Pregunta 1

Pregunta
Q. 201: The inputs for developing a test plan are taken from
Respuesta
  • A. Project plan
  • B. Business plan
  • C. Support plan
  • D. None of the above

Pregunta 2

Pregunta
Q. 202: To test a function, the programmer has to write a ______, which calls the function and passes it the test data.
Respuesta
  • A. Stub
  • B. Driver
  • C. Proxy
  • D. None of the above

Pregunta 3

Pregunta
Q. 203: Which of the following is not a static testing technique
Respuesta
  • A. Error guessing
  • B. Walkthrough
  • C. Data flow analysis
  • D. Inspections

Pregunta 4

Pregunta
Q. 204: Which of the following statements about component testing is not true?
Respuesta
  • A. Component testing should be performed by development
  • B. Component testing is also know as isolation or module testing
  • C. Component testing should have completion criteria planned
  • D. Component testing does not involve regression testing

Pregunta 5

Pregunta
Q. 205: Inspections can find all the following except
Respuesta
  • A. Variables not defined in the code
  • B. Spelling and grammar faults in the documents
  • C. Requirements that have been omitted from the design documents
  • D. How much of the code has been covered

Pregunta 6

Pregunta
Q. 206: Which of the following is not a characteristic for Testability?
Respuesta
  • A. Operability
  • B. Observability
  • C. Simplicity
  • D. Robustness

Pregunta 7

Pregunta
Q. 207: Software testing accounts to what percent of software development costs?
Respuesta
  • A. 10-20
  • B. 40-50
  • C. 70-80
  • D. 5-10

Pregunta 8

Pregunta
Q. 208: Equivalence partitioning is:
Respuesta
  • A. A black box testing technique used only by developers
  • B. A black box testing technique than can only be used during system testing
  • C. A black box testing technique appropriate to all levels of testing
  • D. A white box testing technique appropriate for component testing

Pregunta 9

Pregunta
Q. 209: If an expected result is not specified then:
Respuesta
  • A. We cannot run the test
  • B. It may be difficult to repeat the test
  • C. It may be difficult to determine if the test has passed or failed
  • D. We cannot automate the user inputs

Pregunta 10

Pregunta
Q. 210: How much testing is enough
Respuesta
  • A. This question is impossible to answer
  • B. The answer depends on the risks for your industry, contract and special requirements
  • C. The answer depends on the maturity of your developers
  • D. The answer should be standardized for the software development industry

Pregunta 11

Pregunta
Q. 211: The purpose of requirement phase is
Respuesta
  • A. To freeze requirements
  • B. To understand user needs
  • C. To define the scope of testing
  • D. All of the above

Pregunta 12

Pregunta
Q. 212: Which of these can be successfully tested using Loop Testing methodology?
Respuesta
  • A. Simple Loops
  • B. Nested Loops
  • C. Concatenated Loops
  • D. All of the above

Pregunta 13

Pregunta
Q. 213: Cyclomatic Complexity method comes under which testing method.
Respuesta
  • A. White box
  • B. Black box
  • C. Green box
  • D. Yellow box

Pregunta 14

Pregunta
Q. 214: A reliable system will be one that:
Respuesta
  • A. Is unlikely to be completed on schedule
  • B. Is unlikely to cause a failure
  • C. Is likely to be fault-free
  • D. Is likely to be liked by the users

Pregunta 15

Pregunta
Q. 215: Which, in general, is the least required skill of a good tester?
Respuesta
  • A. Being diplomatic
  • B. Able to write software
  • C. Having good attention to detail
  • D. Able to be relied on

Pregunta 16

Pregunta
Q. 216: A regression test:
Respuesta
  • A. Will always be automated
  • B. Will help ensure unchanged areas of the software have not been affected
  • C. Will help ensure changed areas of the software have not been affected
  • D. Can only be run during user acceptance testing

Pregunta 17

Pregunta
Q. 217: Function/Test matrix is a type of
Respuesta
  • A. Interim Test report
  • B. Final test report
  • C. Project status report
  • D. Management report

Pregunta 18

Pregunta
Q. 218: The process starting with the terminal modules is called:
Respuesta
  • A. Top-down integration
  • B. Bottom-up integration
  • C. None of the above
  • D. Module integration

Pregunta 19

Pregunta
Q. 219: Verification is:
Respuesta
  • A. Checking that we are building the right system
  • B. Checking that we are building the system right
  • C. Performed by an independent test team
  • D. Making sure that it is what the user really wants

