The link between switch SW1 and switch SW2 is configured as a trunk, but the trunk failed to establish connectivity between the switches. Based on the configurations and the error messages received on the console of SW1, what is the cause of the problem?
The two ends of the trunk have different duplex settings.
The two ends of the trunk have different EtherChannel configurations.
The two ends of the trunk have different native VLAN configurations
The two ends of the trunk allow different VLANs on the trunk.
Question 4
Question
When you create a network implementation for a VLAN solution, what is one procedure that you should include in your plan?
Answer
Perform an incremental implementation of components.
Implement the entire solution and then test end-to-end to make sure that it is performing as designed.
Implement trunking of all VLANs to ensure that traffic is crossing the network as needed before performing any pruning of VLANs.
Test the solution on the production network in off hours.
Question 5
Question
You have just created a new VLAN on your network. What is one step that you should include in your VLAN-based implementation and verification plan?
Answer
Verify that different native VLANs exist between two switches for security purposes.
Verify that the VLAN was added on all switches with the use of the show vlan command.
Verify that the switch is configured to allow for trunking on the switch ports.
Verify that each switch port has the correct IP address space assigned to it for the new VLAN.
Question 6
Question
Which two statements describe a routed switch port on a multilayer switch? (Choose two.)
Answer
Layer 2 switching and Layer 3 routing are mutually supported.
The port is not associated with any VLAN.
The routed switch port supports VLAN subinterfaces.
The routed switch port is used when a switch has only one port per VLAN or subnet.
The routed switch port ensures that STP remains in the forwarding state.
Question 7
Question
On a multilayer Cisco Catalyst switch, which interface command is used to convert a Layer 3
interface to a Layer 2 interface?
Answer
switchport
no switchport
switchport mode access
switchport access vlan vlan-id
Question 8
Question
All network links are FastEthernet. Although there is complete connectivity throughout the network,
Front Line users report that they experience slower network performance when accessing the
server farm than the Reception office experiences. Which two statements are true? (Choose two.)