Quix13 - SDLC

Descrição

Good Luck!
Requiemdust Sheena
Quiz por Requiemdust Sheena, atualizado more than 1 year ago
Requiemdust Sheena
Criado por Requiemdust Sheena mais de 4 anos atrás
7
0

Resumo de Recurso

Questão 1

Questão
When using the SDLC, which one of these steps should you take before the others?
Responda
  • A. Functional requirements determination
  • B. Control specifications development
  • C. Code review
  • D. Design review

Questão 2

Questão
When should a design review take place when following an SDLC approach to software development?
Responda
  • A. After the code review
  • B. After user acceptance testing
  • C. After the development of functional requirements
  • D. After the completion of unit testing

Questão 3

Questão
Norm is starting a new software project with a vendor that uses an SDLC approach to development. When he arrives on the job, he receives a document that has the sections shown here. What type of planning document is this?
Responda
  • A. Functional requirements
  • B. Work breakdown structure
  • C. Test analysis report
  • D. Project plan

Questão 4

Questão
Which one of the following statements about the SDLC is correct?
Responda
  • A. The SDLC requires the use of an iterative approach to software development.
  • B. The SDLC requires the use of a sequential approach to software development.
  • C. The SDLC does not include training for end users and support staff.
  • D. The waterfall methodology is compatible with the SDLC.

Questão 5

Questão
Which one of the following statements is not true about code review?
Responda
  • A. Code review should be a peer-driven process that includes multiple developers.
  • B. Code review may be automated.
  • C. Code review occurs during the design phase.
  • D. Code reviewers may expect to review several hundred lines of code per hour.

Questão 6

Questão
What software development model is shown in the figure?
Responda
  • A. Waterfall
  • B. Agile
  • C. Lean
  • D. Spiral

Questão 7

Questão
Doug is choosing a software development life-cycle model for use in a project he is leading to develop a new business application. He has very clearly defined requirements and would like to choose an approach that places an early emphasis on developing comprehensive documentation. He does not have a need for the production of rapid prototypes or iterative improvement. Which model is most appropriate for this scenario?
Responda
  • A. Agile
  • B. Waterfall
  • C. Spiral
  • D. DevOps

Questão 8

Questão
Which cloud-based service would handle support functions during the SDLC process?
Responda
  • A. MaaS
  • B. IaaS
  • C. SaaS
  • D. PaaS

Questão 9

Questão
Your colleague wants to know when the best point within the software development life cycle (SDLC) is to create a list of potential security issues. What do you tell her?
Responda
  • A. Feasibility
  • B. Development
  • C. Design
  • D. Requirements

Questão 10

Questão
In which software development life cycle phase do the programmers and developers become deeply involved and do the majority of the work?
Responda
  • A. System Design Specifications
  • B. Software Development
  • C. Operation and Maintenance
  • D. Functional Design Analysis and Planning

Questão 11

Questão
Which of the software development life cycle phases is the point at which new systems need to be configured and steps need to be taken to make sure that security features are being used in the intended way?
Responda
  • A. System Design Specifications
  • B. Operation and Maintenance
  • C. Functional Design Analysis and Planning
  • D. Installation and Implementation

Questão 12

Questão
What is the point in the software development life cycle phase at which information may need to be archived or discarded and a team may be assembled to examine ways to improve subsequent iterations of this or other products?
Responda
  • A. Revision and Replacement
  • B. Functional Design Analysis and Planning
  • C. Disposal and Postmortem Review
  • D. System Design Specifications

Questão 13

Questão
Jake has become concerned that a citizen programmer in the group has developed code for others in the department. What should be your primary concern?
Responda
  • A. That the programs are tested by others in the department
  • B. That the programs have not been certified and verified
  • C. That a copy of the code is held in a library
  • D. That the code is adequately commented

Questão 14

Questão
Security controls must be considered at which phases of the software life cycle?
Responda
  • A. Design analysis, software development, installation, and implementation
  • B. Project initiation, software development, and operation maintenance
  • C. Design specifications
  • D. All of the above

Semelhante

Construindo a tabuada
Pedro Júnior1178
Quiz Sobre Genética
Marerodrigues
Phrasal Verbs - Inglês #8
Eduardo .
Revisão
Vanessa Bolina
Prazos - Dos Atos Processuais - Direito Processual Civil
Luiz Gustavo Muzzi Rodrigues
Revisão de Sociologia para a 3a. serie do Ensino Médio
e-pn-2007@hotmail.co
Mapa Mental de GoConqr
GoConqr suporte .
Direitos e Deveres Individuais e Coletivos: o Art. 5° da Constituição Federal (PARTE I)
gabyzone
Mercantilismo
Professor Junior
Conhecimento Murado 1
Marília Capuccio
Conhecimentos Gerais e Atualidades
hadassah sorvillo