Pregunta 1
Pregunta
A project manageris managing his second project. It started one month after the first, and both are in process. Though his first project is small, this one seems to be growing size every day. As each day passes, the project manager is beginning to feel more and more in need of help. The project manager has recently heard that there was another project in the company last year that is similar to his second project. What should he do?
Respuesta
-
Contact the other project manager and ask for assistance
-
Obtain historical records and guidance from the project management office (PMO)
-
Wait to see if the project is impacted by the growth in scope
-
Make sure the scope of the project is agreed to by all the stakeholders
Pregunta 2
Pregunta
Two project managers have just realized that they are in a weak matrix organization and that their power as project managers is quite limited. One figures out that he is really a project expediter, and other realizes he is really a project coordinator.
How is a project expediter different from a project coordinator?
Respuesta
-
The project expediter cannot make decisions
-
The project expediter can make more decisions
-
The project expediter reports to a higher-level manager
-
The project expediter has some authority
Pregunta 3
Pregunta
All of the following are characteristic of a project EXCEPT:
Respuesta
-
It is temporary
-
It has a definite beginning and end
-
It has interrelated activities
-
It repeats itself every month
Pregunta 4
Pregunta
A framework for keeping an organization focused on its overall strategy is:
Pregunta 5
Pregunta
Which of the following BEST describes the major constraints on a project?
Respuesta
-
Scope, number of resources, and cost
-
Scope, cost, and time
-
Scope, time, cost, quality, risk, resources, and customer satisfaction
-
Time, cost, and number of changes
Pregunta 6
Pregunta
If a project manager is concerned with gathering, integrating, and disseminating the outputs of all project management processes, she should concentrate on improving the:
Respuesta
-
Work breakdown structure (WBS)
-
Communications management plan
-
Project management information system (PMIS)
-
Scope management plan
Pregunta 7
Pregunta
A project team is working on manufacturing a new product, but they are having difficulty creating a project charter. What is the BEST description of the real problem?
Respuesta
-
They have not identified the project objectives
-
They are working on a process and not a project
-
The end date has not been set
-
The have not identified the product of the project
Pregunta 8
Pregunta
One of your team members informs you that he does not know which of the many projects he is working on is the most important. Who should determine the priorities between projects in a company?
Pregunta 9
Pregunta
The difference between a project, program, and portfolio is:
Respuesta
-
A project is a temporary endeavor with a beginning and an end, a program may include other non-project work, and a portfolio is all the project in a given department or division
-
A project is a lengthy endeavor with a beginning and an end, a program combines tow or more unrelated projects, and a portfolio combines two or more programs
-
A project is a a temporary endeavor with a beginning and an end, a program is a group of related projects, and portfolio is a group of projects and programs related to a specific objective
-
A project is a contracted endeavor with a beginning and end, a portfolio is a group of projects with more open-ended completion dates, and a program combines two or more portfolios
Pregunta 10
Pregunta
Operational work is different from project work in that operation work is
Pregunta 11
Pregunta
Company procedures require the creation of a lessons learned document. Which of the following is the BEST use of lessons learned?
Respuesta
-
Historical records for future projects
-
Planning record for the current project
-
Informing the team about what the project manager has done
-
Informing the team about the project management plan
Pregunta 12
Pregunta
Lessons learned are BEST completed by:
Respuesta
-
The project manager
-
The team
-
The spnsor
-
The Stakeholders
Pregunta 13
Pregunta
Consideration of ongoing operations and maintenance is crucially important to a products of projects. Ongoing operations and maintenance should:
Respuesta
-
Be included as activities to be performed during project closure
-
Have a separate phase in the project life cycle, because a large portion of life cycle costs is devoted to maintenance and operations
-
Not be viewed as part of a project
-
Be viewed as a separate project
Pregunta 14
Pregunta
What is a program?
Respuesta
-
An initiative set up by management
-
A means to gain benefits and control of related projects
-
A group of unrelated projects managed in a coordinated way
-
A government regulation
Pregunta 15
Pregunta
A company is making an effort to improve its project performance and create historical records of past projects. What is the BEST way to accomplish this?
