Questão 1
Questão
Q. 1: Given the following state transition table Which of the test cases below will cover the following series of state transitions? S1 SO S1 S2 SO
Responda
-
A. D, A, B, C.
-
B. A, B, C, D.
-
C. D, A, B.
-
D. A, B, C.
Questão 2
Questão
Q. 2: From a Testing perspective, what are the MAIN purposes of Configuration
Management?:
i) Identifying the version of software under test.
ii) Controlling the version of testware items.
iii) Developing new testware items.
iv) Tracking changes to testware items.
v) Analysing the need for new testware items.
Responda
-
A. ii, iv and v.
-
B. ii, iii and iv.i
-
C. i, ii and iv.
-
D. i, iii and v.
Questão 3
Questão
Q. 3: Which of the following is a MAJOR task of test planning?
Responda
-
A. Scheduling test analysis and design tasks.
-
B. Initiating corrective actions.
-
C. Monitoring progress and test coverage.
-
D. Measuring and analyzing results.
Questão 4
Questão
Q. 4: Which of the following BEST describes the difference between an inspection and a
walkthrough?
Responda
-
A. Both inspections and walkthroughs are led by the author.
-
B. An inspection is led by a moderator and a walkthrough is led by the author.
-
C. Both inspections and walkthroughs are led by a trained moderator.
-
D. A walkthrough is led by the author. The author is not present during inspections.
Questão 5
Questão
Q. 5: Where may functional testing be performed?
Responda
-
A. At system and acceptance testing levels only.
-
B. At all test levels.
-
C. At all levels above integration testing.
-
D. At the acceptance testing level only.
Questão 6
Questão
Q. 6: What is the MAIN objective when reviewing a software deliverable?
Responda
-
A. To identify potential application failures by use of a test specification.
-
B. To identify defects in any software work product.
-
C. To identify spelling mistakes in a requirements specification.
-
D. To identify standards inconsistencies in the code.
Questão 7
Questão
Q. 7: Who would USUALLY perform debugging activities?
Responda
-
A. Developers.
-
B. Analysts.
-
C. Testers.
-
D. Incident Managers.
Questão 8
Questão
Q. 8: Which of the following would you NOT usually find on a software incident report?
Responda
-
A. The name and/or organisational position of the person raising the problem.
-
B. Version of the Software Under Test.
-
C. Suggestions as to how to fix the problem.
-
D. Actual and expected results.
Questão 9
Questão
Q. 9: Which of the following defines the expected results of a test?
Responda
-
A. Test case specification.
-
B. Test design specification.
-
C. Test procedure specification.
-
D. Test results.
Questão 10
Questão
Q. 10: Some tools are geared more for developer use. For the 5 tools listed, which
statement BEST details those for developers
i) Performance testing tools.
ii) Coverage measurement tools.
iii) Test comparators.
iv) Dynamic analysis tools.
v) Incident management tools.
Responda
-
A. i, iii. and iv. are more for developers.
-
B. ii. and iv. are more for developers.
-
C. ii, iii. and iv. are more for developers.
-
D. ii. and iii. are more for developers.
Questão 11
Questão
Q. 11: Which of the following is correct?
Responda
-
A. Impact analysis assesses the effect on the system of a defect found in regression testing.
-
B. Impact analysis assesses the effect of a new person joining the regression test team.
-
C. Impact analysis assesses whether or not a defect found in regression testing has been
fixed correctly.
-
D. Impact analysis assesses the effect of a change to the system to determine how much
regression testing to do.
Questão 12
Questão
Q. 12: As part of which test process do you determine the exit criteria?
Questão 13
Questão
Q. 13: Given the following state transition diagram Which of the following series of
state transitions contains an INVALID transition which may indicate a fault in the system
design?
Responda
-
A. Login Browse Basket Checkout Basket Checkout Pay Logout.
-
B. Login Browse Basket Checkout Pay Logout.
-
C. Login Browse Basket Checkout Basket Logout.
-
D. Login Browse Basket Browse Basket Checkout Pay Logout.
Questão 14
Questão
Q. 14: Which of the following is a MAJOR task of test implementation and execution?
Responda
-
A. Measuring and analyzing results.
-
B. Reporting discrepancies as incidents.
-
C. Identifying test conditions or test requirements.
-
D. Assessing if more tests are needed.
Questão 15
Questão
Q. 15: What is beta testing?
Responda
-
A. Testing performed by potential customers at the developers location.
-
B. Testing performed by potential customers at their own locations.
-
C. Testing performed by product developers at the customer's location.
-
D. Testing performed by product developers at their own locations.
Questão 16
Questão
Q. 16: Given the following fragment of code, how many tests are required for 100%
decision coverage?
if width > length
then
biggest_dimension = width
if height > width
then
biggest_dimension = height
end_if
else
biggest_dimension = length
if height > length
then
biggest_dimension = height
end_if
end_if
Questão 17
Questão
Q. 17: You have designed test cases to provide 100% statement and 100% decision
coverage for the following fragment of code.
if width > length
then
biggest_dimension = width
else
biggest_dimension = length
end_if
The following has been added to the bottom of the code fragment above.
print "Biggest dimension is " & biggest_dimension
print "Width: " & width
print "Length: " & length
How many more test cases are required?
Responda
-
A. One more test case will be required for 100 % decision coverage.
-
B. Two more test cases will be required for 100 % statement coverage, one of which will be
used to provide 100% decision coverage.
-
C. None, existing test cases can be used.
-
D. One more test case will be required for 100" statement coverage.
Questão 18
Questão
Q. 18: A thermometer measures temperature in whole degrees only. If the temperature
falls below 18 degrees, the heating is switched off. It is switched on again when the
temperature reaches 21 degrees. What are the best values in degrees to cover all
equivalence partitions?
Responda
-
A. 15, 19 and 25.
-
B. 17, 18 and 19.
-
C. 18, 20 and 22.
-
D. 16, 26 and 32.
Questão 19
Questão
Q. 19: Which activity in the fundamental test process creates test suites for efficient
test execution?
Questão 20
Questão
Q. 20: Which of the following is TRUE?
Responda
-
A. Confirmation testing is testing fixes to a set of defects and Regression testing is testing
to establish whether any defects have been introduced as a result of changes.
