Frage 1

Frage
1. Liquid penetrant testing is based on the principle of:
Antworten
  • (a) Polarized sound waves in a liquid
  • (b) Magnetic domains
  • (c) Absorption of X rays
  • (d) Capillary action

Frage 2

Frage
2. When a small diameter tube is placed in a glass of water, water rises in the tube to a level above the adjacent surface. This is called:
Antworten
  • (a) Viscosity
  • (b) Capillary action
  • (c) Surface tension
  • (d) Barometric testing

Frage 3

Frage
3. How is the size of a liquid penetrant indication usually related to the discontinuity it represents:
Antworten
  • (a) Larger than
  • (b) Smaller than
  • (c) Equal to
  • (d) Not related to

Frage 4

Frage
4. A penetrant that is self-emulsifying is called:
Antworten
  • (a) Solvent removable
  • (b) Water washable
  • (c) Post-emulsified
  • (d) Dual sensitivity method

Frage 5

Frage
5. A penetrant process which employs an emulsifier as a separate step in the penetrant removal process is called:
Antworten
  • (a) Solvent removable
  • (b) Water washable
  • (c) Post-emulsified
  • (d) Dual sensitivity method

Frage 6

Frage
6. A penetrant process in which excess penetrant is removed with an organic solvent is called:
Antworten
  • (a) Solvent removable
  • (b) Water washable
  • (c) Post-emulsified
  • (d) Dual method

Frage 7

Frage
7. Which of the following statements accurately describes the capabilities of liquid penetrant testing?
Antworten
  • (a) Liquid penetrant testing is useful for locating subsurface discontinuities in a test piece
  • (b) Liquid penetrant testing is useful for locating discontinuities in porous materials
  • (c) Liquid penetrant testing is useful for locating discontinuities which are open to the surface in non-porous materials
  • (d) none of the above

Frage 8

Frage
8. Which of the following discontinuity types could typically be found with a liquid penetrant test?
Antworten
  • (a) Internal slag in a weld
  • (b) Internal slag in a casting
  • (c) Sensitization in austenitic stainless steel
  • (d) Fatigue cracks

Frage 9

Frage
9. Which of the following chemical elements are normally held to a minimum in liquid penetrant materials, when testing stainless steel and titanium?
Antworten
  • (a) Hydrogen
  • (b) Chlorine
  • (c) Carbon
  • (d) Oil

Frage 10

Frage
10. Which of the following chemical elements are normally held to a minimum in liquid penetrant materials when testing nickel based alloys?
Antworten
  • (a) Sulphur
  • (b) Oxygen
  • (c) Carbon
  • (d) Nitrogen

Frage 11

Frage
11. Which of the following is the most desirable method of pre-cleaning a test piece prior to penetrant testing?
Antworten
  • (a) Sand blasting
  • (b) Vapour degreasing
  • (c) Emery cloth
  • (d) Wire brushing

Frage 12

Frage
12. Which of the following pre-cleaning processes is not recommended?
Antworten
  • (a) Detergent cleaning
  • (b) Vapour degreasing
  • (c) Shot blasting
  • (d) Ultrasonic cleaning

Frage 13

Frage
13. A wire brush should be used for pre-cleaning:
Antworten
  • (a) When grease and oil must be removed
  • (b) Only as a last resort
  • (c) When rust is to be removed
  • (d) When grinding burrs must be removed

Frage 14

Frage
14. A hydrometer is used to measure:
Antworten
  • (a) Penetrant viscosity
  • (b) Specific gravity of water based wet developers
  • (c) Penetrant specific gravity
  • (d) Cleaner specific gravity

Frage 15

Frage
15. Visible, solvent removable penetrants are most advantageous for:
Antworten
  • (a) Inspecting parts with rough surfaces
  • (b) Inspecting batches of small parts
  • (c) Inspecting parts at remote locations
  • (d) Inspecting parts with porous surfaces

Frage 16

Frage
16. For adequate test results, the black light used in fluorescent penetrant examination should provide what minimum black light intensity at the test surface?
Antworten
  • (a) 100 foot candles per square centimetre
  • (b) 1000 microwatts per square centimetre
  • (c) 800 foot candles
  • (d) 35 microwatts per square centimetre

Frage 17

Frage
17. What minimum warm-up time is required for acceptable performance of a mercury Vapour arc black light?
Antworten
  • (a) None
  • (b) 2 minutes
  • (c) 5 minutes
  • (d) 10 minutes

Frage 18

Frage
18. Which of the following penetrants contains an emulsifying agent?
Antworten
  • (a) Solvent removable
  • (b) Water washable
  • (c) Post emulsifiable
  • (d) Fluorescent