Pregunta 16
Pregunta
Use the project scope statement to gain approval of the "final" scope from the stakeholders before further planning is done. During which process group is this done?
Respuesta
-
Initiating
-
Planning
-
Executing
-
Monitoring & Controlling
-
Closing
Pregunta 17
Pregunta
Determine high-level requirements, constrains, assumptions, and risks.
During which process group is this done?
Pregunta 18
Pregunta
Measure against the performance measurement baseline.
During which process group is this done?
Pregunta 19
Pregunta
Implement approved changes, including corrective actions, preventive actions, and defect repair.
During which process group is this done?
Respuesta
-
Initating
-
Planning
-
Executing
-
Monitoring & Controlling
-
Closing
Pregunta 20
Pregunta
Reanalyze existing risks.
During which process group is this done?
Respuesta
-
Initiating
-
Planning
-
Executing
-
Monitoring & Controlling
-
Closing
Pregunta 21
Pregunta
Use the high-level planning and estimating data to determine whether the product can be achieved with the given constraints. During which process group is this done?
Respuesta
-
Initiating
-
Planning
-
Executing
-
Monitoring & Controlling
-
Closing
Pregunta 22
Pregunta
Verify and document that the project, or project phase, meets completion or exit criteria set in place during project planning. During which process group is this done?
Respuesta
-
Initiating
-
Planning
-
Execution
-
Monitoring & Controlling
-
Closing
Pregunta 23
Pregunta
Hold team-building activities. During which process group is this done?
Respuesta
-
Initiating
-
Planning
-
Executing
-
Monitoring & Controlling
-
Closing
Pregunta 24
Pregunta
Evaluate the effectiveness of risk responses in a risk audit. During which process group is this done?
Respuesta
-
Initiating
-
Planning
-
Executing
-
Monitoring & Controlling
-
Closing
Pregunta 25
Pregunta
Determine how you will plan the planning, executing, and controlling efforts for stakeholders, requirements, scope, schedule, cost, quality, process improvement, human resources, communications, risk, procurement, changes, and configuration, and put that information into the beginnings of management plans. During which process group is this done?
Respuesta
-
Initiating
-
Planning
-
Executing
-
Monitoring & Controlling
-
Closing
Pregunta 26
Pregunta
Obtain formal (legal) sign-off and final acceptance of the product of the project from the customer.
During which process group is this done?
Respuesta
-
Initiating
-
Planning
-
Executing
-
Monitoring & Controlling
-
Closing
Pregunta 27
Pregunta
Increase the effectiveness of processes.
During which process group is this done?
Respuesta
-
Initiating
-
Planning
-
Executing
-
Monitoring & Controlling
-
Closing
Pregunta 28
Pregunta
Recalculate how much the project will cost and how long it will take, and create forecasts.
During which process group is this done?
Respuesta
-
Initiating
-
Planning
-
Executing
-
Monitoring & Controlling
-
Closing
Pregunta 29
Pregunta
Plan what will be communicated on the project, to whom, by whom, when, and how.
During which process group is this done?
Respuesta
-
Initiating
-
Planning
-
Executing
-
Monitoring & Controlling
-
Closing
Pregunta 30
Pregunta
Spend time trying to improve quality.
During which process group is this done?
Respuesta
-
Initiating
-
Planning
-
Executing
-
Monitoring & Controlling
-
Closing
Pregunta 31
Pregunta
Make sure the business case and the analysis supporting the need for the project are documented and understood. During which process group is this done?
Respuesta
-
Initiating
-
Planning
-
Executing
-
Monitoring & Controlling
-
Closing
Pregunta 32
Pregunta
Evaluate how effectively the team members function as a team.
During which process group is this done?
Respuesta
-
Initiating
-
Planning
-
Executing
-
Monitoring & Controlling
-
Closing
Pregunta 33
Pregunta
Determine how you will improve the processes in use on the project.
During which process group is this done?
Respuesta
-
Initiating
-
Planning
-
Executing
-
Monitoring & Controlling
-
Closing
Pregunta 34
Pregunta
Determine measurable project and product objectives.
During which process group is this done?
