Question 1

Question
Most issues/problems require more than one measurement to characterize and understand. Is this sentence True or False?
Answer
  • True
  • False

Question 2

Question
The number of re-work is an example of the following project metrics:
Answer
  • Quality metrics
  • Schedule metrics
  • Risk metrics
  • Resources metrics
  • Cost metrics

Question 3

Question
In Configuration Management Tasks what mean “Identification”
Answer
  • Ensure changes are made properly
  • Authority to approve and prioritize changes
  • Controlling changes before and after customer release
  • Tracking changes to multiple SCI versions
  • Tell others about changes made

Question 4

Question
In Configuration Management Tasks what mean “Change control”
Answer
  • Ensure changes are made properly
  • Authority to approve and prioritize changes
  • Controlling changes before and after customer release
  • Tracking changes to multiple SCI versions
  • Tell others about changes made

Question 5

Question
In Configuration Management Tasks what mean “Configuration auditing”
Answer
  • Ensure changes are made properly
  • Authority to approve and prioritize changes
  • Controlling changes before and after customer release
  • Tracking changes to multiple SCI versions
  • Tell others about changes made

Question 6

Question
In Configuration Management Tasks what mean “Version control”
Answer
  • Authority to approve and prioritize changes
  • Tell others about changes made
  • Controlling changes before and after customer release
  • Tracking changes to multiple SCI versions
  • Ensure changes are made properly

Question 7

Question
In Configuration Management Tasks what mean “Reporting”
Answer
  • Authority to approve and prioritize changes
  • Tell others about changes made
  • Controlling changes before and after customer release
  • Tracking changes to multiple SCI versions
  • Ensure changes are made properly

Question 8

Question
Which one of the above risk areas must be done well on a project and why?
Answer
  • All areas ?
  • Risk Mitigation - Requires the team to setup a plan for ...
  • Risk Identification - Requires the team to produce a ToS
  • Risk prioritization - Requires the team to evaluate ToS

Question 9

Question
Metrics should augment and replace, good management judgment. Is this sentence True or False?
Answer
  • True
  • False

Question 10

Question
If we have 5 key stakeholder, how many channel of communication we need to consider?
Answer
  • 10
  • 12
  • 5
  • 9
  • 15

Question 11

Question
Business reorganization canNOT cause changes in current projects (for the same organization). True/False?
Answer
  • True
  • False

Question 12

Question
The schedule is a good way to track a project.
Answer
  • True
  • False

Question 13

Question
The schedule ties all parts of the project together.
Answer
  • True
  • False

Question 14

Question
User manual is an example of Configuration Item?
Answer
  • True
  • False

Question 15

Question
If you are given the rime of a co-worker to help you for the three days and the tasks have the following dependencies. Task B must follow Task A and Task E must follow Task D. How long will the project take? Task A 2 days | Task B 3 days Task C 5 days| Task D 2 days Task E 5 days | Task F 1 day (Given that you are working only 5 days in a week)
Answer
  • 2 weeks 4 days
  • 3 weeks
  • 3 weeks 3 days
  • 4 weeks

Question 16

Question
In SCM Processes “Configuration audit”
Answer
  • Independent review or examination to assess if a product or process is in compliance with specification, standards, contractual agreement, or other criteria
  • Used to ensure that changes to a product or system are introduced in a controlled and coordinated manner
  • Administrative tracking and reporting of Cis in CM system
  • Creation and availability of a new version of software to the public

Question 17

Question
In SCM Processes “Release management”
Answer
  • Independent review or examination to assess if a product or process is in compliance with specification, standards, contractual agreement, or other criteria
  • Used to ensure that changes to a product or system are introduced in a controlled and coordinated manner
  • Administrative tracking and reporting of Cis in CM system
  • Creation and availability of a new version of software to the public

Question 18

Question
In SCM Processes “Status Accounting”
Answer
  • Independent review or examination to assess if a product or process is in compliance with specification, standards, contractual agreement, or other criteria
  • Used to ensure that changes to a product or system are introduced in a controlled and coordinated manner
  • Administrative tracking and reporting of Cis in CM system
  • Creation and availability of a new version of software to the public

Question 19

Question
Which sequence is the correct to testing structure (organization)?
Answer
  • Functional Test-> Unit test-> Component test->Regression test
  • Unit test-> Component test-> Regression test ->Functional Test
  • Functional Test-> Unit test-> Regression test-> Component test
  • Unit test-> Functional Test-> Component test-> Regression test

Question 20

Question
While measuring the SV (Schedule Variance) we will get the Positive value, what does it mean?
Answer
  • None of the given
  • Ahead of Schedule => Positive
  • On schedule => neutral
  • Behind Schedule => negative

Question 21

Question
When considering making the schedule for a project, which of the following items is critical to know?
Answer
  • All of the given
  • The estimates for the project
  • The scope for the project
  • The risks associated with the project