-
B. Confirmation testing is testing to establish whether any defects have been introduced as
a result of changes and Regression testing is testing fixes to a set of defects.
-
C. Confirmation testing and Regression testing are both testing to establish whether any
defects have been introduced as a result of changes.
-
D. Confirmation testing and Regression testing are both testing fixes to a set of defects.
Questão 21
Questão
Q. 21: Given the following decision table: Which of the following test cases and
expected results is VALID?
Responda
-
A. 23 year old in insurance class A Premium is 0 and excess is,500.
-
B. 51 year old in insurance class C Premium is 0 and excess is 00.
-
C. 31 year old in insurance class B Premium is 0 and excess is ,500.
-
D. 43 year old in insurance class C Premium is 0 and excess is ,000.
Questão 22
Questão
Q. 22: When should configuration management procedures be implemented?
Questão 23
Questão
Q. 23: Which of the following are characteristic of regression testing ?
i) Regression testing is run ONLY once
ii) Regression testing is used after fixes have been made
iii) Regression testing is often automated
iv) Regression tests need not be maintained
Responda
-
A. ii, iv.
-
B. ii, iii.
-
C. i, iii, iv.
-
D. iii.
Questão 24
Questão
Q. 24: A wholesaler sells printer cartridges. The minimum order quantity is 5. There is
a 20% discount for orders of 100 or more printer cartridges. You have been asked to
prepare test cases using various values for the number of printer cartridges ordered.
Which of the following groups contain three test inputs that would be generated using
Boundary Value Analysis?
Responda
-
A. 5, 6, 20
-
B. 4, 5, 80
-
C. 4, 5, 99
-
D. 1, 20, 100
Questão 25
Questão
Q. 25: Which of the following activities should be performed during the selection and
implementation of a testing tool?
i) Investigate the organisation's test process.
ii) Conduct a proof of concept.
iii) Implement the selected tool on a project behind schedule to save time.
iv) Identify coaching and mentoring requirements for the use of the selected tool.
Responda
-
A. i, ii, iii.
-
B. ii, iii, iv.
-
C. i, iii, iv.
-
iv.
Questão 26
Questão
Q. 26: What is the MAIN benefit of designing tests early in the life cycle?
Responda
-
A. It is cheaper than designing tests during the test phases.
-
B. It helps prevent defects from being introduced into the code.
-
C. Tests designed early are more effective than tests designed later.
-
D. It saves time during the testing phases when testers are busy.
Questão 27
Questão
Q. 27: Which of the following benefits are MOST likely to be achieved by using test
tools?
i) Easy to access information about tests and testing.
ii) Reduced maintenance of testware.
iii) Easy and cheap to implement.
iv) Greater consistency of tests.
Responda
-
A. ii and iv
-
B. ii and iii
-
C. i and iv
-
D. i and iii
Questão 28
Questão
Q. 28: What is the KEY difference between preventative and reactive approaches to
testing?
Responda
-
A. Preventative tests and reactive tests are designed as early as possible.
-
B. Preventative tests are designed early; reactive tests are designed after the software has
been produced.
-
C. Preventative testing is always analytical; reactive testing is always heuristic.
-
D. Preventative tests are designed after the software has been produced; reactive tests are
designed early in response to review comments.
Questão 29
Questão
Q. 29: What is the purpose of exit criteria?
Responda
-
A. To define when a test level is complete.
-
B. To determine when a test has completed.
-
C. To identify when a software system should be retired.
-
D. To determine whether a test has passed.
Questão 30
Questão
Q. 30: What determines the level of risk?
Responda
-
A. The cost of dealing with an adverse event if it occurs.
-
B. The probability that an adverse event will occur.
-
C. The amount of testing planned before release of a system.
-
D. The likelihood of an adverse event and the impact of the event.
Questão 31
Questão
Q. 31: With which of the following categories is a test comparator tool USUALLY
associated?
Responda
-
A. Tool support for performance and monitoring.
-
B. Tool support for static testing.
-
C. Tool support for test execution and logging.
-
D. Tool support for the management of testing and tests.
Questão 32
Questão
Q. 32: Which activities form part of test planning?
i) Developing test cases.
ii) Defining the overall approach to testing.
iii) Assigning resources.
iv) Building the test environment
v) Writing test conditions.
Responda
-
A. i, ii & iv are true, iii & v are false.
-
B. ii & iii are true, i, iv & v are false.
-
C. iv & v are true, i, ii & iii are false.
-
D. i, ii & iii are true iv & v are false.
Questão 33
Questão
Q. 33: Match the following terms and statements.
1.Decision Table Testing
2.Decision Testing
3.State Transition Testing
4.Exploratory Testing
W. Testing carried out w boxes to achieve specific test objectives, possibly to complement
structured testing.
X. A test technique used which may be used to verify different system re depending on
current conditions or previous history.
Y. A test technique which combines combinations of inputs that might not otherwise have
been exercised during testing.
Z. A form of control flow testing based on decision outcomes.
Responda
-
A. 1Y, 2Z, 3X, 4W.
-
B. 1X ,2W, 3Z, 4Y.
-
C. 1Z, 2X, 3W, 4Y.
-
D. 1Z, 2Y, 3X, 4W.
Questão 34
Questão
Q. 34: Which type of test design techniques does the following statement best describe
a procedure to derive test cases based on the specification of a component?
Questão 35
Questão
Q. 35: For which of the following would a static analysis tool be MOST useful?
Responda
-
A. Supporting reviews.
-
B. Validating models of the software.
-
C. Testing code executed in a special test harness.
-
D. Enforcement of coding standards.
Questão 36
Questão
Q. 36: Which of the following types of defects is use case testing MOST LIKELY to
uncover?
i) Defects in the process flows during real-world use of the system.
ii) Defects in the interface parameters in integration testing.
iii) Integration defects caused by the interaction and interference of different components.
iv) Defects in the system as it transitions between one state and another.