Respuesta
-
Initiating
-
Planning
-
Executing
-
Monitoring & Controlling
-
Closing
Pregunta 35
Pregunta
Manage time and cost reserves.
During which process group is this done?
Respuesta
-
Initiating
-
Planning
-
Executing
-
Monitoring & Controlling
-
Closing
Pregunta 36
Pregunta
Focus on looking for exceptions to the approved project management plan in team members' performance, rather than checking up on every person's work or babysitting.
During which process group is this done?
Respuesta
-
Initiating
-
Planning
-
Executing
-
Monitoring & Controlling
-
Closing
Pregunta 37
Pregunta
Develop the final project management plan, project documents, and performance measurement baseline by performing schedule network analysis, looking for options, and confirming that project objectives can be met.
During which process group is this done?
Respuesta
-
Initiating
-
Planning
-
Executing
-
Monitoring & Controlling
-
Closing
Pregunta 38
Pregunta
Gather final lessons learned.
During which process group is this done?
Respuesta
-
Initiating
-
Planning
-
Executing
-
Monitoring & Controlling
-
Closing
Pregunta 39
Pregunta
Keep everyone focused on completing the project to the project charter and project management plan.
During which process group is this done?
Respuesta
-
Initiating
-
Planning
-
Executing
-
Monitoring & Controlling
-
Closing
Pregunta 40
Pregunta
Calculate estimate to complete.
During which process group is this done?
Respuesta
-
Initiating
-
Planning
-
Executing
-
Monitoring & Controlling
-
Closing
Pregunta 41
Pregunta
In which project management process group is the detailed project budget created?
Pregunta 42
Pregunta
The project charter is created in which project management process group?
Respuesta
-
Executing
-
Planning
-
Closing
-
Initiating
Pregunta 43
Pregunta
The project team has just completed the initial project schedule and budget. The NEXT thing to do is to:
Pregunta 44
Pregunta
A detailed project schedule can be created only after creating the:
Respuesta
-
Project Budget
-
Work breakdown structure
-
Project management plan
-
Detailed risk assessment
Pregunta 45
Pregunta
The person who should be in control of the project during project planning is the:
Respuesta
-
Project Manager
-
Team member
-
Functional manager
-
Sponsor
Pregunta 46
Pregunta
Which of the following is NOT an input to the initiating process group?
Respuesta
-
Company processes
-
Company culture
-
Historical WBSs
-
Project scope statement
Pregunta 47
Pregunta
The project sponsor has just signed the project charter. What is the NEXT thing to do?
Respuesta
-
Begin to complete work packages
-
Validate scope
-
Start integrate change control
-
Start to create management plans
Pregunta 48
Pregunta
The high-level project schedule constraints have just been determined. What project management process group are you in?
Pregunta 49
Pregunta
The WBS and WBS dictionary are completed. The project team has begun working on identifying risks. The sponsor contacts the project manager, requesting that the responsibility assignment matrix be issued. The project has a budget of US $100,000 and taking place in three countries using 14 human resources. There is little risk expected for the project, and the project manager has managed many projects similar to this one. What is the NEXT thing to do.
Respuesta
-
Understand the experience of the sponsor on similar projects
-
Create an activity list
-
Make sure the project scope is defined
-
Complete risk management and issue the responsibility assignment matrix
Pregunta 50
Pregunta
A project manager does not have much time to spend on planning before the mandatory start date arrives. He therefore wants to move through planning as effectively as possible. What advice would you offer?
Respuesta
-
Make sure you have signed charter and then start the WBS
-
Create an activity list before creating a network diagram
-
Document all the known risks before you document the high level assumptions
-
Finalize the quality management plan before you determine quality metrics
Pregunta 51
Pregunta
The BEST time to assign a project manager to a project is during:
Respuesta
-
Integration
-
Project selection
-
Initiating
-
Planning
Pregunta 52
Pregunta
A project manager gets a call from a team member notifying him that there is a variance between the speed of a system on the project and the desired or planned speed. The project manager is surprised because that performance measurement was not identified in planning. If the project manager then evaluates whether the variance warrants a response, he is in which part of the project management process?
