4.2 Steam Turbine Auxillaries and Operation

Descrição

power engineering 3b2 Quiz sobre 4.2 Steam Turbine Auxillaries and Operation, criado por TRAVIS CANNING em 29-02-2016.
TRAVIS CANNING
Quiz por TRAVIS CANNING, atualizado more than 1 year ago
TRAVIS CANNING
Criado por TRAVIS CANNING quase 9 anos atrás
27
1

Resumo de Recurso

Questão 1

Questão
In a turbine circuit, feed heaters and dearators serve to:
Responda
  • use up excess steam
  • Increase efficiency
  • Provide load during low demand periods
  • Increase turbine output

Questão 2

Questão
The high-pressure oil system of a typical turbine supplies oil to
Responda
  • Bearings
  • Gears
  • Emergency stop valves
  • The oil purifier
  • The auxillary oil pump

Questão 3

Questão
When starting a condensing or extraction turbine, the extraction (condensate)pump is started ______ the _____ 1. before 2. after 3. air ejector 4. jacking oil pump 5. condenser circulating water pump
Responda
  • 1,3
  • 2,3
  • 1,4
  • 1,5
  • 2,5

Questão 4

Questão
When starting an extraction turbine, sealing steam to the turbine glands is admitted _____ is put in operation
Responda
  • Before the extraction pump
  • Before the condenser circulating water pump
  • After the air ejector
  • After the extraction pump
  • After the throttle valve is open

Questão 5

Questão
The jacking oil pump is shut down when the turbine reaches a speed of approximately _____ rpm
Responda
  • 5-10
  • 20-30
  • 40-50
  • 50-60
  • 0-80

Questão 6

Questão
The overspeed trip a turbine is usually set to trip the mechanism when it reaches ____ of operating speed
Responda
  • 100%
  • 105%
  • 110%
  • 115%
  • 120%

Questão 7

Questão
Lubricating oil for a turbine may: 1. Lubricate bearings 2. Lubricate gears. 3. Operate throttle valves. 4. Be supplied to a governor.
Responda
  • 1,2
  • 3,4
  • 1,2,3
  • 2,3,4
  • 1,2,3,4

Questão 8

Questão
When a hydraulic overspeed trip operates 1. High pressure oil forces the main steam valve shut. 2. High pressure oil supply is shut off 3. The stop valve oil cylinder drain is closed. 4. The stop valve oil cylinder drain is opened 5. A spring closes the main steam valve 6. The pilot drain is closed
Responda
  • 1,3,6
  • 2,4,5
  • 3,4,6
  • 2,4,6
  • 3,4,5

Questão 9

Questão
The warm up time required of a turbine is dependant on
Responda
  • How quickly the turbine is required
  • The manufacturers instructions
  • The size of the turbine
  • The type of turbine
  • Whether the steam is dry or wet

Questão 10

Questão
Overload governing is used on ______ turbines
Responda
  • Small
  • Impulse
  • Low pressure
  • Reaction
  • Impulse and Reaction

Semelhante

Segunda Guerra Mundial 1939-1945
Alessandra S.
Simulado ExamTime
Alessandra S.
Filmes Sobre História
Alessandra S.
Dicas para Estudar para o Concurso da Caixa
Alessandra S.
RESUMOS EXAME GEOGRAFIA A
beatriizcunha
GEOGRAFIA - GEOPOLITICA
neusamiotto
Código de Ética dos Profissionais de Enfermagem
Gi Oliveira
REAÇÕES QUÍMICAS
alessandra
Fatoração de Polinômios
Sara Helena
Bioética em Enfermagem
Sachiko Chan
Lista de Adjetivos Mais Usados com os Comparativos em Inglês
Paula Simões