Question 1
Question
Herzberg's Theory focuses on ...
Answer
-
hygiene factors and motivators
-
hygiene factors and esteem factors
-
motivators and safety factors
-
hygiene factors and social factors
Question 2
Question
Which of the following BEST describes a project management plan?
Question 3
Question
Which one of the following is NOT a conflict resoltion technique?
Answer
-
Withdrawing
-
Smoothing
-
Compromising
-
Advertising
Question 4
Question
The pareto principle states that ___________ percent of the problems are due to 20 percent of the root causes
Question 5
Question
Which of the following is NOT a task of the process 'Close Project or Phase'?
Question 6
Question
A conflict in a project team is ...
Answer
-
a problem, which reduces the ability to work
-
nothing important and will not reduce the ability to work
-
a situation that occurs at least once a day
-
a crisis, that could stop the work on the project
Question 7
Question
If earned value (EV) = 550, actual cost (AC) = 400, planned value (PV) = 350, what is the cost variance (CV)?
Question 8
Question
Which one of the following processes is NOT part of the Monitoring & Controlling Process Group?
Answer
-
Control Schedule
-
Control Procurements
-
Close Procurements
-
Control Costs
Question 9
Question
The project charter is created in which project management process group?
Answer
-
Planning
-
Executing
-
Closing
-
Initiating
Question 10
Question
What is the duration of a milestone?
Answer
-
Same length as the activity it represents
-
Shorter than the activity it represents
-
Shorter than the duration of the longest activity
-
There is no duration
Question 11
Question
Conflict resolution techniques that may be used on a project include confronting, smoothing, forcing and:
Answer
-
Directing
-
Organizing
-
Controlling
-
Withdrawing
Question 12
Question
When would a milestone chart be used instead of a bar chart?
Question 13
Question
If you make a prototype for a risky piece of equipment what type of risk response is this?
Answer
-
Accept
-
Mitigate
-
Avoid
-
Transfer
Question 14
Question
Which project management process group generally takes the MOST project time and resources?
Answer
-
Executing
-
Planning
-
Integration
-
Design
Question 15
Question
During which process group does the team measure and analyze the work being done on the project?
Question 16
Question
A project has three critical paths. Which of the following BEST describes how this affects the project?
Answer
-
It increases the project risk.
-
It makes it easier to manage.
-
It makes it more expensive.
-
It requires more people.
Question 17
Question
The difference between the cost baseline and the cost budget can be BEST described as:
Question 18
Question
Which of the following explains why quality is planned in and not inspected in?
Answer
-
It reduces quality and is less expensive.
-
It improves quality and is less expensive.
-
It reduces quality and is more expensive.
-
It improves quality and is more expensive.
Question 19
Question
Which of the following statements regarding the decision tree is correct?
Answer
-
You should not upgrade to the new software version because the EMV is higher than the other option.
-
You should not upgrade to the new software version because these are additional costs for the project
-
You should upgrade to the new version of the software because the EMV is 15.000,- and this is less than the EMV of 25.000 (if you do not upgrade)
-
As the impact is the same, you can choose any of the options
Question 20
Question
Which one of the following is NOT a response strategy for negative risks or threats?
Answer
-
Avoid
-
Mitigate
-
Exploit
-
Transfer
Question 21
Question
With which type of contract is the seller MOST concerned about project scope?
Question 22
Question
Which team development stages are included in the Tuckman Model?
Answer
-
Forming, Storming, Norming, Performing and Solving
-
Forming, Warming, Storming, Performing and Adjourning
-
Forming, Storming, Norming, Performing and Adjourning
-
Forming, Storming, Norming, Adjourning and Resolving
Question 23
Question
Which of the following is a chief characteristic of the Delphi technique?
Question 24
Question
You have just identified the risks. What is the next process?
Question 25
Question
A schedule performance index (SPI) of 0.76 means:
Answer
-
You are only progressing at 76 percent of the rate originally planned.
-
You are only progressing at 24 percent of the rate originally planned.
-
You are ahead of schedule.
-
You are over budget.
Question 26
Question
Cause-and-effect diagrams are also called?
Answer
-
Control Charts
-
Pareto Charts
-
Fishbone diagram
-
Flow Charts
Question 27
Question
What conflict resolution technique is a project manager using when he says, "I cannot deal with this issue now!"
Answer
-
Forcing
-
Problem solving
-
Withdrawing
-
Compromising
Question 28
Question
Budget at Completion (BAC) ...
Answer
-
may be calculated based on performance to date or estimated by the project team
based on other factors.
-
is equal to the actual cost (AC) plus the estimate to complete (ETC) for all of the remaining work.
-
is the sum of all the budgets established for the work to be performed on a project or a work breakdown structure component or an activity.
-
is the value of work performed expressed in terms of the approved budget assigned to that work for an activity or work breakdown structure component.
Question 29
Question
How long is the critical path is this example?
Question 30
Question
The process 'Sequence Activities' belongs to which Knowledge Area?
Question 31
Question
If you have to shorten the project duration without reducing the scope you can do the following:
Question 32
Question
Secondary risks are
Answer
-
The risks that remain after planned responses have been implementes
-
A direct outcome of risk responses
-
Risks with a low priority and therefore will not be considered in further plannings
-
Risks that are deliberately accepted
Question 33
Question
You are estimating activity durations and have got the following values:
Pessimistic: 12
Most likely: 5
Optimistic: 4
What is the expected duration when you are using Beta Distribution?
Question 34
Question
Which of the following is not a valid organizational structure?
Question 35
Question
Which of the following is included in a project charter?
Answer
-
Detailed resource estimates
-
A risk management strategy
-
Work package estimates
-
The business need for the project
Question 36
Question
An organization is restructuring the way it does projects. In a shift from a strong matrix organization to a weak matrix organization, the power is shifted from the:
Answer
-
Project manager to the functional manager.
-
Functional manager to the project manager.
-
Functional manager to the sponsor.
-
Expediter to the coordinator.
Question 37
Question
When a product or service completely meets a customer‘s requirements:
Answer
-
The cost of quality is low.
-
Quality is achieved
-
The customer pays the minimum price.
-
The cost of quality is high.
Question 38
Question
The work breakdown structure is basis for all of the following EXCEPT:
Answer
-
Network Diagram
-
Risk Management
-
Estimating
-
Project charter
Question 39
Question
Which of the following leadership traits is MOST important for a project manager?
Answer
-
Project control
-
Communication
-
Technical expertise
-
Team building
Question 40
Question
The MOST important output of the process Plan Stakeholder Management is the ...
Question 41
Question
Which of the following regarding WBS is NOT correct?
Answer
-
What is not in the WBS is not part of the project
-
WBS means - Work Best to meet Schedule
-
Is often structured by phases
-
Is best presented as a graph
Question 42
Question
Which of the following is not a contract type category?
Question 43
Question
The highest point of Maslow's hierarchy of needs is called:
Question 44
Question
Which of the following risks is the biggest threat to the project?
Question 45
Question
Which of the following is CORRECT?
Answer
-
Critical path and near-critical path are the same
-
There can be only 1 critical path
-
Activities on the critical path have no buffer
-
A project can never have negative float