RIBA PLAN 2013 consultation

Description

Mind Map on RIBA PLAN 2013 consultation, created by alison_patey0437 on 08/05/2013.
alison_patey0437
Mind Map by alison_patey0437, updated more than 1 year ago
alison_patey0437
Created by alison_patey0437 over 11 years ago
87
2

Resource summary

RIBA PLAN 2013 consultation
  1. INTEGRATE CHANGES
    1. Sustainability
      1. BIM
        1. Building services design
          1. UK Gov construction stategy
          2. OLD RIBA STAGE
            1. A: Appraisal
              1. B: Design Brief
                1. C: Apraisal
                  1. D: Design Development
                    1. E: Technical Design
                      1. F1 & F2: Production information
                        1. G: Tender Documentation
                          1. H: Tender Action
                            1. J: Mobilisation
                              1. K: Construction to PC
                                1. L: Post PC
            2. NEW RIBA STAGE
              1. 1: PREPARATION
                1. 2: CONCEPT DESIGN
                  1. 3: DEVELOPED DESIGN
                    1. 4: TECHNICAL DESIGN
                      1. 5: SPECIALIST DESIGN
                        1. 6: CONSTRUCTION (OFF + ONSITE)
                          1. 7: USE AND AFTERCARE
              2. PROPOSALS
                1. Abolish A - L stages and replace with 7 point schedule of works incorporating:
                  1. intellegent commissioning
                    1. soft landings
                      1. project outcomes
                        1. differing stages of planning
                          1. UK & international use
                            1. Private + public sector
                              1. Differing project sizes
                            2. KEY CHANGES
                              1. Work stages reduced from 11 to 7 & aligned with the CIC sch of services
                                1. Stages A & B have been merged into 1 intitial 'preparation stage'
                                  1. Stages F to L have been simplified and re-numbered
                                    1. Job specific flexibility replaces the single description of tasks used in the Plan of works 2007
                                      1. Planning is accounted for in the design process
                                        1. Sustainability and BIM have been incorporated with the introduction of BIM 'overlay' and 'Green Overlay'
                                        2. GREEN OVERLAY
                                          1. Provides a framework for the inclusion of sustainability in the apprisal, breifing, design and construction process.
                                            1. the overlay takes the existing plan as a starting point add guidance notes and highlights additional actions to promote the construction of sustainable buildings.
                                            Show full summary Hide full summary

                                            Similar

                                            Biology AQA 3.1.5 The Biological basis of Heart Disease
                                            evie.daines
                                            GoConqr Quick Guide to Getting Started
                                            Andrea Leyden
                                            Variation and evolution Quiz
                                            James Edwards22201
                                            Biology (B2)
                                            anjumn10
                                            Health and Social Care Flashcards
                                            Kelsey Phillips
                                            Whole Number Glossary L1
                                            Lee Holness
                                            Geometry Vocabulary
                                            patticlj
                                            Lesson Planning: 4 Organisational Tips for Teachers
                                            miminoma
                                            Continents & Oceans
                                            Thomas Yoachim
                                            The Circulatory System
                                            Johnny Hammer
                                            SFDC App Builder (76-100)
                                            Connie Woolard