Responda
-
A. ii, iii.
-
B. i, iii.
-
C. iii, iv.
-
D. i, ii
Questão 37
Questão
Q. 37: Which of the following is MOST important in the selection of a test approach?
Responda
-
A. Availability of tools to support the proposed techniques.
-
B. The budget allowed for training in proposed techniques.
-
C. Available skills and experience in the proposed techniques.
-
D. The willingness of the test team to learn new techniques.
Questão 38
Questão
Q. 38: Which of the following is a benefit of test independence?
Responda
-
A. It does not require familiarity with the code.
-
B. It is cheaper than using developers to test their own code.
-
C. It avoids author bias in defining effective tests.
-
D. Testers are better at finding defects than developers.
Questão 39
Questão
Q. 39: The above diagram represents the following paths through the code.
A. vwy
B. vwz
C. vxy
D. vxz
What is the MINIMUM combination of paths required to provide full statement coverage?
Responda
-
A. A
-
B. ABD
-
C. ABCD
-
D. ACD
Questão 40
Questão
Q. 40: Which of the following is MOST characteristic of specification based (black-box)
techniques?
Responda
-
A. Test cases can be easily automated.
-
B. Test cases are independent of each other.
-
C. Test cases are derived systematically from models of the system .
-
D. Test cases are derived systematically from the delivered code.
Questão 41
Questão
Q. 41: Which of the following combinations correctly describes a valid approach to
component testing:
i) Functional testing of the component in isolation.
ii) Structure-based testing of the code without recording incidents.
iii) Automated tests that are run until the component passes.
iv) Functional testing of the interfaces between modules.
Responda
-
A. i and ii.
-
B. I, ii and iii
-
C. iii.
-
D. ii and iv
Questão 42
Questão
Q. 42: Which of the following is a purpose of the review planning phase?
Questão 43
Questão
Q. 43: A defect arrival rate curve:
Responda
-
A. Shows the number of newly discovered defects per unit time
-
B. Shows the number of open defects per unit time.
-
C. Shows the cumulative total number of defects found up to this time.
-
D. Any of these, depending on the company.
Questão 44
Questão
Q. 44: Which is the best definition of complete testing:
Responda
-
A. You have discovered every bug in the program.
-
B. You have tested every statement, branch, and combination of branches in the program.
-
C. You have completed every test in the test plan.
-
D. You have reached the scheduled ship date.
Questão 45
Questão
Q. 45: Complete statement and branch coverage means:
Responda
-
A. That you have tested every statement in the program.
-
B. That you have tested every statement and every branch in the program.
-
C. That you have tested every IF statement in the program.
-
D. That you have tested every combination of values of IF statements in the program
Questão 46
Questão
Q. 46: There are several risks of managing your project's schedule with a statistical
reliability model. These include (choose one or more of the following):
Responda
-
A. Testers spend more energy early in the product trying to find bugs than preparing to do
the rest of the project's work more efficiently
-
B. Managers might not realize that the testing effort is ineffective, late in the project,
because they expect a low rate of bug finding, so the low rate achieved doesn't alarm
them.
-
C. It can increase the end-of-project pressure on testers to not find bugs, or to not report
bugs.
-
D. All of the above
Questão 47
Questão
Q. 47: Typical defects that are easier to find in reviews than in dynamic testing are:
Responda
-
A. Deviations from standards,
-
B. Requirement defects,
-
C. Design defects,
-
D. Insufficient maintainability and incorrect interface specifications.
-
E. All of the above.
Questão 48
Questão
Q. 48: Reviews, static analysis and dynamic testing have the same objective
Responda
-
A. Identifying defects.
-
B. Fixing defects.
-
C. A. and B
-
D. None of the above
Questão 49
Questão
Q. 49: We can achieve complete statement coverage but still miss bugs because:
Responda
-
A. The failure occurs only if you reach a statement taking the TRUE branch of an IF
statement, and you got to the statement with a test that passed through the FALSE branch.
-
B. The failure depends on the program's inability to handle specific data values, rather than on the program's flow of control.
-
C. We are not required to test code that customers are unlikely to execute.
-
D. All of the above
Questão 50
Questão
Q. 50: Measurement dysfunction is a problem because:
Responda
-
A. Even though the numbers you look at appear better, to achieve these numbers, people
are doing other aspects of their work much less well.
-
B. We don't know how to measure a variable (our measurement is dysfunctional) and so we don't know how to interpret the result.
-
C. You are measuring the wrong thing and thus reaching the wrong conclusions.
-
D. All of the above.
Questão 51
Questão
Q. 51: Important consequences of the impossibility of complete testing are (Choose one
or more answers):
Responda
-
A. We can never be certain that the program is bug free.
-
B. We have no definite stopping point for testing, which makes it easier for some managers to argue for very little testing.
-
C. We have no easy answer for what testing tasks should always be required, because every task takes time that could be spent on other high importance tasks.
-
D. All of the above.
Questão 52
Questão
Q. 52: Poor software characteristics are
Questão 53
Questão
Q. 53: System testing should investigate
Responda
-
A. Non-functional requirements only not Functional requirements
-
B. Functional requirements only not non-functional requirements
-
C. Non-functional requirements and Functional requirements
-
D. Non-functional requirements or Functional requirements
Questão 54
Questão
Q. 54: Contract and regulation testing is a part of
Responda
-
A. System testing
-
B. Acceptance testing
-
C. Integration testing
-
D. Smoke testing
Questão 55
Questão
Q. 55: Find the correct flow of the phases of a formal review
Responda
-
A. Planning, Review meeting, Rework, Kick off
-
B. Planning, Individual preparation, Kick off, Rework
-
C. Planning, Review meeting, Rework, Follow up
-
D. Planning, Individual preparation, Follow up, Kick off
Questão 56
Questão
Q. 56: Which is not the testing objectives
Questão 57
Questão
Q. 57: Maintenance releases and technical assistance centers are examples of which of
the following costs of quality?
