An advantage of using CAD programs, over traditional hand drawing methods is that
Questão 2
Questão
Which of the following is true about traditional hand produced drawings compared to using a CAD package?
Responda
-
Initial set up costs are high
-
Drawings are more accurate
-
Editing can take longer
-
Drawings can be produced quicker
Questão 3
Questão
Which one of the following projection types is most likely to show room dimensions for a house?
Responda
-
Isometric
-
Axonometric
-
Photographic
-
Orthographic
Questão 4
Questão
Orthographic projections are required when applying for
Questão 5
Questão
Door and window schedules can be produced from a
Responda
-
table
-
drawing
-
programme
-
specification
Questão 6
Questão
Isometric drawings show objects in
Responda
-
two dimension
-
three dimension
-
two point perspective
-
three point perspective
Questão 7
Questão
A 30° / 60° set square is required to draw an
Responda
-
elliptical axis
-
isometric axis
-
elevational axis
-
orthographic axis
Questão 8
Questão
Which of the following is the most suitable thermal insulating material for a conservatory roof?
Responda
-
Perspex
-
Double glazing
-
Twin wall plastic
-
Polyisocyanurate
Questão 9
Questão
Whish one of the following thermal insulation materials can be cut with a pair of scissors and fixed with a staple gun?
Responda
-
Multi foil
-
Mineral wool
-
Polyvinyl butyl
-
Polyisocyanurate
Questão 10
Questão
Insulation is positioned within a brick cavity wall to
Responda
-
prevent damp rising
-
minimise capillary attraction
-
conform to fire safety legislation
-
conform to building regulations
Questão 11
Questão
When insulation is inserted between the rafters in a roof, care must be taken to ensure air flow is
Responda
-
limited
-
adjustable
-
prevented
-
maintained
Questão 12
Questão
Whish of the following walling construction methods has the best thermal value?
Responda
-
Stone
-
Concrete
-
Timber frame
-
Solid brick work
Questão 13
Questão
Energy's certificate rating A-G determine a building's
Responda
-
water usage
-
gas pressure
-
thermal efficiency
-
electrical resistance
Questão 14
Questão
When timber is imported into the United Kingdom it must be from
Responda
-
Europe
-
America
-
a local source
-
a managed source
Questão 15
Questão
What are sustainable materials?
Responda
-
Materials that do not destroy or deplete natural resources
-
Materials made only of timber
-
Materials that do not contain any plastic
-
Materials that are manufactured from recycled materials only
Questão 16
Questão
Which of the following formula's is used for calculating the area of a wall?
Responda
-
L x H
-
L x H³
-
L ÷ H³
-
L ÷ H
Questão 17
Questão
Which formula is used to find the area of a circular platform?
Responda
-
π r² v²
-
π dh
-
4/3 π r³
-
M 1/3 π r²h
Questão 18
Questão
Which of the following are both shown on a schedule?
Responda
-
Location and size
-
Tools and position
-
Density and porosity
-
Joint size and adhesive
Questão 19
Questão
When ordering supplies, an approved supplier list would be used, as they have proved in the past to be
Responda
-
friendly
-
reliable
-
expensive
-
available
Questão 20
Questão
A contract would be priced up using the drawings and the
Responda
-
bill of quantities
-
requisition sheet
-
contract for payment
-
contract specification
Questão 21
Questão
A client would put a contract out to tender in order to compare
Responda
-
specifications
-
bill of quantities
-
installation details
-
competitive prices
Questão 22
Questão
A quote would give the client
Responda
-
the cost of the preambles
-
a variable price for the job
-
a bid for the work to be done
-
the cost for the work to be carried out
Questão 23
Questão
An estimate will give the client
Responda
-
a cost for all the labour required
-
an exact cost for the complete job
-
a cost for all the materials required
-
an approximate cost for the complete job
Questão 24
Questão
2600 m² of wall tiles are required for a contract.
How many additional wall tiles need to be ordered when allowing 10% waste?
Responda
-
250 m²
-
260 m²
-
2610 m²
-
2860 m²
Questão 25
Questão
Which of the following both need to be considered when preparing a quote?
Questão 26
Questão
The benefit of using a Gantt chart is to show the planning of which of the following?
Questão 27
Questão
The lead times required for ordering materials are planned by using a
Responda
-
schedule
-
specification
-
bill of quantities
-
method statement
Questão 28
Questão
Which one of the following is an advantage of purchasing plant compared to hiring it?
Responda
-
Maintenance costs are reduced
-
It is less expensive in the long term
-
No additional purchases are required
-
Portable appliance testing is not required
Questão 29
Questão
Which one of the following is an advantage of hiring equipment?
Responda
-
It is available at any time
-
Costs are reduced in the long term
-
It can be kept at the end of a contract
-
Spare parts do not have to be purchased
Questão 30
Questão
Which one of the following is not a planning method used in construction?
Responda
-
Gantt chart
-
Bill of quantities
-
Programme of work
-
Critical path analysis
Questão 31
Questão
Which one of the following are all required pieces of information to produce a Gantt chart?
Responda
-
Start date, end date and labour required
-
Delivery dates, specifications and bill of quantities
-
Labour required, meeting agenda and bill of quantities
-
Planned activities, meeting agenda and plant required
Questão 32
Questão
Which one of the following documents is used to record action points of a meeting?
Responda
-
A diary
-
An agenda
-
The memos
-
The minutes
Questão 33
Questão
A hot works permit is required when
Responda
-
work is carried out in a kitchen
-
working in air-conditioned rooms
-
work is carried out that generates heat
-
working in confined spaces underground
Questão 34
Questão
An instruction from an Architect to make changes to work would be made
Responda
-
in a diary
-
on an agenda
-
on a delivery note
-
in a variation order
Questão 35
Questão
Which one of the following documents contains information including attendees, apologies and dates?
Responda
-
Diary
-
Agenda
-
Calendar
-
Schedule
Questão 36
Questão
Information about site access would be included during
Responda
-
an induction
-
a toolbox talk
-
in a safety meeting
-
an extended meeting
Questão 37
Questão
Safety updates and changes to working hours would be discussed during
Responda
-
an induction
-
a toolbox talk
-
a safety meeting
-
an extension meeting
Questão 38
Questão
Binding doors and damaged paintwork found at the end of a contract, would be identified during a
Responda
-
land survey
-
toolbox talk
-
motion study
-
defects survey
Questão 39
Questão
Which of the following information, other than faults found, is included on a defects schedule?
Responda
-
Programme
-
Specification
-
Remedial action
-
Contract start date
Questão 40
Questão
Which one of the following is required when querying an incorrect delivery of timber?
Responda
-
Total cost
-
Order number
-
Quality of timber
-
Timber supplier