Zusammenfassung der Ressource
Frage 1
Frage
Suggested BIM uses for tender phase (for contractor) are:
Frage 2
Frage
Suggested BIM uses for Pre-Construction phase (for contractor) are:
Frage 3
Frage
Suggested BIM uses for Construction phase (for contractor) are:
Antworten
-
Construction Coordination
-
Modelling and Shop Drawings
-
Sequence Complex Construction
-
Setting Out and Verification on Site
-
Prefabrication
Proposal
-
As-Built models
-
Model for Facility Management
Frage 4
Frage
The contractor use site model to
Antworten
-
Model the site topography
-
Add hoardings along the boundary
with site access (gates)
-
Plan and model construction access and
pedestrian access inside the site
-
Model the site offices, storage areas and utilities
-
Plan the vehicle movements and mobile crane movements
-
Plan locations of Tower Cranes
Frage 5
Frage
Once the site plan model is developed, the main contractor could communicate the site plan to his sub-contractors/workers using:
3D model walk-through
4D simulations or animation videos