Dovetail Manual Testing 1-60

Description

dovetail manual testing
rabi kr shaw
Quiz by rabi kr shaw, updated more than 1 year ago
rabi kr shaw
Created by rabi kr shaw over 7 years ago
677
13

Resource summary

Question 1

Question
Function returns the starting position of one string within another, and is case sensitive?
Answer
  • Find(Instring)
  • Search

Question 2

Question
The basic criteria to be followed while testing a web application are
Answer
  • Flow
  • Page
  • Hyperlink Testing
  • All-path

Question 3

Question
In which type of testing, look and feel consistency comes?
Answer
  • a. Usability
  • b. GUI
  • c. Basic Functional ….
  • d. All

Question 4

Question
Key techniques used in security testing are
Answer
  • a. SQL injection
  • b. Phishing
  • c. Vulnerability
  • d. All

Question 5

Question
In which stage QE starts I. Design II. Development
Answer
  • a. I
  • b. II
  • c. Both
  • d. None

Question 6

Question
Are interfaces of web application
Answer
  • a. Application sever interface
  • b. DB server interface
  • c. Web Server Interface
  • d. Web & application server interface and application &DB interface

Question 7

Question
A new test case is added in QC using
Answer
  • a. Add new test case
  • b. Add new test set
  • c. New test case
  • d. New test set
  • e. All

Question 8

Question
Testing is critical in web application testing
Answer
  • a. Compatibility
  • b. DB

Question 9

Question
------ is a way of attempting to acquire information such as Usernames, password, and Credit card details by masquerading as a trustworthy entity in an electronic communication.
Answer
  • a. SQL injection
  • b. Phishing
  • c. Vulnerability
  • d. All

Question 10

Question
Stress testing is -----(check box)
Answer
  • a. Memory leaks
  • b. Race Conditions
  • c. Synchronization issues
  • d. None

Question 11

Question
To accommodate future loads, you need to know how many additional resources are necessary to support future usage levels.
Answer
  • Capacity testing
  • None

Question 12

Question
Simulators play big role when are no mobile devices available for testing.
Answer
  • True
  • False

Question 13

Question
is responsible for installing the solution into the PROD environment.
Answer
  • Release Management
  • Test team

Question 14

Question
Find Bugs is a static analysis tool that examines your class or JAR files.
Answer
  • True
  • False

Question 15

Question
Principles of BDD (check box)
Answer
  • a. Enough is enough
  • b. Deliver stakeholder value
  • c. It’s all behavior

Question 16

Question
Exploratory testing based on
Answer
  • test character containing test objectiveand carried out with in time boxes
  • useful when few or inadequate specification
  • serves time pressures.

Question 17

Question
It is important that when a defect is raised, it is generated through test lab.
Answer
  • True
  • False

Question 18

Question
Defect leakage is because of ----(check box)
Answer
  • a. Missed Requirement
  • b. Test Coverage Inefficiency
  • c. Tester’s Inefficiency

Question 19

Question
What is defect leakage?
Answer
  • Defects which have been missed in one stage, ButIdentifying the subsequent stages.
  • none

Question 20

Question
All types of templates are available in c2.0
Answer
  • True
  • False

Question 21

Question
Process types of templates are available in c2.0.
Answer
  • True
  • False

Question 22

Question
It is not needed to exclude a project from PHS score.(Check box)
Answer
  • a. Closing a WMP
  • b. Closing a project
  • c. Set IE factor
  • d. None

Question 23

Question
Which projects are ported to c2.0 from ESA?
Answer
  • a. Proposal
  • b. Bench
  • c. External
  • d. Administrative

Question 24

Question
QC has defect tab for defect management
Answer
  • True
  • False

Question 25

Question
In defect tab what we can done….(check box)
Answer
  • a. Defect reports
  • b. Create
  • c. Manage
  • d. Update

Question 26

Question
Initial stage of software life cycle is
Answer
  • Requirement Analysis.
  • none

Question 27

Question
Which is not the type of severity?
Answer
  • a. Severe
  • b. High
  • c. Medium
  • d. Low
  • e. Critical

Question 28

Question
Baseline RTM is exit criteria for test execution
Answer
  • True
  • False

Question 29

Question
Exit criteria is used to
Answer
  • a. Determine when the test case is completed
  • b. Defines when the test case level is complete

Question 30

Question
Junit4 allows grouping of test cases
Answer
  • True
  • False

Question 31

Question
Documenting requirements is used to know the problems of the system.(
Answer
  • True
  • False

Question 32

Question
Cross browser compatibility testing can be automated
Answer
  • True
  • False