Frage 19

Frage
19. Which of the following penetrants must be treated with an emulsifier prior to water removal?
Antworten
  • (a) Solvent removable
  • (b) Water washable
  • (c) Post emulsifiable
  • (d) Fluorescent

Frage 20

Frage
20. What is the function of an emulsifier?
Antworten
  • (a) To remove the excess penetrant
  • (b) To develop indications with a post emulsifiable penetrant system
  • (c) To assist penetration with a post emulsifiable penetrant system
  • (d) To make a post emulsifiable penetrant water washable

Frage 21

Frage
21. An oil based emulsifier is called:
Antworten
  • (a) Hydrophilic
  • (b) Hydrophobic
  • (c) Lipophilic
  • (d) Fluoroscopic

Frage 22

Frage
22. A water based emulsifier is called:
Antworten
  • (a) Hydrophilic
  • (b) Hydrophobic
  • (c) Lipophilic
  • (d) Fluoroscopic

Frage 23

Frage
23. Methylene chloride, isopropyl, alcohol, naptha and mineral spirits are examples of:
Antworten
  • (a) Emulsifiers
  • (b) Developers
  • (c) Solvent removers
  • (d) None of the above

Frage 24

Frage
24. What type of solvent removers may be used with a solvent removable penetrant?
Antworten
  • (a) Any organic solvent
  • (b) Only the cleaner recommended by the manufacturer of the penetrant
  • (c) Any alcohol based solvents
  • (d) Only chlorinated hydrocarbons

Frage 25

Frage
25. Which of the following is a prerequisite for a penetrant test?
Antworten
  • (a) Developer must be applied in a thin, even coat
  • (b) Any surface coatings or soils must be completely removed
  • (c) All traces of penetrant materials should be removed after testing is complete
  • (d) The test object must be non-magnetic

Frage 26

Frage
26. Which of the following types of pre-cleaning processes may be used for liquid penetrant testing?
Antworten
  • (a) Wire brushing only
  • (b) Detergent and water only
  • (c) Vapour degreasing only
  • (d) Any process that leaves the part clean and dry, does not harm the part and is compatible with the penetrant materials

Frage 27

Frage
27. What is the likely result of incomplete removal of all excess penetrant from the test piece surface?
Antworten
  • (a) Formation of false indications
  • (b) Formation of relevant indications
  • (c) Exaggeration of the size of relevant indications
  • (d) None of the above

Frage 28

Frage
28. What is the preferred pre-cleaning process for removal of oil and grease :
Antworten
  • (a) Steam cleaning with a added acid
  • (b) Vapour degreasing
  • (c) Steam cleaning
  • (d) Ultrasonic cleaning

Frage 29

Frage
29. Which pre-cleaning method may be used with either a solvent or a detergent solution?
Antworten
  • (a) Ultrasonic cleaning
  • (b) Steam cleaning
  • (c) Detergent wash
  • (d) Vapour degreasing

Frage 30

Frage
30. What is the danger associated with using a wire brush during pre-cleaning?
Antworten
  • (a) Bristles from the wire brush may cause false indications
  • (b) Contaminants from the wire brush may cause delayed hydrogen cracking of high carbon steels
  • (c) The wire brush may not adequately remove organic soils
  • (d) The wire brush may close or smear metal over

Frage 31

Frage
31. What is the preferred method of removing paint prior to performing a penetrant testing?
Antworten
  • (a) Sand blast
  • (b) Chemical removers
  • (c) Power wire brush
  • (d) Shot blast

Frage 32

Frage
32. What additional surface preparation or cleaning must be performed on a machined or ground aluminium casting prior to penetrant testing?
Antworten
  • (a) Vapour degreasing
  • (b) Etching
  • (c) Detergent wash
  • (d) Nothing

Frage 33

Frage
33. Acceptable methods of penetrant application are:
Antworten
  • (a) Spraying
  • (b) Dipping
  • (c) Brushing
  • (d) All of the above

Frage 34

Frage
34. The time period during which penetrant remains on the surface of the test piece is called:
Antworten
  • (a) Dwell time
  • (b) Soaking time
  • (c) Fixing time
  • (d) Development time

Frage 35

Frage
35. Excess penetrant removal is a two step process with which of the following penetrant methods?
Antworten
  • (a) Water washable
  • (b) Post emulsifiable
  • (c) Solvent removable
  • (d) Liquid oxygen applications