Responda
-
A. External failure
-
B. Internal failure
-
C. Appraisal
-
D. Prevention
Questão 58
Questão
Q. 58: Which is not the project risks
Questão 59
Questão
Q. 59: Bug life cycle
Responda
-
A. Open, Assigned, Fixed, Closed
-
B. Open, Fixed, Assigned, Closed
-
C. Assigned, Open, Closed, Fixed
-
D. Assigned, Open, Fixed, Closed
Questão 60
Questão
Q. 60: Who is responsible for document all the issues, problems and open point that
were identified during the review meeting
Responda
-
A. Moderator
-
B. Scribe
-
C. Reviewers
-
D. Author
Questão 61
Questão
Q. 61: ‘X’ has given a data on a person age, which should be between 1 to 99. Using
BVA which is the appropriate one
Responda
-
A. 0,1,2,99
-
B. 1, 99, 100, 98
-
C. 0, 1, 99, 100
-
D. –1, 0, 1, 99
Questão 62
Questão
Q. 62: Which is not a testing principle
Responda
-
A. Early testing
-
B. Defect clustering
-
C. Pesticide paradox
-
D. Exhaustive testing
Questão 63
Questão
Q. 63: A project that is in the implementation phase is six weeks behind schedule.
The delivery date for the product is four months away. The project is not allowed to slip
the delivery date or compromise on the quality standards established for his product. Which
of the following actions would bring this project back on schedule?
Responda
-
A. Eliminate some of the requirements that have not yet been implemented.
-
B. Add more engineers to the project to make up for lost work.
-
C. Ask the current developers to work overtime until the lost work is recovered.
-
D. Hire more software quality assurance personnel.
Questão 64
Questão
Q. 64: The ___________ Testing will be performed by the people at client own
locations
Responda
-
A. Alpha testing
-
B. Field testing
-
C. Performance testing
-
D. System testing
Questão 65
Questão
Q. 65: Which of the following is the standard for the Software product quality
Responda
-
A. ISO 1926
-
B. ISO 829
-
C. ISO 1012
-
D. ISO 1028
Questão 66
Questão
Q. 66: Which is not a black box testing technique
Responda
-
A. Equivalence partition
-
B. Decision tables
-
C. Transaction diagrams
-
D. Decision testing
Questão 67
Questão
Q. 67: Find the mismatch
Responda
-
A. Test data preparation tools – Manipulate Data bases
-
B. Test design tools – Generate test inputs
-
C. Requirement management tools – Enables individual tests to be traceable
-
D. Configuration management tools – Check for consistence
Questão 68
Questão
Q. 68: Use cases can be performed to test
Responda
-
A. Performance testing
-
B. Unit testing
-
C. Business scenarios
-
D. Static testing
Questão 69
Questão
Q. 69: Purpose of test design technique is
Responda
-
A. Identifying test conditions only, not Identifying test cases
-
B. Not Identifying test conditions, Identifying test cases only
-
C. Identifying test conditions and Identifying test cases
-
D. Identifying test conditions or Identifying test cases
Questão 70
Questão
Q. 70: One person has been dominating the current software process improvement
meeting. Which of the following techniques should the facilitator use to bring other
team members into the discussion?
Responda
-
A. Confront the person and ask that other team members be allowed to express their
opinions.
-
B. Wait for the person to pause, acknowledge the person’ s opinion, and ask for someone
else’ s opinion.
-
C. Switch the topic to an issue about which the person does not have a strong opinion.
-
D. Express an opinion that differs from the person’ s opinion in order to encourage others to express their ideas.
Questão 71
Questão
Q. 71: Stochastic testing using statistical information or operational profiles uses the
following method
Responda
-
A. Heuristic testing approach
-
B. Methodical testing approach
-
C. Model based testing approach
-
D. Process or standard compliant testing approach
Questão 72
Questão
Q. 72: A software model that can’t be used in functional testing
Questão 73
Questão
Q. 73: Arc testing is known as
Responda
-
A. Branch testing
-
B. Agile testing
-
C. Beta testing
-
D. Ad-hoc testing
Questão 74
Questão
Q. 74: The purpose of exit criteria is
Questão 75
Questão
Q. 75: The ___________ technique can be used to achieve input and output coverage
Responda
-
A. Boundary value analysis
-
B. Equivalence partitioning
-
C. Decision table testing
-
D. State transition testing
Questão 76
Questão
Q. 76: The __________ testing is performed at the developing organization’s site
Responda
-
A. Unit testing
-
B. Regression testing
-
C. Alpha testing
-
D. Integration testing
Questão 77
Questão
Q. 77: What is the main purpose of Informal review
Responda
-
A. Inexpensive way to get some benefit
-
B. Find defects
-
C. Learning, gaining understanding, effect finding
-
D. Discuss, make decisions, solve technical problems
Questão 78
Questão
Q. 78: Which is not a Component testing
Responda
-
A. Check the memory leaks
-
B. Check the robustness
-
C. Check the branch coverage
-
D. Check the decision tables
Questão 79
Questão
Q. 79: The software engineer's role in tool selection is
Responda
-
A. To identify, evaluate, and rank tools, and recommend tools to management
-
B. To determine what kind of tool is needed, then find it and buy it
-
C. To initiate the tool search and present a case to management
-
D. To identify, evaluate and select the tools
Questão 80
Questão
Q. 80: Which is not the fundamental test process
Questão 81
Questão
Q. 81: The ________ and ________ are used within individual workbenches to produce
the right output products.
Questão 82
Questão
Q. 82: Which is not the software characteristics
Responda
-
A. Reliability
-
B. Usability
-
C. Scalability
-
D. Maintainability
Questão 83
Questão
Q. 83: The principle of Cyclomatic complexity, considering L as edges or links, N as
nodes, P as independent paths
Responda
-
A. L-N +2P
-
B. N-L +2P
-
C. N-L +P
-
D. N-L +P
Questão 84
Questão
Q. 84: FPA is used to
Responda
-
A. To measure the functional requirements of the project
-
B. To measure the size of the functionality of an Information system
-
C. To measure the functional testing effort
-
D. To measure the functional flow
Questão 85
Questão
Q. 85: A _____ is the step-by-step method followed to ensure that standards are met
Responda
-
A. SDLC
-
B. Project Plan
-
C. Policy
-
D. Procedure
Questão 86
Questão
Q. 86: Which is not a test Oracle
Questão 87
Questão
Q. 87: PDCA is known as
Responda
-
A. Plan, Do, Check, Act
-
B. Plan, Do, Correct, Act
-
C. Plan, Debug, Check, Act
-
D. Plan, Do, Check, Accept
Questão 88
Questão
Q. 88: Which is the non-functional testing
Responda
-
A. Performance testing
-
B. Unit testing
-
C. Regression testing
-
D. Sanity testing
Questão 89
Questão
Q. 89: A Test Plan Outline contains which of the following:
i. Test Items
ii. Test Scripts
iii. Test Deliverables
iv. Responsibilities
Responda
-
A. i,ii,iii are true and iv is false
-
B. i,iii,iv are true and ii is false
-
C. ii,iii are true and i and iv are false
-
D. i,ii are false and iii , iv are true
Questão 90
Questão
Q. 90: Testing where in we subject the target of the test , to varying workloads to
measure and evaluate the performance behaviors and ability of the target and of the
test to continue to function properly under these different workloads.
