Zusammenfassung der Ressource
Frage 1
Frage
All Material Indirect Request must be validated by:
Frage 2
Frage
Some of the following information is required in the Worksheet Indirect Material Creation template:
Antworten
-
Description, Material Usage, Material Group
-
Purchasing Group, Plant name, PRODCOM no.
-
Mat. CFOP category, Control Code, Profit Center
-
Valuation Class, Valuation Category, Currency
Frage 3
Frage
T-Code for Masive extension using QTP is MM02
Frage 4
Frage
Options selected in the image attached for create a new material are correct:
Frage 5
Frage
Views that do not need to be selected are Basic Data 2, General Plant 3 and Additional Data 1
Frage 6
Frage
Languages used for MM creation are:
Antworten
-
English, French, Spanish
-
Portuguese, French, English
-
Spanish and English
-
Spanish, English and Portuguese
Frage 7
Frage
If you need to purchase a Router, Z001 must be entered in the Serial no. Profile, at Plant data / stor. 2
Frage 8
Frage
For attaching the Template form in the MM, you can user T-code MM02
Frage 9
Frage
Materials must be extended to all Brazil plants, while only one plant requested the creation.
Frage 10
Frage
A Material Extension by using Quicktest Tool requires:
Antworten
-
Use a separate laptop
-
Synchronize with Kofax Markview
-
Close the session and open a new one in TR2
-
Synchronize with the first SAP session
Frage 11
Frage
For checking that MM has been extended to all required plants, go to T-Code MM03
Frage 12
Frage
A MM extension can be made manually or by using QTP
Frage 13
Frage
Additional Data 3 informs the Material Valuation Class
Frage 14
Frage
Base Unit of measure will be EA for all materials
Frage 15
Frage
If a template contains incomplete information, you:
Antworten
-
Complete it and create the material
-
Reject the request and replay back to requestor in order to complete it.
-
Search for a similar material, complete and attach the template to MM.
-
Request to user the pendant information in order to complete the MM creation