Pregunta 20

Pregunta
Q. 220: The difference between re-testing and regression testing is
Respuesta
  • A. Re-testing is running a test again; regression testing looks for unexpected side effects
  • B. Re-testing looks for unexpected side effects; regression testing is repeating those tests
  • C. Re-testing is done after faults are fixed; regression testing is done earlier
  • D. Re-testing uses different environments, regression testing uses the same environment
  • E. Re-testing is done by developers, regression testing is done by independent testers

Pregunta 21

Pregunta
Q. 221: Testing should be stopped when:
Respuesta
  • A. All the planned tests have been run
  • B. Time has run out
  • C. All faults have been fixed correctly
  • D. Both A. and C.
  • E. I depends on the risks for the system being tested

Pregunta 22

Pregunta
Q. 222: Which of the following is the main purpose of the integration strategy for integration testing in the small?
Respuesta
  • A. To ensure that all of the small modules are tested adequately
  • B. To ensure that the system interfaces to other systems and networks
  • C. To specify which modules to combine when and how many at once
  • D. To ensure that the integration testing can be performed by a small team
  • E. To specify how the software should be divided into modules

Pregunta 23

Pregunta
Q. 223: Which of the following is NOT part of configuration management:
Respuesta
  • A. Status accounting of configuration items
  • B. Auditing conformance to ISO9001
  • C. Identification of test versions
  • D. Record of changes to documentation over time
  • E. controlled library access

Pregunta 24

Pregunta
Q. 224:Regression testing should be performed: v) Every week w) After the software has changed x) As often as possible y) When the environment has changed z) Wwhen the project manager says
Respuesta
  • A. v & w are true, x – z are false
  • B. w, x & y are true, v & z are false
  • C. w & y are true, v, x & z are false
  • D. w is true, v, x y and z are false
  • E. All of the above are true

Pregunta 25

Pregunta
Q. 225: A tool that supports traceability, recording of incidents or scheduling of tests is called:
Respuesta
  • A. A dynamic analysis tool
  • B. A test execution tool
  • C. A debugging tool
  • D. A test management tool
  • E. A configuration management tool

Pregunta 26

Pregunta
Q. 226: The cost of fixing a fault:
Respuesta
  • A. Is not important
  • B. Increases as we move the product towards live use
  • C. Decreases as we move the product towards live use
  • D. Is more expensive if found in requirements than functional design
  • E. Can never be determined

Pregunta 27

Pregunta
Q. 227: Order numbers on a stock control system can range between 10000 and 99999 inclusive. Which of the following inputs might be a result of designing tests for only valid equivalence classes and valid boundaries:
Respuesta
  • A. 1000, 5000, 99999
  • B. 9999, 50000, 100000
  • C. 10000, 50000, 99999
  • D. 10000, 99999
  • E. 9999, 10000, 50000, 99999, 10000

Pregunta 28

Pregunta
Q. 228: When what is visible to end-users is a deviation from the specific or expected behavior, this is called:
Respuesta
  • A. An error
  • B. A fault
  • C. A failure
  • D. A defect
  • E. A mistake

Pregunta 29

Pregunta
Q. 229: Which expression best matches the following characteristics or review processes: 1. Led by author 2. Undocumented 3. No management participation 4. Led by a trained moderator or leader 5. Uses entry exit criteria s) Inspection t) Peer review u) Informal review v) Walkthrough
Respuesta
  • A. s = 4, t = 3, u = 2 and 5, v = 1
  • B. s = 4 and 5, t = 3, u = 2, v = 1
  • C. s = 1 and 5, t = 3, u = 2, v = 4
  • D. s = 5, t = 4, u = 3, v = 1 and 2
  • E. s = 4 and 5, t = 1, u = 2, v = 3

Pregunta 30

Pregunta
Q. 230: Given the following: Switch PC on Start "outlook" IF outlook appears THEN Send an email Close outlook
Respuesta
  • A. 1 test for statement coverage, 1 for branch coverage
  • B. 1 test for statement coverage, 2 for branch coverage
  • C. 1 test for statement coverage. 3 for branch coverage
  • D. 2 tests for statement coverage, 2 for branch coverage
  • E. 2 tests for statement coverage, 3 for branch coverage