Responda
-
A. Load Testing
-
B. Integration Testing
-
C. System Testing
-
D. Usability Testing
Questão 91
Questão
Q. 91: Which of the following is the task of a Tester?
i. Interaction with the Test Tool Vendor to identify best ways to leverage test tool on the project.
ii. Prepare and acquire Test Data
iii. Implement Tests on all test levels, execute and log the tests.
iv. Create the Test Specifications
Responda
-
A. i, ii, iii is true and iv is false
-
B. ii,iii,iv is true and i is false
-
C. i is true and ii,iii,iv are false
-
D. iii and iv is correct and i and ii are incorrect
Questão 92
Questão
Q. 92: What can static analysis NOT find?
Responda
-
A. The use of a variable before it has been defined
-
B. Unreachable ("dead") code
-
C. Memory leaks
-
D. Array bound violations
Questão 93
Questão
Q. 93: White Box Techniques are also called as:
Questão 94
Questão
Q. 94: Reviewing the test Basis is a part of which phase
Responda
-
A. Test Analysis and Design
-
B. Test Implementation and execution
-
C. Test Closure Activities
-
D. Evaluating exit criteria and reporting
Questão 95
Questão
Q. 95: Component Testing is also called as :-
i. Unit Testing
ii. Program Testing
iii. Module Testing
iv. System Component Testing .
Responda
-
A. i,ii,iii are true and iv is false
-
B. i,ii,iii,iv are false
-
C. i,ii,iv are true and iii is false
-
D. all of above is true
Questão 96
Questão
Q. 96: Which of the following is not a major task of Exit criteria?
Responda
-
A. Checking test logs against the exit criteria specified in test planning.
-
B. Logging the outcome of test execution.
-
C. Assessing if more tests are needed.
-
D. Writing a test summary report for stakeholders.
Questão 97
Questão
Q. 97: Which of the following is true about Formal Review or Inspection:-
i. Led by Trained Moderator (not the author).
ii. No Pre Meeting Preparations
iii. Formal Follow up process.
iv. Main Objective is to find defects
Responda
-
A. ii is true and i,iii,iv are false
-
B. i,iii,iv are true and ii is false
-
C. i,iii,iv are false and ii is true
-
D. iii is true and I,ii,iv are false
Questão 98
Questão
Q. 98: The Phases of formal review process is mentioned below arrange them in the
correct order.
i. Planning
ii. Review Meeting
iii. Rework
iv. Individual Preparations
v. Kick Off
vi. Follow Up
Responda
-
A. i,ii,iii,iv,v,vi
-
B. vi,i,ii,iii,iv,v
-
C. i,v,iv,ii,iii,vi
-
D. i,ii,iii,v,iv,vi
Questão 99
Questão
Q. 99: Testing activity which is performed to expose defects in the interfaces and in the
interaction between integrated components is :
Questão 100
Questão
Q. 100: Methodologies adopted while performing Maintenance Testing:-
Questão 101
Questão
Q. 101: The Switch is switched off once the temperature falls below 18 and then it is
turned on when the temperature is more than 21. When the temperature is more than
21. Identify the Equivalance values which belong to the same class.
Responda
-
A. 12,16,22
-
B. 24,27,17
-
C. 22,23,24
-
D. 14,15,19
Questão 102
Questão
Q. 102: What is an equivalence partition (also known as an equivalence class)?
Responda
-
A. A set of test cases for testing classes of objects
-
B. An input or output range of values such that only one value in the range becomes a test
case
-
C. An input or output range of values such that each value in the range becomes a test case
-
D. An input or output range of values such that every tenth value in the range becomes a
test case.
Questão 103
Questão
Q. 103: Which of the following is not a part of the Test Implementation and Execution
Phase
Responda
-
A. Creating test suites from the test cases
-
B. Executing test cases either manually or by using test execution tools
-
C. Comparing actual results
-
D. Designing the Tests
Questão 104
Questão
Q. 104: Link Testing is also called as :
Responda
-
A. Component Integration testing
-
B. Component System Testing
-
C. Component Sub System Testing
-
D. Maintenance testing
Questão 105
Questão
Q. 105: Who are the persons involved in a Formal Review :-
i. Manager
ii. Moderator
iii. Scribe / Recorder
iv. Assistant Manager
Responda
-
A. i,ii,iii,iv are true
-
B. i,ii,iii are true and iv is false.
-
C. ii,iii,iv are true and i is false.
-
D. i,iv are true and ii, iii are false.
Questão 106
Questão
Q. 106: Which of the following statements regarding static testing is false:
Responda
-
A. Static testing requires the running of tests through the code
-
B. Static testing includes desk checking
-
C. Static testing includes techniques such as reviews and inspections
-
D. Static testing can give measurements such as cyclomatic complexity
Questão 107
Questão
Q. 107: Designing the test environment set-up and identifying any required
infrastructure and tools are a part of which phase
Responda
-
A. Test Implementation and execution
-
B. Test Analysis and Design
-
C. Evaluating the Exit Criteria and reporting
-
D. Test Closure Activities
Questão 108
Questão
Q. 108: A Type of functional Testing, which investigates the functions relating to
detection of threats, such as virus from malicious outsiders.
Responda
-
A. Security Testing
-
B. Recovery Testing
-
C. Performance Testing
-
D. Functionality Testing
Questão 109
Questão
Q. 109: A Person who documents all the issues, problems and open points that were
identified during a formal review.