Question 22

Question
Critical path method is used in which of the following processes:
Answer
  • Estimate Activity Durations
  • Define Activities
  • Develop Schedule
  • Sequence Activities

Question 23

Question
Provide a definition for the following terms:
Answer
  • Metrics - A use of measure to evaluate the state of a process or tasks that are being completed
  • Quality - The process of ensuring that the product or goal is met with certain expectations and abilities meeting what the customer or user wants from the product.
  • Configuration Management - The product that mechanism to ensure that as developed is under control to the point that any version of the product along its lifecycle can be produced.
  • Lifecycle - The understanding of the total existence of a project or product from its first inception to the point at which it is stopped and never acted upon. For the living creatures it is birth to death.
  • Process Model - A representation of the methods that will be used to achieve a goal.

Question 24

Question
Please provide a proper description of the notion below:
Answer
  • Metrics - provides measuring units to depict values, threshold, constraints, scope, duration, maximums, minimums, and average, etc
  • Measures - represents information to establish a common understanding of status, condition and position of something.
  • Software Project Metrics - Tools for anyone involved in software engineering to understand varying aspects of the code base, and the project progress.

Question 25

Question
Match the abbreviations with the correct definitions:
Answer
  • The amount of budget deficit or surplus at a given point in time, expressed as the difference between the earned value and the actual cost - CV(cost variance)
  • The amount by which the project is ahead or behind the planned delivery date, at a given point in time, expressed as the difference between the earned value and the planned value - SV(Schedule variance)
  • The authorized budget assigned to scheduled work - PV(Planned value)
  • The realization cost incurred for the work performed on an activity during a specific time period - AC (Actual cost)

Question 26

Question
If the students had the lecture 2 days ago how much information they can recall?
Answer
  • 50%
  • 10%
  • 70%
  • 25%

Question 27

Question
Please provide a definition of a critical path of the project schedule
Answer
  • The path which contains the task of the project with 0 slack time
  • The path which contains the task of the project with non-zero slack time

Question 28

Question
It is best to represent risks in an IF-Then format
Answer
  • True
  • False

Question 29

Question
Leadership is primarily dealing with:
Answer
  • Change Management
  • Situation analysis
  • Attention getting
  • Approval provision
  • Complexity Management

Question 30

Question
Configuration management is all about
Answer
  • budget control
  • human resource control
  • change control
  • quality control

Question 31

Question
Budgetary or scheduling constraints can cause changes
Answer
  • True
  • False

Question 32

Question
Every software engineer has to be concerned how changes are made
Answer
  • True
  • False

Question 33

Question
Not an example of Stakeholder:
Answer
  • approving manager
  • external customer
  • project manager
  • 3rd-party supplier
  • internal customer

Question 34

Question
What organizational structure is most project focused?
Answer
  • Functional
  • Strong Matrix
  • Weak Matrix
  • Balanced Matrix
  • Projectized

Question 35

Question
The ___ is key to the definition of a project?
Answer
  • project has a fixed amount of resources to complete it.
  • manager is needed for a project to exist.
  • project time is unchangeable.
  • number of requirements divided by the resources times the hours does not exceed three the scope development time.
  • goal is clear and singular.

Question 36

Question
Data used in project can be CI
Answer
  • True
  • False

Question 37

Question
What is risk? Choose False
Answer
  • the faster your project is conducted the less risk you have
  • k

Question 38

Question
What is risk? Choose True
Answer
  • Risk is neither good or bad it just occurs every time we make a decision
  • kk

Question 39

Question
Intangible assets are include:
Answer
  • Franchises
  • Patents
  • Copyrights
  • Inventory
  • Securities like stocks

Question 40

Question
New market conditions usually never trigger changes
Answer
  • True
  • False

Question 41

Question
Metrics cannot identify, explain or predict everything
Answer
  • True
  • False

Question 42

Question
List the set of tasks which if completed will get the project exactly 75% complete? Task N 10 hours, Task O 5 hours, Task P 7 hours, Task Q 4 hours, Task R 20 hours, Task S 12 hours, Task T 19 hours, Task U 15 hours, Task V 8 hours.
Answer
  • N,O,P,Q,R
  • N,Q,T,O,R,U,P
  • O,Q,R,T,U,S
  • S,T,U,V

Question 43

Question
Configuration Management Maturity
Answer
  • 5 Levels
  • 4 Levels
  • 6 Levels
  • 2 Levels

Question 44

Question
CPI = EV / actual cost
Answer
  • True
  • False

Question 45

Question
Which one of the above risk areas must be done well on a project and why
Answer
  • ALL areas
  • Risk mitigation
  • Risk identification
  • Risk Prioritization

