Frage 1
Frage
You can only answer yes/no to open questions as part of a questionnaire.
Frage 2
Frage
The design stage of the systems life cycle comes before installation.
Frage 3
Frage
"Throw away" prototyping is a type of prototype.
Frage 4
Frage
A problem associated with RAD is that it makes use of a number of techniques to encourage good time management and efficient software development.
Frage 5
Frage
A problem with prototyping is that you cannot identify problems early on in the process.
Frage 6
Frage
The people responsible for testing the system are known as the beta testers.
Frage 7
Frage
Extreme data is data that is way over the limits of the range.
Frage 8
Frage
Erroneous data is data that should fail when being tested.
Frage 9
Frage
A requirements specification is carried out by the system analyst
Frage 10
Frage
A project manager is responsible for implementing the system
Frage 11
Frage
A project manager is responsible for financing and managing the budget.
Frage 12
Frage
Systems analysts use questionnaires, interviews and other methods to find out about the current system.
Frage 13
Frage
One of the programmers responsibility is to write any technical documentation.
Frage 14
Frage
A disadvantage of a gantt chart is that it doesnt show the length of the time the task takes to complete.
Frage 15
Frage
An advantage of CPA is that it reduces waste
Frage 16
Frage
External entities in a data flow diagram are represented in oval shapes