Frage 36

Frage
36. A developer aids penetrant bleed out because of:
Antworten
  • (a) Adequate removal of the excess penetrant
  • (b) Providing a contrasting background for visible dye indications
  • (c) Capillary action
  • (d) Proper emulsifier action

Frage 37

Frage
37. In the solvent removable penetrant process, excess penetrant is removed with:
Antworten
  • (a) A water spray
  • (b) A hydrophilic scrubber
  • (c) A solvent spray
  • (d) Clean, lint free towels slightly moistened with solvent

Frage 38

Frage
38. Water based wet developer is applied:
Antworten
  • (a) Immediately before removal of excess penetrant
  • (b) Immediately after removal of excess penetrant
  • (c) After a drying period following removal of excess penetrant
  • (d) For maximum sensitivity results

Frage 39

Frage
39. Non-aqueous wet developer is applied:
Antworten
  • (a) Immediately before removal of excess penetrant
  • (b) Immediately after removal of excess penetrant
  • (c) After the excess penetrant is removed and part surface is dried
  • (d) For maximum sensitivity results

Frage 40

Frage
40. Dry developer is applied:
Antworten
  • (a) Immediately before removal of excess penetrant
  • (b) Immediately after removal of excess penetrant
  • (c) After drying of the part
  • (d) For maximum sensitivity results

Frage 41

Frage
41. Typical ranges of emulsifier dwell times are:
Antworten
  • (a) 5 to 10 minutes
  • (b) 30 seconds to 1 minute
  • (c) 1 to 3 minutes
  • (d) 5 to 10 minutes

Frage 42

Frage
42. Actual emulsification times are determined by:
Antworten
  • (a) Experiment, during technique qualification
  • (b) Manufacturer's recommendations
  • (c) Code requirements
  • (d) None of the above

Frage 43

Frage
43. The colour of fluorescent penetrant under the presence of a UV light is:
Antworten
  • (a) Yellow-green
  • (b) Red
  • (c) Blue
  • (d) Green

Frage 44

Frage
44. What action is necessary if the penetrant is inadvertently allowed to dry on the test piece?
Antworten
  • (a) Repeat the test, beginning with the pre-cleaning operation
  • (b) Re-wet the penetrant, begin dwell time again and continue
  • (c) Clean the penetrant off the surface and develop normally
  • (d) Clean the penetrant off the surface, wait 5 minutes and develop normally

Frage 45

Frage
45. What maximum water rinse pressure is considered safe for removal of excess penetrant in the water washable penetrant process?
Antworten
  • (a) As low a pressure as possible, 50 PSI maximum
  • (b) to 200 PSI
  • (c) PSI maximum
  • (d) to 500 PSI

Frage 46

Frage
46. During the water rinse step of the water washable penetrant process, what is the desired angle of the spray to the surface?
Antworten
  • (a) Normal
  • (b) 30 degrees
  • (c) 45 degrees
  • (d) 75 degrees

Frage 47

Frage
47. Which type of emulsifier is designed to be used as a ‘scrubber’?
Antworten
  • (a) Hydrophilic
  • (b) Hydrophobic
  • (c) Lipophilic
  • (d) Fluoroscopic

Frage 48

Frage
48. Post cleaning is especially important when:
Antworten
  • (a) Post emulsified penetrants are used
  • (b) Phosphate containing detergents are used
  • (c) Chlorinated hydrocarbons are used
  • (d) The test object will be used in a liquid oxygen environment

Frage 49

Frage
49. When using a hydrophilic emulsifier, the amount of penetrant removed is most affected by:
Antworten
  • (a) Solution strength and time of spray
  • (b) Penetrant dwell time
  • (c) Emulsifier dwell time
  • (d) Adequacy of pre-clean

Frage 50

Frage
50. If a mercury vapour arc black light is inadvertently turned off, how soon may it be restarted?
Antworten
  • (a) Immediately
  • (b) 5 minutes
  • (c) 10 minutes
  • (d) 15 minutes
Zusammenfassung anzeigen Zusammenfassung ausblenden

ähnlicher Inhalt

Englisch Vokabeln (allgemein)
lucas.kok
Bourdieu
Melanie Najm
Stochastik
moodle5
Anatomie Grundlagen
m m
Projektmanagement
zok42.com
Abiturthemen 2016 in Deutsch für alle Bundesländer
Laura Overhoff
ME2 Theorie
Matin Shah
Kurvendiskussion bei gebrochen rationalen Funktionen
berit.krondorf
EC Klinische Psychologie
Sandra S.
Grundzüge Soziologischer Theorien - Rudolf Richter 2017 - Version 2
Markus Gio
Vetie Chirugie 2015
Svea Schill