Question 33

Question
Filtering can be used for the data manipulation and data retrieval.
Answer
  • True
  • False

Question 34

Question
QC allows the following features.(check box)
Answer
  • a.Filter and cross filter records
  • b. Sort and group sort records
  • c. Alerts and follow up flags
  • d. Snapshot
  • e. All of the above

Question 35

Question
Dashboard benefits
Answer
  • a. Manage risk of mission-critical applications
  • b. All of the above

Question 36

Question
36. Shared files(definition)—
Answer
  • Enables sharing or re-using of existing set of entities in projexts across enterprise
  • none

Question 37

Question
A project metrics once closed can opened by reopening it
Answer
  • True
  • False

Question 38

Question
Gives 100% test coverage
Answer
  • a. Branch coverage
  • b. Statement coverage
  • c. RTM

Question 39

Question
What type of testing done by developers
Answer
  • a. Alpha
  • b. Beta

Question 40

Question
Which factors that depends on project
Answer
  • a. Severity
  • b. Release
  • c. Developer
  • d. All

Question 41

Question
What are the types of testing techniques(checkbox)
Answer
  • a. Dynamic
  • b. Static
  • c. Error guessing
  • d. Experience Based

Question 42

Question
------- testing is performed before the application is rolled out?
Answer
  • a. UAT
  • b. System

Question 43

Question
Pareto analysis is based on classical 80/20 rule.
Answer
  • True
  • False

Question 44

Question
Pareto analysis using the following tools.
Answer
  • a. Why –why analysis
  • b. Fishbone (or) cause & effect diagram

Question 45

Question
Pareto analysis is used to root cause analysis for potential identify the defects.
Answer
  • True
  • False

Question 46

Question
CAR is the combination of pareto analysis & root cause analysis
Answer
  • True
  • False

Question 47

Question
Testing forms are
Answer
  • a. Junit
  • b. TestNG
  • c. JTesting
  • d. a & b
  • e. all

Question 48

Question
Defect tracking is not a good suggestion for testing.
Answer
  • True
  • False

Question 49

Question
Metrics frequency can be selected by enabling
Answer
  • a. Enabling metrics
  • b. Enable testing metrics
  • c. Benchmarks

Question 50

Question
OLBM stands for……
Answer
  • a. Organizational level bench mark
  • b. Operational level bench mark

Question 51

Question
Types of review
Answer
  • a. Informal review
  • b. Walkthrough
  • c. Technical review
  • d. Inspection
  • e. All of the above.

Question 52

Question
Informal review(checkbox)
Answer
  • a. No formal process
  • b. May take the form of pair programming or a technical lead reviewing designs and code result may be documented
  • c. Varies in usefulness depending on the reviewers
  • d. Main purpose: inexpensive way to get some benefit

Question 53

Question
Database testing is
Answer
  • a. Checking tables
  • b. Writing queries
  • c. Procedures
  • d. All of the above

Question 54

Question
Non functional requirements
Answer
  • a. Stress testing requirement
  • b. Portability
  • c. Performance
  • d. All of the above

Question 55

Question
Tool used to identify the source code, physical application that is causing the bottle neck.
Answer
  • a. Silk performer
  • b. Rational performance tester
  • c. Qtest

Question 56

Question
Goal analysis is not identity the in completed , inconsistency requirement.
Answer
  • True
  • False

Question 57

Question
Tool is used to identity whether all the functional specifications are met.
Answer
  • a. QTP
  • b. RTM
  • c. DTM
  • d. Load Runner

Question 58

Question
Testing metrics are enabled --------hrs
Answer
  • a. 24
  • b. 36
  • c. 48

Question 59

Question
Cannot generate various defect reports from QC defect tab
Answer
  • True
  • False

Question 60

Question
When u open a project in QC it open & display module in which v r last working
Answer
  • True
  • False
Show full summary Hide full summary

Similar

Excel and Macros
rabi kr shaw
THE CASES - GERMAN
Holly Miles
Cory & Manuel
cory.jones2010
The First, Second, Third and Fourth Crusades
adam.melling
USA and Vietnam (1964 - 1975) Part 2
Lewis Appleton-Jones
A-level Maths: Key Differention Formulae
humayun.rana
GCSE REVISION TIMETABLE
megangeorgia03
“The knower’s perspective is essential in the pursuit of knowledge.” To what extent do you agree with this statement?
Lucia Rocha Mejia
Biology - B2 - AQA - GCSE - Exam Style Questions
Josh Anderson
INCONSISTENCIES IN JAY'S STORY
Loren Ellis
Macbeth Quotes/Themes
Michael LEwis