Responda
-
A. Moderator.
-
B. Scribe
-
C. Author
-
D. Manager
Questão 110
Questão
Q. 110: The Test Cases Derived from use cases
Responda
-
A. Are most useful in uncovering defects in the process flows during real world use of the
system
-
B. Are most useful in uncovering defects in the process flows during the testing use of the
system
-
C. Are most useful in covering the defects in the process flows during real world use of the
system
-
D. Are most useful in covering the defects at the Integration Level
Questão 111
Questão
Q. 111: One of the fields on a form contains a text box which accepts alpha numeric
values. Identify the Valid Equivalence class
Responda
-
A. BOOK
-
B. Book
-
C. Boo01k
-
D. book
Questão 112
Questão
Q. 112: In a Examination a candidate has to score minimum of 24 marks inorder to clear
the exam. The maximum that he can score is 40 marks. Identify the Valid Equivalance
values if the student clears the exam.
Responda
-
A. 22,23,26
-
B. 21,39,40
-
C. 29,30,31
-
D. 0,15,22
Questão 113
Questão
Q. 113: Verification involves which of the following :-
i. Helps to check the Quality of the built product
ii. Helps to check that we have built the right product.
iii. Helps in developing the product
iv. Monitoring tool wastage and obsoleteness.
Responda
-
A. Options i,ii,iii,iv are true.
-
B. i is true and ii,iii,iv are false
-
C. i,ii,iii are true and iv is false
-
D. ii is true and i,iii,iv are false.
Questão 114
Questão
Q. 114: A Project risk includes which of the following :
Responda
-
A. Organizational Factors
-
B. Poor Software characteristics
-
C. Error Prone software delivered.
-
D. Software that does not perform its intended functions
Questão 115
Questão
Q. 115: Which of the following is a Key Characteristics of Walk Through
Responda
-
A. Scenario , Dry Run , Peer Group
-
B. Pre Meeting Preparations
-
C. Formal Follow Up Process
-
D. Includes Metrics
Questão 116
Questão
Q. 116: Which of the following techniques is NOT a White box technique?
Responda
-
A. Statement Testing and coverage
-
B. Decision Testing and coverage
-
C. Condition Coverage
-
D. Boundary value analysis
Questão 117
Questão
Q. 117: Reporting Discrepancies as incidents is a part of which phase :-
Responda
-
A. Test Analysis and Design
-
B. Test Implementation and execution
-
C. Test Closure Activities
-
D. Evaluating exit criteria and reporting
Questão 118
Questão
Q. 118: In a risk-based approach the risks identified may be used to :
i. Determine the test technique to be employed
ii. Determine the extent of testing to be carried out
iii. Prioritize testing in an attempt to find critical defects as early as possible.
iv. Determine the cost of the project
Responda
-
A. ii is True; i, iii, iv & v are False
-
B. i,ii,iii are true and iv is false
-
C. ii & iii are True; i, iv are False
-
D. ii, iii & iv are True; i is false
Questão 119
Questão
Q. 119: Incidents would not be raised against:
Questão 120
Questão
Q. 120: The Planning phase of a formal review includes the following :
Responda
-
A. Explaining the objectives
-
B. Selecting the personnel, allocating roles.
-
C. Follow up
-
D. Individual Meeting preparations
Questão 121
Questão
Q. 121: Test Implementation and execution has which of the following major tasks?
i. Developing and prioritizing test cases, creating test data, writing test procedures and
optionally preparing the test harnesses and writing automated test scripts.
ii. Creating the test suite from the test cases for efficient test execution.
iii. Verifying that the test environment has been set up correctly.
iv. Determining the exit criteria.
Responda
-
A. i,ii,iii are true and iv is false
-
B. i,,iv are true and ii is false
-
C. i,ii are true and iii,iv are false
-
D. ii,iii,iv are true and i is false
Questão 122
Questão
Q. 122: One of the fields on a form contains a text box which accepts numeric values in
the range of 18 to 25. Identify the invalid Equivalance class
Questão 123
Questão
Q. 123: Exhaustive Testing is
Responda
-
A. Is impractical but possible
-
B. Is practically possible
-
C. Is impractical and impossible
-
D. Is always possible
Questão 124
Questão
Q. 124: Hand over of Testware is a part of which Phase
Responda
-
A. Test Analysis and Design
-
B. Test Planning and control
-
C. Test Closure Activities
-
D. Evaluating exit criteria and reporting
Questão 125
Questão
Q. 125: Which one is not comes under international standard
Responda
-
A. IEC
-
B. IEEE
-
C. ISO
-
D. All of the above
Questão 126
Questão
Q. 126: In which phase static tests are used
Responda
-
A. Requirements
-
B. Design
-
C. Coding
-
D. All of the above
Questão 127
Questão
Q. 127: What's the disadvantage of Black Box Testing
Responda
-
A. Chances of having repetition of tests that are already done by programmer.
-
B. The test inputs needs to be from large sample space.
-
C. It is difficult to identify all possible inputs in limited testing time. So writing test cases is
slow and difficult
-
D. All above
Questão 128
Questão
Q. 128: Static analysis tools are typically used by
Responda
-
A. Testers
-
B. Developers
-
C. Testers & Developers
-
D. None
Questão 129
Questão
Q. 129: Majority of system errors occur in the _________ phase
Questão 130
Questão
Q. 130: The specification which describes steps required to operate the system and
exercise test cases in order to implement the associated test design
Responda
-
A. Test Case Specification
-
B. Test Design Specification
-
C. Test Procedure Specification
-
D. None
Questão 131
Questão
Q. 131: How much percentage of the life cycle costs of a software are spent on
maintenance.
Responda
-
A. 10%
-
B. 30%
-
C. 50%
-
D. 70%
Questão 132
Questão
Q. 132: When a defect is detected and fixed then the software should be retested to
confirm that the original defect has been successfully removed. This is called
Responda
-
A. Regression testing
-
B. Maintenance testing
-
C. Confirmation testing
-
D. None of the above
Questão 133
Questão
Q. 133: Equivalence testing divides the input domain into classes of data from which
test cases can be derived to reduce the total number of test cases that must be
developed.
Questão 134
Questão
Q. 134: When to stop Testing?
Responda
-
A. Stop when scheduled time for testing expires
-
B. Stop if 75% of the pre-defined number of errors is detected.
-
C. Stop when all the test cases execute with detecting few errors.
-
D. None above
Questão 135
Questão
Q. 135: With thorough testing it is possible to remove all defects from a program prior
to delivery to the customer.
