SAB9#48_Validate_scope

Annotations:

  •  The Validate Scope process actually involves frequent, planned meetings with the customer or sponsor to gain formal acceptance of deliverables during project monitoring and controlling.
  1. Requirements documentation
    1. Traceability matrix
      1. Deliverables

        Annotations:

        • These are verified deliverables, which means they’ve been through Perform Quality Control.
        1. Work performance data

          Annotations:

          • As per the PMBOK Guide, the work performance data is “the raw observations and measurements identified during activities performed to carry out the project work; e.g. actual cost, actual duration, and percent of work physically completed.”
          1. Group decisionmaking techniques
            1. Once the stakeholders have inspected the deliverables, they’ll need to decide whether or not the deliverables can be accepted
              1. This is where the stakeholders actually look closely at the what the team did and make sure that every single piece of work was completed.
              2. Verified deliverables
                1. If the team did the work right, then the stakeholders will formally accept the deliverables (which means they do it in writing).
                2. Change requests
                  1. Project document updates
                    1. Work performance information

                      Annotations:

                      • As per the PMBOK Guide, the work performance information is “the performance data collected from various controlling processes, analyzed in context and integrated based on relationships across areas; e.g. status of deliverables, and forecasted estimates to complete, etc.”
                      1. Relationship between validate scope and control quality
                        Show full summary Hide full summary

                        Similar

                        Mapa Mental - Como Criar um Mapa Mental
                        miminoma
                        Biological Molecules Definitions
                        siobhan.quirk
                        Diffusion and osmosis
                        eimearkelly3
                        The Geography Of Earthquakes
                        eimearkelly3
                        AS Pure Core 1 Maths (AQA)
                        jamesmikecampbell
                        AS Psychology - Research Methods
                        kirstygribbin
                        Macbeth - Charcters
                        a.agagon
                        The Cold War Quiz
                        Niat Habtemariam
                        Organic Chemistry
                        Megan Tarbuck
                        General questions on photosynthesis
                        Fatima K
                        OP doplnovaci otazky II.
                        Helen Phamova