Pregunta 53
Pregunta
A team member notifies the project manage that the activities comprising a work package are no longer appropriate. It would be BEST for the project manager to be in what part of the project management process:
Pregunta 54
Pregunta
During a meeting, a team member asks about the measurements that will be used on the project to assess performance. The team member feels that some of the measures related to activities assigned to him are not valid measurements. The project is BEST considered to be in what part of the project management process?
Pregunta 55
Pregunta
Which of the following is the MOST appropriate thing to do during the initiating process group?
Respuesta
-
Create a detailed description of the project deliverables
-
Get familiar with the company culture and structure as they relate to the project
-
Identify the root cause of problems
-
Ensure all project management processes are complete
Pregunta 56
Pregunta
Which of the following is a characteristic of project management processes?
Respuesta
-
Iterative
-
Unique
-
Unnecessary
-
Standardized
Pregunta 57
Pregunta
Which project management process group generally takes the MOST project time and resources?
Respuesta
-
Planning
-
Design
-
Integration
-
Executing
Pregunta 58
Pregunta
All of the following must be performed during project initiating EXCEPT:
Respuesta
-
Identify and document business needs
-
Create a project scope statement
-
Divide a large project into phases
-
Accumulate and evaluate historical information
Pregunta 59
Pregunta
Closure includes all of the following EXCEPT:
Respuesta
-
Determining performance measures
-
Turning over the product of the project
-
Documenting the degree to which each project phase was properly closed after its completion
-
Updating the company's organizational process assets
Pregunta 60
Pregunta
The first phase of your project has come to an end. What is the MOST important thing to ensure is done BEFORE beginning the next phase?
Respuesta
-
Verify that the resources are available for the next phase
-
Check the project's progress compared to its baselines
-
Confirm that the phase has reached it objectives, and have its deliverable formally accepted
-
Recommend corrective action to bring the project results in line with project expectations
Pregunta 61
Pregunta
During which process group does the team measure and analyze the work being done on the project?
Pregunta 62
Pregunta
Which process groups must be included in every project?
Respuesta
-
Planning, executing, and closing
-
Initiating, planning, and executing
-
Initiating, planning, executing, monitoring and controlling, and closing
-
Planning, executing, and monitoring and controlling
Pregunta 63
Pregunta
Which of the following is the MOST appropriate thing to do in project closing?
Respuesta
-
Work with the customer to determine acceptance criteria
-
Collect historical information from previous projects
-
Confirm all the requirements in the project have been met
-
Gain formal approval of the management plans
Pregunta 64
Pregunta
Which process group focuses on completing the requirements of the project?
Respuesta
-
Initiating
-
Planning
-
Executing
-
Closing
Pregunta 65
Pregunta
All of the following occur during the planning process group EXCEPT:
Respuesta
-
Develop Project Charter
-
Create WBS
-
Estimate Costs
-
Sequence Activities
Pregunta 66
Pregunta
A market demand, a business need, and/or a legal requirement are examples of:
Respuesta
-
Reasons to hire a project manager
-
Reasons projects are initiated
-
Reasons people or businesses become stakeholders
-
Reasons to sponsor a project
Pregunta 67
Pregunta
The need for _______________ is one of the major driving forces for communication in a project.
Respuesta
-
Optimization
-
Integrity
-
Integration
-
Differentiation
Pregunta 68
Pregunta
The customer has accepted the completed project scope. However, the lessons learned required by the project management office have not been completed. What is the status of the project?
Respuesta
-
The project is incomplete because it needs to be replanned
-
The project is incomplete until all project and product deliverables are complete and accepted
-
The project is incomplete because the customer has accepted the deliverables
-
The project is incomplete because it has reached its due date
Pregunta 69
Pregunta
When it comes to changes, the project manager's attention is BEST focused on:
Respuesta
-
Making changes
-
Tracking and recording changes
-
Informing the sponsor of changes
-
Preventing unnecessary changes
Pregunta 70
Pregunta
The customer on a project tells the project manager they have run out of money to pay for the project. What should the project manager do FIRST?
