Questão 1

Questão
Risk diversification is an important strategy to handle risks: Can you fill in the right terms?
Responda
  • shift
  • avoid
  • endure
  • reduce
  • endure
  • avoid
  • shift
  • reduce
  • competitive
  • compensation
  • cooperative
  • internal
  • insurance
  • inacceptable
  • enhance
  • endure
  • extrapolate
  • reinforcements
  • recalls
  • reserves

Questão 2

Questão
We divide risk measurement into "quantitative" and "qualitative" methods. Can you fill in the right terms?
Responda
  • minimum loss
  • maximum loss
  • variation of loss
  • value at risk
  • estimation
  • quick and dirty
  • scoring model

Questão 3

Questão
FMEA is a risk management method in the product development process. Can you define it?
Responda
  • FMEA := Falsification Method in Engineering Analytics
  • FMEA := Failure Method in Engineering Analysis
  • FMEA := Failure Mode and Effect Analysis
  • FMEA := Failure Method and Effect Analytics

Questão 4

Questão
Within the FMEA method, the calculation and evaluation of the RPN (Risk Priority Number) is crucial. Are you able to check if the following statements are true (or false)?
Responda
  • RPN helps the responsible risk management team to prioritize risks.
  • RPN is calculated by multiplying Severity (S), Occurrence (O), and Detection (D).
  • Severity (S): A high severity ranking indicates severe risk.
  • Occurrence (O): A low occurrence rank reflects high failure occurrence potential.
  • Detection (D): A high detection rank reflects high detection capability.
  • Detection (D): A high detection rank reflects low detection capability.
  • Occurrence (O): A high occurrence rank reflects high failure occurrence potential.
  • Severity (S): A low severity ranking indicates severe risk.
  • The maximum value of RPN is 10x10x10 = 1000.

Questão 5

Questão
Let's bring risk management to the context of strategical procurement. Can you fill in the missing text?
Responda
  • complexity
  • globalization
  • volume
  • politics & laws

Semelhante

Artigo Científico elaboração
Candido Gabriel
Biologia e Geologia - Biologia 11ºano, parte III - Ensino Secundário Português
Heres Oliveira
Phrasal Verbs - Inglês #9
Eduardo .
Expressões em inglês #8
Eduardo .
Informática - questões gerais
António Mordido
Direito Penal - Escrevente TJ-SP
Luiz Gustavo Muzzi Rodrigues
Quiz sobre Tecnologia no Ensino
camilafragoso
Conceitos fundamentais da cinemática
annarios1313
Direito das Obrigações
João Lunge
Sistema nervoso
João Victor