Questão 136
Questão
Q. 136: Structure is unknown for which type of development project
Questão 137
Questão
Q. 137: ________indicates how important it is to fix the bug and when it should be
fixed
Responda
-
A. Severity
-
B. Priority
-
C. All of the above
-
D. None of the above
Questão 138
Questão
Q. 138: The person who leads the review of the document(s), planning the
review,running the meeting and follow-up after the meeting
Responda
-
A. Reviewer
-
B. Author
-
C. Moderator
-
D. Auditor
Questão 139
Questão
Q. 139: Performs sufficient testing to evaluate every possible path and condition in the
application system. The only test method that guarantees the proper functioning of the
application system is called as _____________
Responda
-
A. Regression Testing
-
B. Exhaustive Testing
-
C. Basic Path Testing
-
D. Branch Testing
Questão 140
Questão
Q. 140: Quality Assurance is the process by which product quality is compared with the
application standards and the action taken when nonconformance is detected.
Questão 141
Questão
Q. 141: A formal assessment of a work product conducted by one or more qualified
independent reviewer to detect defects.
Responda
-
A. Inspection.
-
B. Walkthrough.
-
C. Review
-
D. Non Conformance
Questão 142
Questão
Q. 142: Test Case are grouped into Manageable (and scheduled) units are called as
Responda
-
A. Test Harness
-
B. Test Suite
-
C. Test Cycle
-
D. Test Driver
Questão 143
Questão
Q. 143: Configuration and compatibility testing are typically good choices for
outsourcing
Questão 144
Questão
Q. 144: What type of tools to be used for Regression Testing
Responda
-
A. Performance
-
B. Record/Playback
-
C. A. & B.
-
D. None
Questão 145
Questão
Q. 145: System Integration testing should be done after
Questão 146
Questão
Q. 146: During this event the entire system is tested to verify that all functional
information structural and quality requirements have been met. A predetermined
combination of tests is designed that when executed successfully satisfy management
that the system meets specifications
Questão 147
Questão
Q. 147: What is the normal order of activities in which software testing is organized?
Responda
-
A. Unit, integration, system, validation
-
B. System, integration, unit, validation
-
C. Unit, integration, validation, system
-
D. None of the above
Questão 148
Questão
Q. 148: The goal of a software tester is to find bugs, find them as early as possible and
make sure they get fixed.
Questão 149
Questão
Q. 149: Beta testing is performed at developing organization's site where as Alpha
testing is performed by people at their own locations.
Questão 150
Questão
Q. 150: The principal attributes of tools and automation are
Responda
-
A. Speed & efficiency
-
B. Accuracy & precision
-
C. All of the above
-
D. None of the above
Questão 151
Questão
Q. 151: In ______ testing doesn't know anything about the sofware being tested; it just
clicks or types randomly.
Responda
-
A. Random testing
-
B. Gorilla testing
-
C. Adhoc testing
-
D. Dumb monkey testing
Questão 152
Questão
Q. 152: A series of probing questions about the completeness and attributes of an
application system is called
Responda
-
A. Checklist
-
B. Checkpoint review
-
C. Decision table
-
D. Decision tree
Questão 153
Questão
Q. 153: The testing technique that requires devising test cases to demonstrate that
each program function is operational is called
Responda
-
A. Black-box testing
-
B. Glass-box testing
-
C. Grey-box testing
-
D. White-box testing
Questão 154
Questão
Q. 154: A white box testing technique that measures the number of or percentage of
decision directions executed by the test case designed is called
Questão 155
Questão
Q. 155: Which summarizes the testing activities associated with one or more test design
specifications.
Responda
-
A. Test Summary report
-
B. Test Log
-
C. Test Incident Report
-
D. Test Script
Questão 156
Questão
Q. 156: Testing with out a real plan and test cases is called ---
Responda
-
A. Gorilla testing
-
B. Monkey testing
-
C. Adhoc testing
-
D. All of the above
Questão 157
Questão
Q. 157: Which rule should not be followed for reviews
Responda
-
A. Defects and issues are identified and corrected
-
B. The product is reviewed not the producer
-
C. All members of the reviewing team are responsible for the result of the review
-
D. Each review has a clear predefined objective
Questão 158
Questão
Q. 158: Verification can be termed as 'Are we building the product right?"
Questão 159
Questão
Q. 159: Which testing is used to verify that the system can perform properly when
internal program or system limitations have been exceeded
Responda
-
A. Stress Testing
-
B. Load Testing
-
C. Performance Testing
-
D. Volume testing
Questão 160
Questão
Q. 160: Defects are recorded into three major purposes. They are:
1.To correct the defect
2.To report status of the application
3.To improve the software development process
Questão 161
Questão
Q. 161: Drivers are tools used to control and operate tge software being testeD.
Questão 162
Questão
Q. 162: Typical defects discovered by static analysis includes
Responda
-
A. Programming standard violations
-
B. Referring a variable with an undefined value
-
C. Security vulnerabilities
-
D. All Above
Questão 163
Questão
Q. 163: EULA stands for
Responda
-
A. End Usability License Agreement
-
B. End User License Agreement
-
C. End User License Arrangement
-
D. End User License Attachment
Questão 164
Questão
Q. 164: ________is a very early build intended for limited distribution to a few key
customers and to marketing for demonstration purposes.
Responda
-
A. Alpha release
-
B. Beta release
-
C. Test release document
-
D. Build
Questão 165
Questão
Q. 165: CAST stands for
Responda
-
A. Computer Aided Software Testing
-
B. Computer Aided Software Tools
-
C. Computer Analysis Software Techniques
-
D. None
Questão 166
Questão
Q. 166: The tool modifies the program code or manipulates tge operating environment
in any way is considered non-invasive
Questão 167
Questão
Q. 167: Which test may not mimic real world situations
Responda
-
A. Functional testing
-
B. Structural Testing
-
C. All of the above
-
D. None of the above
Questão 168
Questão
Q. 168: _______ includes both Black box and White Box Testing features
Responda
-
A. Gray Box Testing
-
B. Hybrid Testing
-
C. A. & B.
-
D. None
Questão 169
Questão
Q. 169: Exhaustive testing is possible
Questão 170
Questão
Q. 170: Tool which stores requirement statements, check for consistency and allow
requirements to be prioritized and enable individual tests to be traceable to
requirements, functions and features.