Pregunta 71
Pregunta
All of the following are parts of an effective change management plan EXCEPT:
Respuesta
-
Procedures
-
Standards for reports
-
Meeting
-
Lessons learned
Pregunta 72
Pregunta
A work authorization system can be used to:
Respuesta
-
Manage who does each activity
-
Manage when and in what sequence work is done
-
Mange when each activity is doen
-
Manage who does each activity and when it is done
Pregunta 73
Pregunta
A project is plagued by changes to the project charter. Who has the primary responsibility to decide if these changes are necessary?
Respuesta
-
The project manager
-
The project team
-
The sponsor
-
The stakeholder
Pregunta 74
Pregunta
Effective project integration usually requires an emphasis on:
Respuesta
-
The personal careers of the team members
-
Timely updates to the project management plan
-
Effective communication at key interface points
-
Product control
Pregunta 75
Pregunta
Integration is done by the:
Respuesta
-
Project Manager
-
Team
-
Sponsor
-
Stakeholders
Pregunta 76
Pregunta
Which of the following BEST describes the project manager's role as an integrator?
Respuesta
-
Help team members become familiar with the project
-
Put all the pieces of a project into a cohesive whole
-
Put all the pieces of a project into a program
-
Get all team members together into a cohesive whole
Pregunta 77
Pregunta
Approved corrective actions are an input to which of the following processes?
Pregunta 78
Pregunta
Double declining balance is a form of:
Pregunta 79
Pregunta
Which of the following BEST describes what a project charter may be used for when the work is being completed?
Respuesta
-
To make sure all the team members are rewarded
-
To help determine if a scope change should be approved
-
To assess the effectiveness of the change control system
-
To make sure that all the documentation on the project is completed
Pregunta 80
Pregunta
Which of the following BEST describes a project management plan?
Respuesta
-
A printout from project management software
-
A bar chart
-
Risk, human resource, process improvement, and other management plans
-
The project scope
Pregunta 81
Pregunta
Which of the following is TRUE about the development of a project charter?
Respuesta
-
The sponsor creates creates the project charter, and the project manager approves it
-
The project team creates the project charter, and PMO approves it
-
The executive manager creates the project charter, and the functional manager approves it
-
The project manager creates the project charter, and the sponsor approves it
Pregunta 82
Pregunta
A project management plan should be realistic in order to be used to manage the project. Which of the following is the BEST method to achieve a realistic project management plan?
Respuesta
-
The sponsor creates the project management plan based on input from the project manager
-
The functional manager creates the project management plan based on input from the project manager
-
The project manager creates the project management plan based on input from senior management
-
The project manager creates the project management plan based on input from the team
Pregunta 83
Pregunta
You are taking over a project during project planning and discover that six individuals have signed the project charter. Which of the following should MOST concern you?
Respuesta
-
Who will be a member of the change control board
-
Spending more time on configuration management
-
Getting a single project sponsor
-
Determining the report stucture
Pregunta 84
Pregunta
The project manager is working to clearly describe the level of involvement expected from everyone on the project in order to prevent rework, conflict, and coordination problems. Which of the following BEST describes the project manager's efforts?
Respuesta
-
Develop Project Management Plan and Plan Quality Management
-
Manage Stakeholder Engagement and Direct and Manage Project work
-
Validate Scope and Control Quality
-
Identify Risks and Develop Project Team
Pregunta 85
Pregunta
All of the following are parts of the Direct and Menage Project Work process EXCEPT:
Respuesta
-
Identify changes
-
Using a work breakdown structure
-
Implementing corrective actions
-
Setting up a project control system
Pregunta 86
Pregunta
A project manager is appointed to head a highly technical project in an area with which this person has limited familiarity. The project manager delegates the processes of Develop Schedule, Estimate Costs, Define Activities, and Estimate Activity Resources to various project team members, and basically serves as an occasional referee and coordinator of activities. The results of this approach are likely to be:
Respuesta
-
A team functioning throughout the project at a very high level, demonstrating creativity and commitment
-
A team that initially experiences some amounts of confusion, but that after a period of time becomes a cohesive and effective unit
-
A team that is not highly productive, but that stays together because of the work environment created by the project manager
-
A team tat is characterized by poor performance, low morale, high levels of conflict, and high turnover
Pregunta 87
Pregunta
You are in the middle of executing a major modification to an existing product when you learn that the resources promised at the beginning of the project are not available. The BEST thing to do is to:
Respuesta
-
Show how the resources were originally promised to your project
-
Re-plan the project without the resources
-
Explain the impact if the promised resources are not made available
-
Crash the project
Pregunta 88
Pregunta
The primary customer of a project has requested an application change during user testing. As project manager, how should you BEST address this issue?
