RIBA PLAN 2013 consultation

Description

Mind Map on RIBA PLAN 2013 consultation, created by alison_patey0437 on 08/05/2013.
alison_patey0437
Mind Map by alison_patey0437, updated more than 1 year ago
alison_patey0437
Created by alison_patey0437 over 11 years ago
88
2

Resource summary

RIBA PLAN 2013 consultation
  1. INTEGRATE CHANGES
    1. Sustainability
      1. BIM
        1. Building services design
          1. UK Gov construction stategy
          2. OLD RIBA STAGE
            1. A: Appraisal
              1. B: Design Brief
                1. C: Apraisal
                  1. D: Design Development
                    1. E: Technical Design
                      1. F1 & F2: Production information
                        1. G: Tender Documentation
                          1. H: Tender Action
                            1. J: Mobilisation
                              1. K: Construction to PC
                                1. L: Post PC
            2. NEW RIBA STAGE
              1. 1: PREPARATION
                1. 2: CONCEPT DESIGN
                  1. 3: DEVELOPED DESIGN
                    1. 4: TECHNICAL DESIGN
                      1. 5: SPECIALIST DESIGN
                        1. 6: CONSTRUCTION (OFF + ONSITE)
                          1. 7: USE AND AFTERCARE
              2. PROPOSALS
                1. Abolish A - L stages and replace with 7 point schedule of works incorporating:
                  1. intellegent commissioning
                    1. soft landings
                      1. project outcomes
                        1. differing stages of planning
                          1. UK & international use
                            1. Private + public sector
                              1. Differing project sizes
                            2. KEY CHANGES
                              1. Work stages reduced from 11 to 7 & aligned with the CIC sch of services
                                1. Stages A & B have been merged into 1 intitial 'preparation stage'
                                  1. Stages F to L have been simplified and re-numbered
                                    1. Job specific flexibility replaces the single description of tasks used in the Plan of works 2007
                                      1. Planning is accounted for in the design process
                                        1. Sustainability and BIM have been incorporated with the introduction of BIM 'overlay' and 'Green Overlay'
                                        2. GREEN OVERLAY
                                          1. Provides a framework for the inclusion of sustainability in the apprisal, breifing, design and construction process.
                                            1. the overlay takes the existing plan as a starting point add guidance notes and highlights additional actions to promote the construction of sustainable buildings.
                                            Show full summary Hide full summary

                                            Similar

                                            Harry Potter Trivia Quiz
                                            Andrea Leyden
                                            BIOLOGY B1 5 AND 6
                                            x_clairey_x
                                            FCE Practice Quiz - B2
                                            Christine Sang
                                            English Poetry Key Words
                                            Oliviax
                                            ExamTime Quick Guide to Getting Started
                                            Andrea Leyden
                                            Health and Social Care
                                            Kelsey Phillips
                                            B7 Quiz - The Skeleton, Movement and Exercise
                                            Leah Firmstone
                                            The Circulatory System
                                            Johnny Hammer
                                            FV modules 1-4 infinitives- ENTER ENGLISH
                                            Pamela Dentler
                                            World War One
                                            Micheal Heffernan
                                            CCNA Security 210-260 IINS - Exam 3
                                            Mike M