Questão 1
Questão
The INCOSE Handbook has been written to be consistent with ISO/IEC/IEEE 15288 in order to ensure it can be applied to (choose 3):
Responda
-
System-of-systems
-
Medical systems
-
Products
-
Services
-
Buisness
-
Avionics
Questão 2
Questão
ISO/IEC/IEEE 15288 provides (choose 2):
Responda
-
Practices necessary to execute processes
-
activities necessary to execute processes
-
generic top-level process descriptions
-
generic top-level process requirements
Questão 3
Questão
The number of process groups identified by ISO/IEC/IEEE 15288 is:
Questão 4
Questão
The INCOSE Handbook is ready to be applied to your company or project
Questão 5
Questão
The 4 process groups from ISO/IEC/IEEE 15288 that support systems engineering include (choose 2):
Questão 6
Questão
The 2 Agreement Processes are:
Responda
-
Contract Management
-
Acquisition
-
Supply Chain Management
-
Supply
-
Negotiate
Questão 7
Questão
The 4 process groups from ISO/IEC/IEEE 15288 that support systems engineering include (choose 2):
Questão 8
Questão
The 8 Technical Management Processes include (choose 4):
Questão 9
Questão
The 5 Organizational Project-Enabling Processes identified by ISO/IEC/IEEE 15288 include (choose 3):
Responda
-
Technical Process
-
Infrastructure Management Process
-
Agreement Process
-
Human Resources Management Process
-
Quality Management Process
Questão 10
Questão
The 5 Organizational Project-Enabling Processes identified by ISO/IEC/IEEE 15288 include (choose 2):
Questão 11
Questão
When joining a project, one of the first jobs of a systems engineering is to:
Responda
-
Create Integrated Product Development Teams (IPDT's)
-
Initiate a function based analysis to establish a foundation for defining a system architecture
-
Begin writing the Concept of Operations document in order to demonstrates the organization grasps the customers wants and needs
-
Establish nomenclature and terminology to support clear, unambiguous communication
Questão 12
Questão
Input-process-output diagrams typically include controls and enablers
Questão 13
Questão
How many items are called out in the Controls box
Questão 14
Questão
Select the Controls from the list below:
Responda
-
Applicable laws and regulations
-
Organizational policies, procedures and standards
-
Organizational Infrastructure
-
Standards
-
Agreements
-
Project Infrastructure
-
Project Direction
-
Knowledge Management
-
Project Control Requests
Questão 15
Questão
The definition of "Process" used in the Activities box is:
Responda
-
a series of actions or steps taken in order to achieve a particular end
-
sequence of interdependent and linked procedures which, at every stage, consume one or more resources
-
an integrated set of activities that transforms inputs into desired outputs
-
a series of action, changes, or functions bringing about a result
Questão 16
Questão
The input-process-output diagrams represent:
Responda
-
the single best way to perform systems engineering processes
-
the fact that systems engineering must produce the documents listed in the outputs
-
one potential way the systems engineering processes can be performed
Questão 17
Questão
Project direction, as found in the Controls box of the input-process-output (IPO) diagram, is defined as:
Responda
-
a vector defining the success criteria for a project
-
the organizations direction to a project to continue, redirect or terminate
-
a measurement against assessment criteria that determines if a project is moving forward or stalled
-
permission to continue forward at the conclusion of a phase-gate or state-gate review
Questão 18
Questão
The difference between "project direction: and "project control requests" is best described by:
Responda
-
Project control requests are internally generated by the project due to deviations form the project plan
-
Project direction is internally generated by the project in response to deviations from the project plan
-
Project control requests are suggestions white project direction is an authoritative order