SAB4#43 Scope Levels
- Control Account
- Work
Package 1
- Activity
1
- Activity
2
- Work
Package 2
- Activity
3
- Activity
4
- A distinct, scheduled
portion of work performed
during the course of a
project
- The work defined at the
lowest level of the WBS for
which cost and durtion can
be estimated and managed
- A management control point
where is possible the analysis of
work performance data regarding
costs, schedule and scope.
- Deliverable