An architect's preliminary estimate of construction cost would consider all of the following EXCEPT: I. labor and materials supplied by the owner. II. cooling towers. III. land acquisition costs. IV. the architect's fee. V. metal curtain wall systems
Antworten
  • A. I only
  • B. I and IV
  • C. None, everything would be considred
  • D. III and IV

Frage 2

Frage
An architect who prepares a preliminary estimate of construction cost according to the subsystems method
Antworten
  • A. considers one set of subsystems for concrete buildings and a different set for steel buildings.
  • B. can easily analyse the cost of alternative exterior wall systems.
  • C. would most likely use this method during the schematic design phase.
  • D. would be performing an additional service under the AIA Agreement between Owner and Architect.
Zusammenfassung anzeigen Zusammenfassung ausblenden

ähnlicher Inhalt

Logarithmus
Kaja-Lotta
PuKW STEP 6 (mögliche Prüfungsfragen/Prüfungsvorbereitung)
frau planlos
Deutsch Partizip Perfekt - unregelmäßige Verben
Claus Lenz
Neurobiologie Übersicht
Laura Overhoff
Anfänge der Weimarer Republik
Milena Märker
Österreichische Geschichte ll Mesner (ÖG 2)
Selma Tahirovic
Vetie Radiologie Übungsfragen
Péroline de Gail
Vetie - Innere Medzin 2018
Fioras Hu
Vetie Chirurgie 2018
Johanna Müller
Repro 2014 Vetie
Anne Käfer
Vetie Repro 2020
Franziska Piepho