Responda
-
A. Incident management tools
-
B. Requirements management tools
-
C. Configuration management tools
-
D. None
Questão 171
Questão
Q. 171: The number of tests to test all control statements equals the cyclomatic
complexity
Questão 172
Questão
Q. 172: Boundary value analysis can only be used during white-box testing.
Questão 173
Questão
Q. 173: Which of these are objectives for software testing?
Responda
-
A. Determine the productivity of programmers
-
B. Eliminate the need for future program maintenance
-
C. Eliminate every error prior to release
-
D. Uncover software errors
Questão 174
Questão
Q. 174: Failure is _________
Responda
-
A. Incorrect program behaviour due to a fault in the program
-
B. Bug found before product Release
-
C. Bug found after product Release
-
D. Bug found during Design phase
Questão 175
Questão
Q. 175: During the software development process, at what point can the test process
start?
Responda
-
A. When the code is complete.
-
B. When the design is complete.
-
C. When the software requirements have been approved.
-
D. When the first code module is ready for unit testing
Questão 176
Questão
Q. 176: "How much testing is enough?"
Responda
-
A. This question is impossible to answer
-
B. This question is easy to answer
-
C. The answer depends on the risk for your industry, contract and special requirements
-
D. This answer depends on the maturity of your developers
Questão 177
Questão
Q. 177: Which of the following tools would be involved in the automation of regression
test?
Responda
-
A. Data tester
-
B. Boundary tester
-
C. Capture/Playback
-
D. Output comparator.
Questão 178
Questão
Q. 178: Incorrect form of Logic coverage is:
Responda
-
A. Statement Coverage
-
B. Pole Coverage
-
C. Condition Coverage
-
D. Path Coverage
Questão 179
Questão
Q. 179: Code Coverage is used as a measure of what?
Responda
-
A. Defects
-
B. Trends analysis
-
C. Test Effectiveness
-
D. Time Spent Testing
Questão 180
Questão
Q. 180: Fault Masking is
Responda
-
A. Error condition hiding another error condition
-
B. Creating a test case which does not reveal a fault
-
C. Masking a fault by developer
-
D. Masking a fault by a tester
Questão 181
Questão
Q. 181: Which of the following is not a quality characteristic listed in ISO 9126
Standard?
Responda
-
A. Functionality
-
B. Usability
-
C. Supportability
-
D. Maintainability
Questão 182
Questão
Q. 182: One Key reason why developers have difficulty testing their own work is :
Questão 183
Questão
Q. 183: Statement Coverage will not check for the following.
Responda
-
A. Missing Statements
-
B. Unused Branches
-
C. Dead Code
-
D. Unused Statement
Questão 184
Questão
Q. 184: Given the Following program
IF X <>= Z
THEN Statement 2;
END
McCabe’s Cyclomatic Complexity is :
Questão 185
Questão
Q. 185: To test a function, the programmer has to write a _________, which calls the
function to be tested and passes it test data.
Responda
-
A. Stub
-
B. Driver
-
C. Proxy
-
D. None of the above
Questão 186
Questão
Q. 186: Pick the best definition of quality
Questão 187
Questão
Q. 187: Boundary value testing
Responda
-
A. Is the same as equivalence partitioning tests
-
B. Test boundary conditions on, below and above the edges of input and output equivalence
classes
-
C. Tests combinations of input circumstances
-
D. Is used in white box testing strategy
Questão 188
Questão
Q. 188: An input field takes the year of birth between 1900 and 2004
The boundary values for testing this field are
Responda
-
A. 0,1900,2004,2005
-
B. 1900, 2004
-
C. 1899,1900,2004,2005
-
D. 1899, 1900, 1901,2003,2004,2005
Questão 189
Questão
Q. 189: How many test cases are necessary to cover all the possible sequences of
statements (paths) for the following program fragment? Assume that the two conditions
are independent of each other:
if (Condition 1)
then statement 1
else statement 2
fi
if (Condition 2)
then statement 3
fi
Responda
-
A. 2 Test Cases
-
B. 3 Test Cases
-
C. 4 Test Cases
-
D. Not achievable
Questão 190
Questão
Q. 190: A common test technique during component test is
Questão 191
Questão
Q. 191: In a review meeting a moderator is a person who
Responda
-
A. Takes minutes of the meeting
-
B. Mediates between people
-
C. Takes telephone calls
-
D. Writes the documents to be reviewed
Questão 192
Questão
Q. 192: Acceptance test cases are based on what?
Responda
-
A. Requirements
-
B. Design
-
C. Code
-
D. Decision table
Questão 193
Questão
Q. 193: Which one of the following are non-functional testing methods?
Responda
-
A. System testing
-
B. Usability testing
-
C. Performance testing
-
D. Both B & C
Questão 194
Questão
Q. 194: Independent Verification & Validation is
Questão 195
Questão
Q. 195: Defect Management process does not include
Questão 196
Questão
Q. 196: Which of the following could be a reason for a failure
1) Testing fault
2) Software fault
3) Design fault
4) Environment Fault
5) Documentation Fault
Responda
-
A. 2 is a valid reason; 1,3,4 & 5 are not
-
B. 1,2,3,4 are valid reasons; 5 is not
-
C. 1,2,3 are valid reasons; 4 & 5 are not
-
D. All of them are valid reasons for failure
Questão 197
Questão
Q. 197: Test are prioritized so that:
Responda
-
A. You shorten the time required for testing
-
B. You do the best testing in the time available
-
C. You do more effective testing
-
D. You find more faults
Questão 198
Questão
Q. 198: When a new testing tool purchased, it should be used first by:
Responda
-
A. A small team to establish the best way to use the tool
-
B. Everyone who may eventually have some use for the tool
-
C. The independent testing team
-
D. The vendor contractor to write the initial scripts
Questão 199
Questão
Q. 199: During which test activity could faults be found most cost effectively?
Questão 200
Questão
Q. 200: What is the difference between testing software developed by contractor
outside your country, versus testing software developed by a contractor within your
country?
Responda
-
A. Does not meet people needs
-
B. Cultural difference
-
C. Loss of control over reallocation of resources
-
D. Relinquishments of control