Pregunta 31

Pregunta
Q. 231: Test managers should not:
Respuesta
  • A. Report on deviations from the project plan
  • B. Sign the system off for release
  • C. Re-allocate resource to meet original plans
  • D. Rise incidents on faults that they have found
  • E. Provide information for risk analysis and quality improvement

Pregunta 32

Pregunta
Q. 232: Which of the following is NOT part of system testing:
Respuesta
  • A. Business process-based testing
  • B. Performance, load and stress testing
  • C. Requirements-based testing
  • D. Usability testing
  • E. Top-down integration testing

Pregunta 33

Pregunta
Q. 233: When a new testing tool is purchased, it should be used first by:
Respuesta
  • A. A small team to establish the best way to use the tool
  • B. Everyone who may eventually have some use for the tool
  • C. The independent testing team
  • D. The managers to see what projects it should be used in
  • E. The vendor contractor to write the initial scripts

Pregunta 34

Pregunta
Q. 234: Which of the following is not part of performance testing:
Respuesta
  • A. Measuring response time
  • B. Measuring transaction rates
  • C. Recovery testing
  • D. Simulating many users
  • E. Generating many transactions

Pregunta 35

Pregunta
Q. 235: What is the purpose of test completion criteria in a test plan:
Respuesta
  • A. To know when a specific test has finished its execution
  • B. To ensure that the test case specification is complete
  • C. To set the criteria used in generating test inputs
  • D. To know when test planning is complete
  • E. To plan when to stop testing

Pregunta 36

Pregunta
Q. 236: Given the following code, which is true: IF A > B THEN C = A – B ELSE C = A + B ENDIF Read D IF C = D Then Print "Error" ENDIF
Respuesta
  • A. 1 test for statement coverage, 3 for branch coverage
  • B. 2 tests for statement coverage, 2 for branch coverage
  • C. 2 tests for statement coverage. 3 for branch coverage
  • D. 3 tests for statement coverage, 3 for branch coverage
  • E. 3 tests for statement coverage, 2 for branch coverage

Pregunta 37

Pregunta
Q. 237: Unreachable code would best be found using:
Respuesta
  • A. Code reviews
  • B. Code inspections
  • C. A coverage tool
  • D. A test management tool
  • E. A static analysis tool

Pregunta 38

Pregunta
Q. 238: What information need not be included in a test incident report:
Respuesta
  • A. How to fix the fault
  • B. How to reproduce the fault
  • C. Test environment details
  • D. Severity, priority
  • E. The actual and expected outcomes

Pregunta 39

Pregunta
Q. 239: Which of the following is NOT included in the Test Plan document of the Test Documentation Standard:
Respuesta
  • A. Test items (i.e. software versions)
  • B. What is not to be tested
  • C. Test environments
  • D. Quality plans
  • E. Schedules and deadlines

Pregunta 40

Pregunta
Q. 240: IEEE 829 test plan documentation standard contains all of the following except:
Respuesta
  • A. Test items
  • B. Test deliverables
  • C. Test tasks
  • D. Test environment
  • E. Test specification

Pregunta 41

Pregunta
Q. 251: Which of the following is NOT a black box technique:
Respuesta
  • A. Equivalence partitioning
  • B. State transition testing
  • C. LCSAJ
  • D. Syntax testing
  • E. Boundary value analysis

Pregunta 42

Pregunta
Q. 252: Expected results are:
Respuesta
  • A. Only important in system testing
  • B. Only used in component testing
  • C. Never specified in advance
  • D. Most useful when specified in advance
  • E. Derived from the code

Pregunta 43

Pregunta
Q. 253: Beta testing is:
Respuesta
  • A. Performed by customers at their own site
  • B. Performed by customers at their software developer’s site
  • C. Performed by an independent test team
  • D. Useful to test bespoke software

Pregunta 44

Pregunta
Q. 254: Consider the following: Pick up and read the newspaper Look at what is on television If there is a program that you are interested in watching then switch the the television on and watch the program Otherwise Continue reading the newspaper If there is a crossword in the newspaper then try and complete the crossword
Respuesta
  • A. SC = 1 and DC = 1
  • B. SC = 1 and DC = 2
  • C. SC = 1 and DC = 3
  • D. SC = 2 and DC = 2
  • E. SC = 2 and DC = 3

Pregunta 45

Pregunta
Q. 255: A typical commercial test execution tool would be able to perform all of the following EXCEPT:
Respuesta
  • A. Generating expected outputs
  • B. Replaying inputs according to a programmed script
  • C. Comparison of expected outcomes with actual outcomes
  • D. Recording test inputs
  • E. Reading test values from a data file

