Software life cycle

Description

Mind Map on Software life cycle, created by Hengelbert Rodas Chala on 21/08/2018.
Hengelbert Rodas Chala
Mind Map by Hengelbert Rodas Chala, updated more than 1 year ago
Hengelbert Rodas Chala
Created by Hengelbert Rodas Chala almost 6 years ago
7
0

Resource summary

Software life cycle
  1. Waterfall or linear-sequential model
    1. A series of steps that must be completed in a linear, sequential order.
      1. Easy to use.
        1. Its usefulness is limited
          1. Software model
            1. Analyzes the needs of the end users of the software
              1. Decomposes and organizes the system, algorithms
                1. the source code is implemented
                  1. It is checked to see if it is working properly
              2. V-Shaped
                1. The V-model focuses on activities and correction.
                  1. The relationship between the development stages and the different types of tests facilitates the troubleshooting.
                    1. The tests can be expensive and sometimes not effective enough.
                      1. Software model
                        1. requirements gathering, accept test
                          1. Funtional specifications, integration test
                            1. HIgh level desing, system test
                              1. Low level desing, unit test
                          2. Incremental
                            1. Tasks grouped in small repetitive steps.
                              1. The model is less likely to fail.
                                1. Requires a client involved throughout the course of the project.
                                  1. Software model
                                    1. Requirement, design, implementation and testing phases are completed for each iteration
                                2. Spiral
                                  1. The risk involved in software development is taken into account.
                                    1. Integrates development with maintenance.
                                      1. It's an expensive model.
                                        1. Software model
                                          1. Planing
                                            1. Evaluation
                                              1. Risk analisis
                                                1. Engineering
                                            Show full summary Hide full summary

                                            Similar

                                            C6 Flash cards
                                            Anna Hollywood
                                            Hitler and the Nazi Party (1919-23)
                                            Adam Collinge
                                            A-Level History: Nazi Germany
                                            cian.buckley+1
                                            USA and Vietnam (1964-1975) - Part 1
                                            Lewis Appleton-Jones
                                            AQA Biology 8.1 structure of DNA
                                            Charlotte Hewson
                                            GCSE AQA Biology 1 Nerves & Hormones
                                            Lilac Potato
                                            F211- Module 1 Cells, exchange and transport
                                            eilish.waite
                                            GRE Verbal Reasoning Vocabulary Flashcards 1
                                            Sarah Egan
                                            A-LEVEL ENGLISH LANGUAGE : Key Theorists
                                            Eleanor H
                                            Core 1.12 Timbers blank test
                                            T Andrews