calendar
-
Task Calendar
-
Resource Calendar