Installation of ICT Systems
- CHANGEOVER METHODS
- Direct
- Where the firm stop using the old system and move to the new system straight away
- If the new system fails there is huge risk
- Large loss of data
- No old system to fall back on
- Requires fewer resources
- Parallel
- Minimises the risk of installing a new ICT system
- The old system is ran alongside the new system
- Until all people involved are happy with the new system working correctly
- Expensive
- twice the work being done
- Phased
- New system is installed unit by unit
- Allows any problems with the unit installed to be sorted before the next unit is installed
- Only suitable for systems which have various units
- Pilot
- Ideal for large organisation that have various locations
- Suitable where the new system can be used by one branch then transferred to another
- Implementation is on a smaller and manageable scale
- Takes longer to implement the system at all branches
- HARDWARE INSTALLATION & TESTING
- Wiring networks
- Testing hardware
- SOFTWARE INSTALLATION AND TESTING
- Installing software on servers
- Configuring systems
- Adding data
- Testing functionality
- DOCUMENTATION
- User documentation
- Technical documentation
- RESOURCES
- Installation teams
- Training