Questão 1

Questão
The SAP Going Live Check is split into two sections: Analysis and Verification. What are the recommendations regarding delivery of these sessions? (More than one answer is correct. Please choose the correct answers.)
Responda
  • All sessions should be delivered before the project go-live.
  • All sessions should be delivered after the project go-live.
  • Going Live Analysis is conducted at minimum four weeks before the project go-live, during the realisation phase.
  • Going Live Verification is scheduled after the start of production, during the Go Live Support phase.
  • All sessions are delivered by certified consultants from SAP Active Global Support through a remote connection.

Questão 2

Questão
Which are the deliverables of the Technical Solution Management work stream in the Realisation phase?
Responda
  • Define General Settings and Master Data.
  • Quality Assurance Environment (QAS).
  • Technical Solution Design.
  • Technical Operations and Handover Plan.
  • SAP Going Live Check,

Questão 3

Questão
What is the purpose of the Technical Solution Management work stream in the project preparation phase? (One answer)
Responda
  • To define General Settings and Master Data for the project.
  • To deliver QA and Production environments and finalize the development of the operations handbook.
  • To define and develop the Organisational and Production Support Readiness Check
  • To start preparation of essential technical and infrastructure deliverables that support the initial project planning of an SAP implementation project.
  • To prepare a strategy to hand off operations of the solution landscape to the post-production support organisation.

Questão 4

Questão
Which are the tasks of the deliverable 'Development Environment (DEV)' in the Blueprint phase? (More than one answer is correct. Please choose the correct answers.)
Responda
  • Execute Technical Installation of SAP Products for DEV
  • Create master data in DEV environment - Master Data #1 - n
  • Conduct Design Review Service
  • Perform Manual Configuration in DEV
  • Import Configuration and Development Objects to QAS

Questão 5

Questão
Which transaction code in SAP Solution Manager is used to set up project documentation standards? (One answer)
Responda
  • SOLAR01
  • RMMAIN
  • SOLAR02
  • SOLAR_PROJECT_ADMIN
  • SOLAR_LEARNING_MAP

Semelhante

13 motivos para usar Tecnologia na Educação
Alessandra S.
Administração Geral e Pública - Receita Federal - Auditor Fiscal
Alessandra S.
Sistema Respiratório
GoConqr suporte .
Processos PMBOK 5ª edição
Clenia Paradela
Direito Constitucional Esquematizado - Pedro Lenza - Capítulo 3
Anaximandro Martins Leão
Plano de estudos ENEM - Parte 1 *Humanas
GoConqr suporte .
Anatomia: sistema esquelético I
Natália Abitbol
Geometria Espacial
nathielecosta
Contextualização da Aula 3 - Tecnologia na Formação Profissional - SAÚDE
Fabrícia Assunção
REINO MONERA 7 ANO CAPÍTULO 3
Taína Garcia Moreno Tomazella