Pregunta 46

Pregunta
Q. 256: Consider the following statements about early test design: i. Early test design can prevent fault multiplication ii. Faults found during early test design are more expensive to fix iii. Early test design can find faults iv. Early test design can cause changes to the requirements v. Early test design takes more effort
Respuesta
  • A. i, iii & iv are true. Ii & v are false
  • B. iii is true, I, ii, iv & v are false
  • C. iii & iv are true. i, ii & v are false
  • D. i, iii, iv & v are true, ii us false
  • E. i & iii are true, ii, iv & v are false

Pregunta 47

Pregunta
Q. 257: Given the following code, which is true about the minimum number of test cases required for full statement and branch coverage: Read P Read Q IF P+Q > 100 THEN Print "Large" ENDIF If P > 50 THEN Print "P Large" ENDIF
Respuesta
  • A. 1 test for statement coverage, 3 for branch coverage
  • B. 1 test for statement coverage, 2 for branch coverage
  • C. 1 test for statement coverage, 1 for branch coverage
  • D. 2 tests for statement coverage, 3 for branch coverage
  • E. 2 tests for statement coverage, 2 for branch coverage

Pregunta 48

Pregunta
Q. 258: The place to start if you want a (new) test tool is:
Respuesta
  • A. Attend a tool exhibition
  • B. Invite a vendor to give a demo
  • C. Analyse your needs and requirements
  • D. Find out what your budget would be for the tool
  • E. Search the internet

Pregunta 49

Pregunta
Q. 259: Error guessing is best used
Respuesta
  • A. As the first approach to deriving test cases
  • B. After more formal techniques have been applied
  • C. By inexperienced testers
  • D. After the system has gone live
  • E. Only by end users

Pregunta 50

Pregunta
Q. 260: Exit Criteria may consist of: i. Thoroughness measures, such as coverage of code, functionality or risk ii. Estimates of Defect density or reliability measures. iii. Residual risk such as defects not fixed or lack of test coverage in certain areas iv. Verifying the Test Environment.
Respuesta
  • A. iv is correct and i,ii,iii are incorrect.
  • B. i,ii,iii is correct and iv is incorrect
  • C. ii is correct and i,ii,iii are incorrect
  • D. iii and iv are correct and i,ii are incorrect

Pregunta 51

Pregunta
Q. 261: One of the fields on a form contains a text box, which accepts alphabets in lower or upper case. Identify the invalid Equivalance class value.
Respuesta
  • A. CLASS
  • B. cLASS
  • C. CLass
  • D. CLa01ss

Pregunta 52

Pregunta
Q. 262: The Kick Off phase of a formal review includes the following:
Respuesta
  • A. Explaining the objective
  • B. Fixing defects found typically done by author
  • C. Follow up
  • D. Individual Meeting preparations

Pregunta 53

Pregunta
Q. 263: Peer Reviews are also called as :
Respuesta
  • A. Inspection
  • B. Walkthrough
  • C. Technical Review
  • D. Formal Review

Pregunta 54

Pregunta
Q. 264: Validation involves which of the following i. Helps to check the Quality of the Built Product ii. Helps to check that we have built the right product. iii. Helps in developing the product iv. Monitoring tool wastage and obsoleteness.
Respuesta
  • A. Options i,ii,iii,iv are true.
  • B. ii is true and i,iii,iv are false
  • C. i,ii,iii are true and iv is false
  • D. iii is true and i,ii,iv are false.

Pregunta 55

Pregunta
Q. 265: Success Factors for a review include: i. Each Review does not have a predefined objective ii. Defects found are welcomed and expressed objectively iii. Management supports a good review process. iv. There is an emphasis on learning and process improvement.
Respuesta
  • A. ii,iii,iv are correct and i is incorrect
  • B. iii , i , iv is correct and ii is incorrect
  • C. i , iii , iv , ii is in correct
  • D. ii is correct

Pregunta 56

Pregunta
Q. 266: Which of the following helps in monitoring the Test Progress: i. Percentage of Test Case Execution ii. Percentage of work done in test environment preparation. iii. Defect Information e.g. defect density, defects found and fixed iv. The size of the testing Team and skills of the engineers
Respuesta
  • A. iv is correct and i,ii,iii are incorrect
  • B. i,ii,iii are correct and iv is incorrect
  • C. i,ii are correct and iii,iv are incorrect
  • D. i,iv are correct and ii , iii are incorrect

