Intake8 BIM L7

Description

Quiz on Intake8 BIM L7, created by Stanley Chia on 16/03/2016.
Stanley Chia
Quiz by Stanley Chia, updated more than 1 year ago
Stanley Chia
Created by Stanley Chia over 8 years ago
366
4

Resource summary

Question 1

Question
The Integrated Model
Answer
  • is on a single authoring platform
  • is form by linking many models

Question 2

Question
The Federated Model
Answer
  • is on a single authoring platform
  • is form by linking many models

Question 3

Question
Types of CLASHES or ISSUES include:
Answer
  • Lack of detail
  • Not viable/constructible/cannot be installed
  • Inconsistency between trades
  • Code / headroom requirements
  • Structural connectivity
  • Aesthetics
  • Inter-trade interfacing
  • Geometric clash

Question 4

Question
Clashes are detected through:
Answer
  • Actual Modelling
  • Visual Checking
  • Automatic Clash Detection
  • Installing sensors in the building elements

Question 5

Question
Lean Coordination preaches Clash AVOIDANCE instead of Clash DETECTION
Answer
  • True
  • False
Show full summary Hide full summary

Similar

Speed, Distance, Time
Bradley Sansom
Year 11 Psychology - Intro to Psychology and Research Methods
stephanie-vee
Physics GCSE AQA Unit 1 quiz
Adorkable_dreamer
Psychology A1
Ellie Hughes
Biology B2.3
Jade Allatt
To Kill a Mockingbird -Analysis of Major Characters
sungiemarie
PSBD TEST # 3_1
yog thapa
What is Marketing?
Stephanie Natasha
Comparative Studies 2016: The Plough and The Stars, Foster, The King's Speech
Lorenzo Battilocchi
Core 1.3 Energy Generation, Storage and Use
T Andrews