Questão 1

Questão
The company is having issues with quality on its projects. Senior Management has a mentality of dealing with problems when they absolutely need to instead of trying to eliminate them before they occur. The company would expect to work with all of the following except…
Responda
  • a. Increased warranty support
  • b. Dissatisfied customers
  • c. More inventory needed
  • d. Training for process improvement

Questão 2

Questão
A project team is having their first quality meeting and plans to review the organization’s quality policy when it is discovered that the company has never developed an organizational quality policy. The project manager is very concerned about this discovery. What would be the BEST course of action?
Responda
  • a. Document the absence of a quality policy in the quality management plan and take corrective action
  • b. Write a quality policy just for this project
  • c. Substitute benchmark data for the quality policy
  • d. Suspend execution until the organization provides a quality policy

Questão 3

Questão
The company is in the Validate Scope phase of its project. It is tracking defects that come in from customers who are testing the project. Given the nature of a new project, they have a variety of defects that are being discovered. Organizing and prioritizing the defects is becoming a challenge and they want to be more proactive about it before it gets out of control. What would help them organize this better?
Responda
  • a. Flowchart
  • b. Histogram
  • c. Fishbone diagram
  • d. Ishikawa diagram

Questão 4

Questão
The bus driver for metro area rapid transit is in the process of driving the daily bus route. Adhering to the required startup process, the driver follows the procedures to ensure that he has properly selected and adjusted all the needed items to start up the bus for his route. Which of the following did he likely use?
Responda
  • a. Cause and Effect diagram
  • b. Company policy
  • c. Process flowchart
  • d. Checklist

Questão 5

Questão
A project manager wants to perform a code review, but over two million lines of code have already been written for this project, and more are being produced every day. Rather than reviewing each line of code, the manager should consider:
Responda
  • a. Automated testing tools
  • b. Trend analysis
  • c. Statistical sampling
  • d. Regression analysis

Questão 6

Questão
The integrated circuit manufacturing process has been experiencing variance that is causing concern among the team. Some results have been within the specification limits, and some below the control tolerances. You want to learn more about the output of the process for last 100 values. Which item below would show the most useful view of information?
Responda
  • a. Pareto diagram
  • b. Fishbone diagram
  • c. Control chart
  • d. Checklist

Questão 7

Questão
The company is implementing a quality improvement standard on its project work, trying to improve the culture to improve quality standards. The company views the need to shift the mentality of the company to a proactive approach to quality to achieve this objective. Which of the following would it not expect to deal within an environment that has a proactive approach to quality?
Responda
  • a. Greater quality standard
  • b. Increased warranty support
  • c. Decreased warranty support
  • d. Less inventory needed

Questão 8

Questão
The project is in the process of determining the accuracy of the work of the product. The project team members are utilizing a progressive elaboration approach. They discover that the process to measure the output is not going to produce the results needed. What process will fix the problem?
Responda
  • a. Plan Quality Management
  • b. Quality Management
  • c. Manage Quality
  • d. Control Quality

Questão 9

Questão
The goal of the Control Quality Process is:
Responda
  • a. Verify deliverables, that is to obtain the final acceptance of the deliverables.
  • b. Verify deliverables, that is to determine the correctness of the deliverables.
  • c. Validate deliverables, that is to obtain the final acceptance of the deliverables.
  • d. To obtain quality metrics.

Questão 10

Questão
The Control chart has an upper control limit of ten and a lower control limit of four. What is the upper specification limit?
Responda
  • a. Greater than ten
  • b. Twelve
  • c. Fourteen
  • d. Between ten and four

Questão 11

Questão
A project manager is unsure of the difference between precision and accuracy and asks for your help in understanding the difference between the two terms. Which of these responses would be the best response to such a question?
Responda
  • a. Precision is consistency that the value of a repeated set of measurements are clustered and have little scatter whereas accuracy is correctness that the measured value is very close to the true value
  • b. Accuracy is consistency that the value of a repeated set of measurements are clustered and have little scatter whereas precision is correctness that the measured value is very close to the true value
  • c. Accuracy and Precision are equivalent and normally specified in the SOW by the customer who issues the SOW
  • d. Accuracy is more important than precision. The project management team must decide the level of accuracy required