Pregunta 57

Pregunta
Q. 267: Defects discovered by static analysis tools include: i. Variables that are never used. ii. Security vulnerabilities. iii. Programming Standard Violations iv. Uncalled functions and procedures
Respuesta
  • A. i , ii,iii,iv is correct
  • B. iii ,is correct I,ii,iv are incorrect.
  • C. i ,ii, iii and iv are incorrect
  • D. iv, ii is correct

Pregunta 58

Pregunta
Q. 268: Which of the following is true about White and Black Box Testing Technique:-
Respuesta
  • A. Equivalence partitioning, Decision Table and Control flow are White box Testing Techniques.
  • B. Equivalence partitioning, Boundary Value Analysis , Data Flow are Black Box Testing Techniques.
  • C. Equivalence partitioning , State Transition , Use Case Testing are black box Testing Techniques.
  • D. Equivalence Partitioning, State Transition, Use Case Testing and Decision Table are White Box Testing Techniques.

Pregunta 59

Pregunta
Q. 269: Which of the following techniques is NOT a black box technique?
Respuesta
  • A. State transition testing
  • B. LCSAJ (Linear Code Sequence and Jump)
  • C. Syntax testing
  • D. Boundary value analysis

Pregunta 60

Pregunta
Q. 270: Features of White Box Testing Technique: i. We use explicit knowledge of the internal workings of the item being tested to select the test data. ii. Uses specific knowledge of programming code to examine outputs and assumes that the tester knows the path of logic in a unit or a program. iii. Checking for the performance of the application iv. Also checks for functionality.
Respuesta
  • A. i, ii are true and iii and iv are false
  • B. iii is true and i,ii, iv are false
  • C. ii ,iii is true and i,iv is false
  • D. iii and iv are true and i,ii are false

Pregunta 61

Pregunta
Q. 271. The Provision and Management of a controlled library containing all the configurations items is called as
Respuesta
  • A. Configuration Control
  • B. Status Accounting
  • C. Configuration Identification
  • D. Configuration Identification

Pregunta 62

Pregunta
Q. 272: The selection of a test approach should consider the context: i. Risk of Failure of the Project, hazards to the product and risks of product failure to humans ii. Skills and experience of the people in the proposed technique, tools and methods iii. The objective of the testing endeavor and the mission of the testing team. iv. The size of the testing Team
Respuesta
  • A. i,ii,iii,iv are true
  • B. i,ii,iii are true and iv is false.
  • C. ii,iii,iv are true and i is false.
  • D. i,iv are true and ii, iii are false.

Pregunta 63

Pregunta
Q. 273: Benefits of Independent Testing
Respuesta
  • A. Independent testers are much more qualified than Developers
  • B. Independent testers see other and different defects and are unbiased.
  • C. Independent Testers cannot identify defects.
  • D. Independent Testers can test better than developers

Pregunta 64

Pregunta
Q. 274: Minimum Test Required for Statement Coverage: Disc = 0 Order-qty = 0 Read Order-qty If Order-qty >=20 then Disc = 0.05 If Order-qty >=100 then Disc =0.1 End if End if
Respuesta
  • A. Statement coverage is 4
  • B. Statement coverage is 1
  • C. Statement coverage is 3
  • D. Statement Coverage is 2

Pregunta 65

Pregunta
Q. 275: Test Conditions are derived from:
Respuesta
  • A. Specifications
  • B. Test Cases
  • C. Test Data
  • D. Test Design

Pregunta 66

Pregunta
Q. 276: Which of the following is the task of a Test Lead / Leader. i. Interaction with the Test Tool Vendor to identify best ways to leverage test tool on the project. ii. Write Test Summary Reports based on the information gathered during testing iii. Decide what should be automated , to what degree and how. iv. Create the Test Specifications
Respuesta
  • A. i, ii, iii is true and iv is false
  • B. ii,iii,iv is true and i is false
  • C. i is true and ii,iii,iv are false
  • D. iii and iv is correct and i and ii are incorrect

Pregunta 67

Pregunta
Q. 277: Impact Analysis helps to decide:
Respuesta
  • A. How much regression testing should be done.
  • B. Exit Criteria
  • C. How many more test cases need to written.
  • D. Different Tools to perform Regression Testing

Pregunta 68

Pregunta
Q. 278: Drivers are also known as: i. Spade ii. Test harness iii. Scaffolding
Respuesta
  • A. i , ii are true and iii is false
  • B. i , iii are true and ii is false
  • C. ii , iii are true and i is false
  • D. All of the above are true

Pregunta 69

Pregunta
Q. 279: Which of the following is not a type of incremental testing approach?
Respuesta
  • A. Top down
  • B. Big-bang
  • C. Bottom up
  • D. Functional incrementation.