Respuesta
-
Develop a risk mitigation plan
-
Create a formal change request
-
Inform the project sponsor of changes to scope, cost, and schedule
-
Ensure the scope change complies with all relevant contractual provisions
Pregunta 89
Pregunta
Your company just won a major new project. It will begin in three months and is valued at US $2,000,000. You are the project manager for an existing project. What is the FIRST thing you should do once you hear of the new project?
Respuesta
-
Ask management how the new project will use resources
-
Resource level your project
-
Crash your project
-
Ask management how the new project will affect your project
Pregunta 90
Pregunta
The project manager has just received a change from the customer that does not affect the project schedule and is easy complete. What should the Project Manager do FIRST?
Respuesta
-
Make the change happen as soon as possible
-
Contact the project sponsor for permission
-
Go to the change control board
-
Evaluate the impacts on other project constraints
Pregunta 91
Pregunta
Understanding the culture, policies, and procedures of the organization in which the project is being performed is MOST challenging in:
Pregunta 92
Pregunta
In a projectized organization, the project team:
Respuesta
-
Reports to many bosses
-
Has no loyalty to the project
-
Reports to the functional manager
-
Will not always have a "home"
Pregunta 93
Pregunta
A project manager is trying to complete a software development project, but cannot get enough attention for the project. Resources are focused on completing process related work, and the project manager has little authority to assign resources. What form of organization must the project manager be working in?
Respuesta
-
Functional
-
Matrix
-
Expediter
-
Coordinator
Pregunta 94
Pregunta
A project manager has very little project experience, but he has been assigned as the project manager of a new project. Because he will be working in a matrix organization to complete his project, he can expect communications to be:
Respuesta
-
Simple
-
Open and accurate
-
Complex
-
Hard to automate
Pregunta 95
Pregunta
A project team member is talking to another team member and complaining that many people are asking him to do things. If he works in a functional organization, who has the power to give direction to the team member?
Respuesta
-
The project manager
-
The functional manager
-
The team
-
The PMO
Pregunta 96
Pregunta
The previous project manager for your project managed it without much project organization. There is a lack of management control and no clearly defined project deliverables. Which of the following would be the BEST choice for getting your project better organized?
Respuesta
-
Adopt a life cycle approach to the project
-
Develop lessons learned for each phase
-
Develop specific work plans for each work package
-
Develop a description of the product of the project
Pregunta 97
Pregunta
The project life cycle differs from the project management process in that the project management process:
Respuesta
-
Is the same for every project
-
Does not incorporate a methodology
-
Is different for each industry
-
Can spawn many projects
Pregunta 98
Pregunta
Who has the MOST power in a projectized organization?
Respuesta
-
The project manager
-
The functional manager
-
The team
-
The all share power
Pregunta 99
Pregunta
Your management has decided that all orders will be treated as "projects" and that project managers will be used to update orders daily, to resolve issues, and to ensure the customer formally accepts the product within 30 days of completion. Revenue from the individual orders can vary from US $100 to US $150,000. The project manager will not be required to perform planning or provide documentation other than daily status. How would you define this situation?
Respuesta
-
Because each individual order is a "temporary endeavor", each order is a project
-
This is program management since there are multiple projects involved
-
This is a recurring process
-
Orders incurring revenue over $1000,000 would be considered projects and would involve project management
Pregunta 100
Pregunta
To obtain support for the project throughout the performing organization, it's BEST if the project manager:
Respuesta
-
Ensures there is a communications management plan
-
Correlates the need for the project to the organization's strategic plan
-
Connects the project to the personal objectives of the sponsor
-
Ensures that the management plan includes the management of team members