Resource summary

Question 1

Question
The inputs for developing a test plan are taken from
Answer
  • A. Project plan
  • B. Business plan
  • C. Support plan
  • D. None of the above

Question 2

Question
A tool that supports traceability, recording of incidents or scheduling of tests is
Answer
  • A. A dynamic analysis tool
  • B. A test execution tool
  • C. A debugging tool
  • D. A test management tool
  • E. A configuration management tool

Question 3

Question
Which of the following is not a static testing technique
Answer
  • A. Error guessing
  • B. Walkthrough
  • C. Data flow analysis
  • D. Inspections

Question 4

Question
Which document specifies the sequence of test executions?
Answer
  • A. Test procedure specification
  • B. Test design specification
  • C. Test case specification
  • D. Test plan

Question 5

Question
Inspections can find all the following except
Answer
  • A. Variables not defined in the code
  • B. Spelling and grammar faults in the documents
  • C. Requirements that have been omitted from the design documents
  • D. How much of the code has been covered

Question 6

Question
Which of the following is not a characteristic for Testability?
Answer
  • A. Operability
  • B. Observability
  • C. Simplicity
  • D. Robustness

Question 7

Question
Software testing accounts to what percent of software development costs?
Answer
  • A. 10-20
  • B. 40-50
  • C. 70-80
  • D. 5-10

Question 8

Question
Which tool can be used to support and control part of the test management process?
Answer
  • A. Coverage management tool
  • B. Test management tool
  • C. Data preparation tool
  • D. Performance testing tool

Question 9

Question
If an expected result is not specified then:
Answer
  • A. We cannot run the test
  • B. It may be difficult to repeat the test
  • C. It may be difficult to determine if the test has passed or failed
  • D. We cannot automate the user inputs

Question 10

Question
When should we stop our testing?
Answer
  • A. This question is difficult to answer
  • B. The answer depends on the contract with the client, special requirements if any & risks your organization is willing to take
  • C. The answer depends on the experience & maturity of your developers
  • D. The answer should be standardized for the software development industry

Question 11

Question
The purpose of requirement phase is
Answer
  • A. To freeze requirements
  • B. To understand user needs
  • C. To define the scope of testing
  • D. All of the above

Question 12

Question
Which of these can be successfully tested using Loop Testing methodology?
Answer
  • A. Simple Loops
  • B. Nested Loops
  • C. Concatenated Loops
  • D. All of the above

Question 13

Question
Cyclomatic Complexity method comes under which testing method.
Answer
  • A. White box
  • B. Black box
  • C. Green box
  • D. Yellow box

Question 14

Question
A reliable system will be one that:
Answer
  • A. Is unlikely to be completed on schedule
  • B. Is unlikely to cause a failure
  • C. Is likely to be fault-free
  • D. Is likely to be liked by the users

Question 15

Question
Which, in general, is the least required skill of a good tester?
Answer
  • A. Being diplomatic
  • B. Able to write software
  • C. Having good attention to detail
  • D. Able to be relied on

Question 16

Question
A regression test:
Answer
  • A. Will always be automated
  • B. Will help ensure unchanged areas of the software have not been affected
  • C. Will help ensure changed areas of the software have not been affected
  • D. Can only be run during user acceptance testing

Question 17

Question
Function/Test matrix is a type of
Answer
  • A. Interim Test report
  • B. Final test report
  • C. Project status report
  • D. Management report

Question 18

Question
The process starting with the terminal modules is called:
Answer
  • A. Top-down integration
  • B. Bottom-up integration
  • C. None of the above
  • D. Module integration

Question 19

Question
Verification is:
Answer
  • A. Checking that we are building the right system
  • B. Checking that we are building the system right
  • C. Performed by an independent test team
  • D. Making sure that it is what the user really wants

Question 20

Question
The difference between re-testing and regression testing is
Answer
  • A. Re-testing is running a test again; regression testing looks for unexpected side effects
  • B. Re-testing looks for unexpected side effects; regression testing is repeating those tests
  • C. Re-testing is done after faults are fixed; regression testing is done earlier
  • D. Re-testing uses different environments, regression testing uses the same environment
  • E. Re-testing is done by developers, regression testing is done by independent testers

Question 21

Question
Testing should be stopped when:
Answer
  • A. All the planned tests have been run
  • B. Time has run out
  • C. All faults have been fixed correctly
  • D. Both A. and C.
  • E. I depends on the risks for the system being tested

Question 22

Question
Which test technique is based on requirements specifications?
Answer
  • A. White-box technique
  • B. Component testing
  • C. Black-box technique
  • D. Data driven testing

Question 23

Question
Which of the following is NOT part of configuration management:
Answer
  • A. Status accounting of configuration items
  • B. Auditing conformance to ISO9001
  • C. Identification of test versions
  • D. Record of changes to documentation over time
  • E. controlled library access

Question 24

Question
A test plan defines
Answer
  • A. What is selected for testing
  • B. Objectives and results
  • C. Expected results
  • D. Targets and misses