Pregunta 70

Pregunta
Q. 280: In a system designed to work out the tax to be paid: An employee has £4000 of salary tax free. The next £1500 is taxed at 10% The next £28000 is taxed at 22% Any further amount is taxed at 40% Which of these groups of numbers would fall into the same equivalence class?
Respuesta
  • A. £4800; £14000; £28000
  • B. £5200; £5500; £28000
  • C. £28001; £32000; £35000
  • D. £5800; £28000; £32000

Pregunta 71

Pregunta
Q. 281: In case of Large Systems :
Respuesta
  • A. Only few tests should be run
  • B. Testing should be on the basis of Risk
  • C. Only Good Test Cases should be executed.
  • D. Test Cases written by good test engineers should be executed.

Pregunta 72

Pregunta
Q. 282: What is the expected result for each of the following test cases? A. Citibank card member, holding a Silver room B. Non Citibank-member, holding a Platinum room
Respuesta
  • A. A – Don’t offer any upgrade, B – Don’t offer any upgrade.
  • B. A – Don’t offer any upgrade, B – Offer upgrade to Gold.
  • C. A – Offer upgrade to Silver, B – Offer upgrade to Silver.
  • D. A – Offer upgrade to Gold, B – Don’t offer any upgrade.

Pregunta 73

Pregunta
Q. 283: Which of the following is not phase of the Fundamental Test Process?
Respuesta
  • A. Test Planning and Control
  • B. Test implementation and Execution
  • C. Requirement Analysis
  • D. Evaluating Exit criteria and reporting

Pregunta 74

Pregunta
Q. 284: The structure of an incident report is covered in the Standard for Software Test Documentation IEEE 829 and is called as:
Respuesta
  • A. Anomaly Report
  • B. Defect Report
  • C. Test Defect Report
  • D. Test Incident Report

Pregunta 75

Pregunta
Q. 285: Repeated Testing of an already tested program, after modification, to discover any defects introduced or uncovered as a result of the changes in the software being tested or in another related or unrelated software component:
Respuesta
  • A. Re Testing
  • B. Confirmation Testing
  • C. Regression Testing
  • D. Negative Testing

Pregunta 76

Pregunta
Q. 286: Consider the following state transition diagram of a switch. Which of the following represents an invalid state transition?
Respuesta
  • A. OFF to ON
  • B. ON to OFF
  • C. FAULT to ON

Pregunta 77

Pregunta
Q. 287: We use the output of the requirement analysis, the requirement specification as the input for writing:
Respuesta
  • A. User Acceptance Test Cases
  • B. Integration Level Test Cases
  • C. Unit Level Test Cases
  • D. Program specifications

Pregunta 78

Pregunta
Q. 288: Regression testing should be performed: i. Every week ii. After the software has changed iii. As often as possible iv. When the environment has changed v. When the project manager says
Respuesta
  • A. i & ii are true, iii, iv & v are false
  • B. ii, iii & iv are true, i & v are false
  • C. ii & iv are true, i, iii & v are false
  • D. ii is true, i, iii, iv & v are false

Pregunta 79

Pregunta
Q. 289: Evaluating testability of the requirements and system are a part of which phase:-
Respuesta
  • A. Test Analysis and Design
  • B. Test Planning and control
  • C. Test Implementation and execution
  • D. Evaluating exit criteria and reporting

Pregunta 80

Pregunta
Q. 290: Which of the following has highest level of independence in which test cases are:
Respuesta
  • A. Designed by persons who write the software under test
  • B. Designed by a person from a different section
  • C. Designed by a person from a different organization
  • D. Designed by another person

Pregunta 81

Pregunta
Q. 291: Test planning has which of the following major tasks? i. Determining the scope and risks, and identifying the objectives of testing. ii. Determining the test approach (techniques,test items, coverage, identifying and interfacing the teams involved in testing , testware) iii. Reviewing the Test Basis (such as requirements,architecture,design,interface) iv. Determining the exit criteria.
Respuesta
  • A. i,ii,iv are true and iii is false
  • B. i,,iv are true and ii is false
  • C. i,ii are true and iii,iv are false
  • D. ii,iii,iv are true and i is false

