Small gate

Beschreibung

Karteikarten am Small gate, erstellt von Jake U am 20/09/2015.
Jake U
Karteikarten von Jake U, aktualisiert more than 1 year ago
Jake U
Erstellt von Jake U vor fast 9 Jahre
9
0

Zusammenfassung der Ressource

Frage Antworten
Small gate position (word for word) Step 1 Safely dismount the apparatus wearing all PPE and radio
Step 2 If riding on a new Smeal Pumper, ensure coffin doors are electrically opened - allows for free travel of hose when the vehicle in in motion, apparatus will need to have park brake engaged
Step 3 Retrieve hydrant kit from the driver rear compartment of apparatus
Step 4 Pace hydrant kit near the hydrant in a practical location for big gate
Step 5 Help big gate with the supply line and wait for the ready signal
Step 6 Return to your position in the apparatus and relay the ready signal to the driver and officer
Step 7 At the scene. Safely dismount the unit and uncouple the supply line at the nearest joint
Step 8 Attach the supply line to the appropriate apparatus at the scene
Step 9 If located at the intake connection, open intake drain valve
Step 10 Communicate to the driver of the apparatus that the line is ready
Step 11 Report to your officer for reassignment
Zusammenfassung anzeigen Zusammenfassung ausblenden

ähnlicher Inhalt

Big Gate
Jake U
Rank Structure Policies
Jake U
Water supply and hydraulics Part 1
Jake U
Water supply and hydraulics part 2
Jake U
Fire behavior (50 cards)
Jake U
Lernplan
barbarabfm
Juraexamen Karteikarten - Strafrecht
anna.grillborzer0656
B, Kapitel 2, Arbeits- und Sozialordnung
Stefan Kurtenbach
Geflügel Allerlei
Anne Käfer
Vetie-Fleisch2015
Ju Pi
Vetie - Spezielle Pathologie 2021
Svea Schill