Question 25

Question
A tool that supports traceability, recording of incidents or scheduling of tests is called
Answer
  • A. A dynamic analysis tool
  • B. A test execution tool
  • C. A debugging tool
  • D. A test management tool
  • E. A configuration management tool

Question 26

Question
The cost of fixing a fault:
Answer
  • A. Is not important
  • B. Increases as we move the product towards live use
  • C. Decreases as we move the product towards live use
  • D. Is more expensive if found in requirements than functional design
  • E. Can never be determined

Question 27

Question
Order numbers on a stock control system can range between 10000 and 99999 inclusive. Which of the following inputs might be a result of designing tests for only valid equivalence classes and valid boundaries:
Answer
  • A. 1000, 5000, 99999
  • B. 9999, 50000, 100000
  • C. 10000, 50000, 99999
  • D. 10000, 99999
  • E. 9999, 10000, 50000, 99999, 10000

Question 28

Question
When what is visible to end-users is a deviation from the specific or expected behavior, this is called:
Answer
  • A. An error
  • B. A fault
  • C. A failure
  • D. A defect
  • E. A mistake

Question 29

Question
Which of the following can be tested as part of operational testing?
Answer
  • A. Component interaction
  • B. Probe effect
  • C. State transition
  • D. Disaster recovery

Question 30

Question
Given the following: Switch PC on Start "outlook" IF outlook appears THEN Send an email Close outlook
Answer
  • A. 1 test for statement coverage, 1 for branch coverage
  • B. 1 test for statement coverage, 2 for branch coverage
  • C. 1 test for statement coverage. 3 for branch coverage
  • D. 2 tests for statement coverage, 2 for branch coverage
  • E. 2 tests for statement coverage, 3 for branch coverage

Question 31

Question
Test managers should not:
Answer
  • A. Report on deviations from the project plan
  • B. Sign the system off for release
  • C. Re-allocate resource to meet original plans
  • D. Rise incidents on faults that they have found
  • E. Provide information for risk analysis and quality improvement

Question 32

Question
Which of the following is NOT part of system testing:
Answer
  • A. Business process-based testing
  • B. Performance, load and stress testing
  • C. Requirements-based testing
  • D. Usability testing
  • E. Top-down integration testing

Question 33

Question
When a new testing tool is purchased, it should be used first by:
Answer
  • A. A small team to establish the best way to use the tool
  • B. Everyone who may eventually have some use for the tool
  • C. The independent testing team
  • D. The managers to see what projects it should be used in
  • E. The vendor contractor to write the initial scripts

Question 34

Question
Which of the following is not part of performance testing:
Answer
  • A. Measuring response time
  • B. Measuring transaction rates
  • C. Recovery testing
  • D. Simulating many users
  • E. Generating many transactions

Question 35

Question
What is the purpose of test completion criteria in a test plan:
Answer
  • A. To know when a specific test has finished its execution
  • B. To ensure that the test case specification is complete
  • C. To set the criteria used in generating test inputs
  • D. To know when test planning is complete
  • E. To plan when to stop testing

Question 36

Question
Given the following code, which is true: IF A > B THEN C = A � B ELSE C = A + B ENDIF Read D IF C = D Then Print "Error" ENDIF
Answer
  • A. 1 test for statement coverage, 3 for branch coverage
  • B. 2 tests for statement coverage, 2 for branch coverage
  • C. 2 tests for statement coverage. 3 for branch coverage
  • D. 3 tests for statement coverage, 3 for branch coverage
  • E. 3 tests for statement coverage, 2 for branch coverage

Question 37

Question
Unreachable code would best be found using:
Answer
  • A. Code reviews
  • B. Code inspections
  • C. A coverage tool
  • D. A test management tool
  • E. A static analysis tool

Question 38

Question
What information need not be included in a test incident report:
Answer
  • A. How to fix the fault
  • B. How to reproduce the fault
  • C. Test environment details
  • D. Severity, priority
  • E. The actual and expected outcomes

Question 39

Question
Which of the following is NOT included in the Test Plan document of the Test Documentation Standard:
Answer
  • A. Test items (i.e. software versions)
  • B. What is not to be tested
  • C. Test environments
  • D. Quality plans
  • E. Schedules and deadlines

Question 40

Question
IEEE 829 test plan documentation standard contains all of the following except:
Answer
  • A. Test items
  • B. Test deliverables
  • C. Test tasks
  • D. Test environment
  • E. Test specification
Show full summary Hide full summary

Similar

German GCSE Vocab
naomisargent
Biology Unit 1
hannahsanderson1
GROUPED DATA FREQUENCY TABLES: MODAL CLASS AND ESTIMATE OF MEAN
Elliot O'Leary
Essay Outline
Kai Ladd
GCSE Mathematics Topics
goldsmith.elisa
Business Management Exam Review Quiz
emily_hill
EOY Revision of Year 8 - Science
Luca Cameron
chemsitry as level topic 5 moles and equations
Talya Hambling
Medical Terminology
khachoe_pema
No more diets
amna mohd
Mezinárodní ekonomie 2SE221,2SE201 (1)
Filip Wimmer