Zusammenfassung der Ressource
GCSE Geo- rivers
- Hyrographys
- vocab
- discharge: the colume of
water pasing a given point
in a river at any moment
in time
- lag time: the time it
takes for rainfall to get
to the river
- falling limb:water is still
reaching the river but in
decreasing amounts
- rising limb:the
normal flow of the
river starts to rise
- Flashy responce: river that
responds quicky to rain to
is has a high peak and
short lag time
- Built up area
- Higher Discharge
- Due to: artificial
surfaces - tarmac and
concrete= less surface
run off
- Short Lag time
- Due to: little interception by vegetation etc
- little infiltration (small amounts of vegetation )
- Flashy Responce
- faster response = higher peak discharge
- Forested Area
- long lag time
- low discharge
- - Infiltration high. -Ground
water flow slower than
surface run off. -Water flows
slower over vegetetation
- subdued responce
- slower response = lower peak discharge
- CASE STUDIES
- FLOODING
- Bangledesh
- CockerMouth
- Hard/Soft Engeneering
- HARD
- Dams
- disadvantages
- resettlement
- very expensive
- Habitats effected
- Advantages
- turbines can be built into
the dam to generate
hydroelectric power
- steady water release allows irrigation to land
- the resevoir can be used
for recreational water sports
- Straightening and
deepening of rivers
- disadvantages
- Flooding may happen downstream
because flood water is carried there faster
- more erosion occurs downstream
- advantages
- it time less time to nivagate
the river because the
channel is shorter
- we can harness the
extra power to make
electricity
- Levees
- advantages
- they allow flood plain
to be built on
- the river can hold mor water
- disadvantages
- they are quite expensive
- if breached = risk of severe flooding
- Others
- Diversion spillways
- Flood walls
- Storage areas
- SOFT
- -Forecasts and Warnings
-Preperation
- advantages
- enables time to evacuate =
lives + possessions saved
- sustainable + cheap
- disadvantages
- cannot always predict
floods/ danger
- people may ignore
warnings
- Floodplain zoning etc
- advangages
- there are no new buildings/
roads etc to be damaged so
impact of flooding reduced
- lives/ property saved
- disadvantages
- its restrics development ( big
problem when there is a
shortage on housing
- it cant be used in areas
that are already
urbanized
- Afforestation + Reforestation
- disadvantages
- takes time
- large areas required to be effective/
land that could have been used for
economic activity
- advantages
- very effective long term
- creates wildlife habitats
- vegetation protects against soil erosion