Questão 12

Questão
In control quality, the focus is on testing. Decisions should be made regarding how much testing is needed. Which of the following would be considered a negative associated with testing a sample instead of a population?
Responda
  • a. It is more difficult.
  • b. It is less destructive.
  • c. It is not very thorough.
  • d. It needs more resource.

Questão 13

Questão
An organization is highly reputed for deliverables quality. What would be an appropriate statement that BEST represent this situation?
Responda
  • a. The organization has a low cost of quality.
  • b. Organization uses a standard quality management plan for all projects.
  • c. Organization’s Project schedules are highly robust.
  • d. The organization has a high cost of quality.

Questão 14

Questão
The project is progressing. As the company starts to release the product of the project to market, the consumer isn’t buying it as the company had projected. This appears to be because in the past, the company has released products that had an excessive number of defects. Who was ultimately responsible for these products being released with the defects?
Responda
  • a. Functional Management
  • b. Project Manager
  • c. The developer
  • d. Senior Management

Questão 15

Questão
The printing company is putting a policy in place to use just-in-time manufacturing. It feels this policy will help minimize excess paper and ink costs and improve efficiency in processing and maximize square footage utilization The amount of inventory needed for this type of process is what??
Responda
  • a. 0.25
  • b. Minimal
  • c. Zero
  • d. Six Sigma

Questão 16

Questão
An automotive designer uses a certain technique to determine which combination of suspension and tires will produce the most desirable ride characteristics at a reasonable cost. In order to do this, she works with a statistical framework and systematically changes all of the important parameters instead of changing the factors one at a time. This is known as:
Responda
  • a. Design for X
  • b. Root cause analysis
  • c. Design of Quality
  • d. Design of Automobiles

Questão 17

Questão
In the process of managing a construction project, you discover a very serious defect in the way one particular section has been built. Your engineers analyse the section of the building and decide that the problem is actually relatively minor. In which process are you involved?
Responda
  • a. Plan Quality Management
  • b. Manage Quality
  • c. Control Quality
  • d. Quality Management

Questão 18

Questão
A customer is concerned that the quality process is not being followed as laid out in the quality management plan. The best way to see if this claim is accurate is:
Responda
  • a. Random sampling
  • b. Kaizen
  • c. Personally participate in the quality inspections
  • d. Audits

Questão 19

Questão
The construction engineer is doing questionable work on his tasks on the remodeling project. The Project Manager has spoken to him about it a few times to no resolution. Functional Management has been made aware of this issue as well. Who is responsible for the quality of the work of the construction engineer?
Responda
  • a. The Construction Engineer
  • b. Project Manager
  • c. Senior Management
  • d. Functional Management

Questão 20

Questão
The bottling project is encountering a number of defects and needs to focus on what requires the most attention based on count. They want to have something that will graphically show this requirement plus a cumulative percentage of the defects. Which of the following would you use to provide this?
Responda
  • a. Histogram
  • b. Ishikawa diagram
  • c. Fishbone diagram
  • d. Flowchart

Semelhante

QUIZ 1# - Diabetes Mellitus
Maria Regina
Expressões Idiomáticas Em Inglês
marciofmoraes
Aplicações do Mapa Mental
Alessandra S.
Como fazer Mapas Mentais
Marina Faria
Provas anteriores de vestibular - Fuvest 2
GoConqr suporte .
Física: Mecânica - Cinemática
GoConqr suporte .
Constituição Federal - Artigos 1 à 5
GoConqr suporte .
Revisão
Vanessa Bolina
Funções Químicas
J. J. Phillip
Geometria Espacial
nathielecosta
GoConqr para Professores
Lilian Arruda