Zusammenfassung der Ressource
Performance 10
- Power Saving Program
- Decrease the
Auxiliary Power
- Full Load
- Partial Load
- Making BTG Operator a Key
Player for Efficiency
Improvement
- Condenser
pressure
- Reheat
temperature
- Hot well
temperature
- Reheat
spray flow
- Exit Gas
Temperature
- Incomplete
Combustion
- Throttle
pressure
- Super heat
temperature
- Feed water
temperature
- Super heat
spray flow
- Station
service power
- Excess oxygen
- Decrease the Loses
- Mechanical
- Leak Control
- Internal Leak (Passing)
- Category 1
- Boiler (i.e., superheater header
drains, reheat header drains, etc.)
- Turbine cycle drains (i.e., stop valve above
and below seat drains, turbine loop line
drains, trap on extraction piping, etc.)
- Category 2
- High pressure feedwater heater drains, Low
pressure feedwater heater drains, Boiler
feedwater pump minimum flow recirculation
valves, Attemperation valves, etc.
- External Leak
- Category 3
- include all steam
trap in the plant
- Category 4
- include all safety valves
(steam or water)
- Electrical
- Monthly report for all photo cell
- Controlling the electrical power of Offices Lighting,
controlling the HVAC temperature in night and holidays
- Check the losses through transformer
by Losses Test
- Controlling the Startup & Shutdown
Time
- Cold Startup
- Worm Startup
- Hot Startup
- Very Hot Startup
- Shutdown
- Control Boiler
BlowDown
- Chemical Injection
Optimization
- Efficiency
Measurements
- Performance
Test
- Cycle
Circulation
Test