Pregunta 82

Pregunta
Q. 292: Deciding How much testing is enough should take into account :- i. Level of Risk including Technical and Business product and project risk ii. Project constraints such as time and budget iii. Size of Testing Team iv. Size of the Development Team
Respuesta
  • A. i,ii,iii are true and iv is false
  • B. i,,iv are true and ii is false
  • C. i,ii are true and iii,iv are false
  • D. ii,iii,iv are true and i is false

Pregunta 83

Pregunta
Q. 293: Which of the following will be the best definition for Testing:
Respuesta
  • A. The goal / purpose of testing is to demonstrate that the program works.
  • B. The purpose of testing is to demonstrate that the program is defect free.
  • C. The purpose of testing is to demonstrate that the program does what it is supposed to do.
  • D. Testing is executing Software for the purpose of finding defects.

Pregunta 84

Pregunta
Q. 294: Minimum Tests Required for Statement Coverage and Branch Coverage: Read P Read Q If p+q > 100 then Print "Large" End if If p > 50 then Print "pLarge" End if
Respuesta
  • A. Statement coverage is 2, Branch Coverage is 2
  • B. Statement coverage is 3 and branch coverage is 2
  • C. Statement coverage is 1 and branch coverage is 2
  • D. Statement Coverage is 4 and Branch coverage is 2

Pregunta 85

Pregunta
Q. 295: Match every stage of the software Development Life cycle with the Testing Life cycle: i. Hi-level design a Unit tests ii. Code b Acceptance tests iii. Low-level design c System tests iv. Business requirements d Integration tests
Respuesta
  • A. i-d , ii-a , iii-c , iv-b
  • B. i-c , ii-d , iii-a , iv-b
  • C. i-b , ii-a , iii-d , iv-c
  • D. i-c , ii-a , iii-d , iv-b

Pregunta 86

Pregunta
Q. 296: Which of the following is a part of Test Closure Activities? i. Checking which planned deliverables have been delivered ii. Defect report analysis. iii. Finalizing and archiving testware. iv. Analyzing lessons.
Respuesta
  • A. i , ii , iv are true and iii is false
  • B. i , ii , iii are true and iv is false
  • C. i , iii , iv are true and ii is false
  • D. All of above are true

Pregunta 87

Pregunta
Q. 297: Which of the following is NOT part of a high level test plan?
Respuesta
  • A. Functions not to be tested.
  • B. Environmental requirements.
  • C. Analysis of Specifications.
  • D. Entry and Exit criteria.

Pregunta 88

Pregunta
Q. 298: If a candidate is given an exam of 40 questions, should get 25 marks to pass (61%) and should get 80% for distinction, what is equivalence class.
Respuesta
  • A. 23, 24, 25
  • B. 0, 12, 25
  • C. 30, 36, 39
  • D. 32,37,40

Pregunta 89

Pregunta
Q. 299: Which of the following statements is true of static analysis:
Respuesta
  • A. Compiling code is not a form of static analysis.
  • B. Static analysis need not be performed before imperative code is executed.
  • C. Static analysis can find faults that are hard to find with dynamic testing.
  • D. Extensive statistic analysis will not be needed if white- Box testing is to be performed.

Pregunta 90

Pregunta
Q. 300: In a system designed to work out the tax to be paid: An employee has $4000 of salary tax free. The next $1500 is taxed at 10% The next $28000 is taxed at 22% Any further amount is taxed at 40% Which of these groups of numbers would fall into the same equivalence class?
Respuesta
  • A. $5800; $28000; $32000
  • B. $0; $200; $4200
  • C. $5200; $5500; $28000
  • D. $28001; $32000; $35000

Pregunta 91

Pregunta
Q. 301: Cost of the reviews will not include.
Respuesta
  • A. Review process itself
  • B. Metrics analysis
  • C. Tool support.
  • D. Process improvement.

Pregunta 92

Pregunta
Q. 302: Regression testing always involves
Respuesta
  • A. Testing whether a known software fault been fixed.
  • B. Executing a large number of different tests.
  • C. Testing whether modifications have introduced adverse side effects.
  • D. Using a test automation tool.

