4.2 Steam Turbine Auxillaries and Operation

Description

power engineering 3b2 Quiz on 4.2 Steam Turbine Auxillaries and Operation, created by TRAVIS CANNING on 29/02/2016.
TRAVIS CANNING
Quiz by TRAVIS CANNING, updated more than 1 year ago
TRAVIS CANNING
Created by TRAVIS CANNING almost 9 years ago
27
1

Resource summary

Question 1

Question
In a turbine circuit, feed heaters and dearators serve to:
Answer
  • use up excess steam
  • Increase efficiency
  • Provide load during low demand periods
  • Increase turbine output

Question 2

Question
The high-pressure oil system of a typical turbine supplies oil to
Answer
  • Bearings
  • Gears
  • Emergency stop valves
  • The oil purifier
  • The auxillary oil pump

Question 3

Question
When starting a condensing or extraction turbine, the extraction (condensate)pump is started ______ the _____ 1. before 2. after 3. air ejector 4. jacking oil pump 5. condenser circulating water pump
Answer
  • 1,3
  • 2,3
  • 1,4
  • 1,5
  • 2,5

Question 4

Question
When starting an extraction turbine, sealing steam to the turbine glands is admitted _____ is put in operation
Answer
  • Before the extraction pump
  • Before the condenser circulating water pump
  • After the air ejector
  • After the extraction pump
  • After the throttle valve is open

Question 5

Question
The jacking oil pump is shut down when the turbine reaches a speed of approximately _____ rpm
Answer
  • 5-10
  • 20-30
  • 40-50
  • 50-60
  • 0-80

Question 6

Question
The overspeed trip a turbine is usually set to trip the mechanism when it reaches ____ of operating speed
Answer
  • 100%
  • 105%
  • 110%
  • 115%
  • 120%

Question 7

Question
Lubricating oil for a turbine may: 1. Lubricate bearings 2. Lubricate gears. 3. Operate throttle valves. 4. Be supplied to a governor.
Answer
  • 1,2
  • 3,4
  • 1,2,3
  • 2,3,4
  • 1,2,3,4

Question 8

Question
When a hydraulic overspeed trip operates 1. High pressure oil forces the main steam valve shut. 2. High pressure oil supply is shut off 3. The stop valve oil cylinder drain is closed. 4. The stop valve oil cylinder drain is opened 5. A spring closes the main steam valve 6. The pilot drain is closed
Answer
  • 1,3,6
  • 2,4,5
  • 3,4,6
  • 2,4,6
  • 3,4,5

Question 9

Question
The warm up time required of a turbine is dependant on
Answer
  • How quickly the turbine is required
  • The manufacturers instructions
  • The size of the turbine
  • The type of turbine
  • Whether the steam is dry or wet

Question 10

Question
Overload governing is used on ______ turbines
Answer
  • Small
  • Impulse
  • Low pressure
  • Reaction
  • Impulse and Reaction
Show full summary Hide full summary

Similar

German GCSE Vocab
naomisargent
Biology Unit 2 - DNA, meiosis, mitosis, cell cycle
DauntlessAlpha
A2 Ethics - Virtue Ethics
Heloise Tudor
Sociology- Key Concepts
Becky Walker
Forms of Business Ownership Quiz
Noah Swanson
Business Studies - AQA - GCSE - Types of Ownership
Josh Anderson
Using GoConqr to study Art
Sarah Egan
Using GoConqr to learn French
Sarah Egan
Repaso Revalida PR 2016
Rodrigo Lopez
3MA114 Management_test 1/2
Jakub Beyr
Anatomie - sistemul digestiv 1
Eugeniu Nicolenco