Systems Development Life Cycle
- Key Terms:
- Concepts
- a. Identify/Understand Consequences of
Software (Systems) Success or Failure
- 1. Increase or
Decrease
Revenues,
2.Repair or
damage brand
reputation,
3.Prevent or
incur liabilities,
4. Increase or
decrease
productivity
- b. Know the phases of the SDLC
- SDLC Software Systems Development Life Cycle
Anmerkungen:
- A process used by software industry to design, develop and test high quality softwares.
- 1. Planning Phase
Anmerkungen:
- What approach should I take?
What are my goals?
First and most critical phase
- Understand the high-level differences among software development methodologies
- Waterfall Methodology
Anmerkungen:
- In a waterfall model, each phase must be completed before the next phase can begin and there is no overlapping in the phases
CONS:
1. Does not allow for much reflection or revision.
-Once an application is in the testing stage, it is very difficult to go back and change something that was not well-documented or thought upon in the concept stage.
- e. Agile principles
- Agile Methodology
Anmerkungen:
- Iterative development: consists of a series of tiny projects
Early continuous delivery of useful software components developed by an iterative process with a design point that uses the bare minimum reqs.
- FORMS OF THIS METHODOLOGY
- Rapid Application Development (RAD) Methodology
Anmerkungen:
- Fundamentals of RAD:
1. Focus initially on creating a prototype that looks and acts like the desired system
-Prototype is an essential part of the analysis phase when using rad
2. Actively involve system users in the analysis, design, and development phases
3. Accelerate collecting the business requirements through an interactive and iterative construction approach
- Extreme Programming Methodology (XP)
Anmerkungen:
- Breaks a project into tiny phases and developers cannot continue on to the next phase until the first phase is complete.
The faster the feedback the better the results
Like a puzzle
4 parts.
(1) planning
(2) designing-no functionality until it is needed,
(3) Coding
(4) Testing-tests are written before the code
BENEFIT:
-Narrows gap between developers and users
---->Saves time and clarifies needed and unneeded reqs
- SCRUM Methodology
Anmerkungen:
- Small teams to produce small pieces of deliverable software using sprints, 30-day intervals, to achieve an appointed goal
Standup meetings
- 2. Analysis Phase
Anmerkungen:
- 1. Analyze end-user business requirements-requests to be successful
2. Refine project goals into defined functions and operations of the intended system. Essential to getting a good start-So spend as much time, energy, and resources as necessary to perform a detailed, accurate analysis.
What must the system do to meet the objectives?
-Sign off-
- 3. Design Phase
Anmerkungen:
- 1. Describe the desired features and operation of system
- 4. Development (Construction) Phase
Anmerkungen:
- Takes all the detailed docs of the design phase and transforms them into the actual system.
Project has come from preliminary designs to the actual physical implementation
- 5. Testing Phase
Anmerkungen:
- You want to make sure that the system meets all the business reqs from analysis phase
And
Test in a special testing environment
- 6. Implementation Phase
Anmerkungen:
- Direct Conversion
- Parallel Conversion
- Phased Conversion
- Pilot Conversion
- 7. Maintenance
Anmerkungen:
- Maintain so that it continues to meet business goals
Continues for life
- Understand benchmarks for systems success
- f. Project Management Applied to SDLC
Anmerkungen:
- 1. Unclear or missing business reqs-cost to fix an error grows exponentially the later the error is found in the SDLC
2. Skipping SDLC phases
3. Failure to manage project scope and project plan
4. Changing technology
- i. Project Management Issues
- i. Choose strategic projects
- ii. Set the project scope
- iii. Manage resources and maintain the project plan
- iv. Change Management
- v. Risk Assessment, Risk Management, Risk Mitigation
- Understand the various types of feasibility
- Technical Feasibility
- Economic Feasibility
- Legal Feasibility
- Operational Feasibility
- Scheduling Feasibility
- Understand the key Implementation tasks and strategies
- i. Train users
- ii. Convert
- iii. Benefits and Risks of conversion of different strategies
- iv. Acceptance testing