Pregunta 93

Pregunta
Q. 303: Capture and replay facilities are least likely to be used to _______
Respuesta
  • A. Performance testing
  • B. Recovery testing
  • C. GUI testing
  • D. User requirements.

Pregunta 94

Pregunta
Q. 304: Which tool will be used to test the flag memory leaks and unassigned pointers
Respuesta
  • A. Dynamic analysis tool
  • B. Static Analysis tool.
  • C. Maintenance tool.
  • D. Configuration tool.

Pregunta 95

Pregunta
Q. 305: Cyclomatic complexity is used to calculate
Respuesta
  • A. Number of independent paths in the basis set of a program
  • B. Number of binary decisions + 1
  • C. Number bound for the number of tests that must be conducted to ensure that all statements have been executed at least once
  • D. Number of branches and decisions

Pregunta 96

Pregunta
Q. 306: Which of the following is not included in Test Plan.
Respuesta
  • A. Features to be tested.
  • B. Environmental needs.
  • C. Suspension criteria.
  • D. Expected results.

Pregunta 97

Pregunta
Q. 307: Software quality is not relevant to _______
Respuesta
  • A. Correctness
  • B. Usability
  • C. Viability
  • D. Reusability.

Pregunta 98

Pregunta
Q. 308: Match the following: 1. Test estimation 2. Test control 3. Test monitoring a. Measures of tracking process b. Effort required to perform activities c. Reallocation of resources
Respuesta
  • A. 1-b, 2-c, 3-a
  • B. 1-b, 2-a, 3-c
  • C. 1-c, 2-a, 3-b
  • D. 1-a, 2-b, 3-c

Pregunta 99

Pregunta
Q. 309: When do you stop testing?
Respuesta
  • A. When the specified number of faults are found.
  • B. When the test completion criteria are met.
  • C. When all high and medium priority tests are complete.
  • D. When all statements have been executed

Pregunta 100

Pregunta
Q. 310: What is the smallest number of test cases required to Provide 100% branch coverage? If(x>y) x=x+1; else y=y+1; while(x>y) { y=x*y; x=x+1; }
Respuesta
  • A. 1
  • B. 2
  • C. 3
  • D. 4

Pregunta 101

Pregunta
Q. 311: Match the following. 1. Configuration identification 2. Configuration control 3. Status reporting 4. Configuration auditing a. Maintains of CI’s in a library b. Checks on the contents of the library c. Function recording and tracking problems. d. Requires the all CI’s and their versions in the system are known
Respuesta
  • A. 1-d, 2-c, 3-d, 4-a.
  • B. 1-d, 2-a, 3-c, 4-b.
  • C. 1-a, 2-b, 3-d, 4-c.
  • D. 1-c, 2-b, 3-a, 4-d.

Pregunta 102

Pregunta
Q. 312: Integration testing in the large involves:
Respuesta
  • A. Testing the system when combined with other systems.
  • B. Testing a sub-system using stubs and drivers.
  • C. Testing a system with a large number of users.
  • D. Combing software components and testing them in one go.

Pregunta 103

Pregunta
Q. 313: One of the following is not a part of white box testing as per BS7925-II standards.
Respuesta
  • A. Random testing
  • B. Data Flow testing.
  • C. Statement testing.
  • D. Syntax testing.

Pregunta 104

Pregunta
Q. 314: A piece of software has been given _______what tests in the Following will you perform? 1) Test the areas most critical to business processes 2) Test the areas where faults will be maximum 3) Test the easiest functionalities
Respuesta
  • A. 1&2 are true and 3 is false.
  • B. 1,2&3 are true.
  • C. 1 is true, 2&3 are false.
  • D. 1&2 are false, 3 is true
Mostrar resumen completo Ocultar resumen completo

Similar

ISTQB Foundation Level - 500 questions
milopz
ITIL Paper 7 Recomendado
jamh1983
Acuerdo 8 Comité Directivo del Sistema Nacional de Bachillerato
Clases En Web
Todos mis RECURSOS...
Ulises Yo
HISTORIA de ESPAÑA
Ulises Yo
Test de Inglés para la Prepa Abierta 3
Raúl Fox
Test sobre la Organización del Estado de Los Reyes Católicos
maya velasquez
RECURSOS para PRIMARIA...
Ulises Yo
Test de Nombres de Alimentos en Inglés
maya velasquez
NÚMEROS ROMANOS
JL Cadenas
PASAPALABRA  sobre  ANATOMÍA
JL Cadenas