Question 46

Question
Just learn
Answer
  • Are drown up early on a project's life cycle – Project Charter
  • Are groups of individuals who have an interest – Stakeholder
  • Splits large project tasks into more manageable – WBS

Question 47

Question
What is meant by the term “project network diagram”?
Answer
  • Detailed description of work packages
  • Graphical representation of activities or nodes and the dependencies between them
  • Definition of tasks
  • Protection of the necessary resources

Question 48

Question
In the PEAK decision model, risk is one of the outputs of decisions made for project
Answer
  • True
  • False

Question 49

Question
Project manager should only at the beginning of the project identify and analyze the risk faced by their project. True or False?
Answer
  • True
  • False

Question 50

Question
Gannt chart is used to show project timeline
Answer
  • True
  • False

Question 51

Question
Who conduct the beta testing
Answer
  • Developers
  • Testers
  • Customers

Question 52

Question
Parkinson’s Law in Project Management Estimation
Answer
  • it is never to reach absolute
  • 80% effects from 20% causes
  • work will grow to fill time allocated
  • bad defined project causes failure

Question 53

Question
To understand clearly what a project is requires elicitation techniques that work well. How can we best tell if the elicitation techniques we are using work well?
Answer
  • The customer agrees
  • The developers says
  • The requirements are testable
  • The project team is using effort on the project
  • The project management states that they are

Question 54

Question
What are the control mechanisms ? Please find TRUE statement
Answer
  • Processes contain lifecycles
  • You cannot control something if you are monitoring it
  • The control mechanism (management) process for a development project should be defined
  • Monitoring and Tracking are the same thing
  • Control and Status are the same thing

Question 55

Question
Why do we need teams?
Answer
  • all people are social and work better in social environment
  • a well setup team can better utilize the skills of people
  • everyone knows that a team can do more than individual
  • teams are always fun…

Question 56

Question
What type of Stakeholder do you know?
Answer
  • Primary and Secondary
  • Suppliers and Competitors
  • Stakeholders and Investors
  • Change and Manage

Question 57

Question
SRS acronym is stand for Software Requirements Specification
Answer
  • True
  • False

Question 58

Question
What types of software testing can involve Users?
Answer
  • Functional testing
  • Integration testing
  • Beta testing & Usability testing
  • Unit testing

Question 59

Question
The problem stated as “Can the project be done at the specified cost with the available resources?” is relates to
Answer
  • Project schedule
  • Project quality
  • Project cost
  • Project scope

Question 60

Question
How can I identify a clear scope for a project?
Answer
  • There are a clear set of wants from all the stakeholders written up for the scope
  • The customers approves of what is written up as the scope for the project
  • All statements about what needs to be done are well written
  • The development team agrees with what is written up as the scope of the project.

Question 61

Question
What does EV metric measure?
Answer
  • Estimated Value - The authorized budget assigned to scheduled work.
  • Elaborative Value - The expected cost to finish all the remaining project work.
  • Executive Value - The sum of all budgets established for the work to be performed.
  • Earned Value - The measure of work performed expressed in terms of the budget authorized for that work.

Question 62

Question
What is not an example of Stakeholder?
Answer
  • External customer
  • Third-party supplier
  • Neighbours
  • Approving manager
  • Internal customer

Question 63

Question
What is NOT an input for Quality Control Process?
Answer
  • Quality metrics
  • Quality checklists
  • Process flowcharts
  • Validated deliverables

Question 64

Question
How many steps are in 'Metrics & Measures - Roadmap' ?
Answer
  • 8
  • 4
  • 5
  • 7
  • 6

Question 65

Question
Tangible assets are include:
Answer
  • Patents
  • Trademarks
  • Franchises
  • Securities like stocks,bonds,and cash
  • Furniture

Question 66

Question
What is an example of Requirements metrics?
Answer
  • Milestones
  • Lack data for reviewing metrics
  • Traceablity
  • Re-work
  • EAV

Question 67

Question
For the basic estimation techniques,you have learned about please select a proper description
Answer
  • Bottom Up - Have an understanding of bottom pieces of the project and then builds the full picture of project estimate
  • Estimation by analogy - Requires a local,idiosyncratic,database
  • Top Down - Generate the top parts and then cost smaller and smaller pieces and add them up
  • Wideband Delphi - Using a group of people to improve an estimate
  • Algorithmic/Parametric - Using computer models to enter values and generate an estimate for a project
Show full summary Hide full summary

Similar

Respiratory System Quiz
Phil Cummins
HISTORY
Adnan igdeli
Nervous system test
Phil Cummins
METODOS DE DEPRECIACION
atara666
Hardware
Dhanil Capil
Software
Dhanil Capil
BATTERIES DIMENSIONS
CECILIA TANGARI
territoire autochtone Inuit isaac f.l
isaacforestlalib
family
noorh suod
KEEPING HEALTHY
yaminabbas150