Pregunta 1
Pregunta
Which technical orders (TO) are prepared in limited quantities to test and verify certain procedures developed with the first test or early production models of some missiles, aircraft, or ground support equipment?
Respuesta
-
Interim technical orders
-
Preliminary technical orders
-
Time compliance technical orders
-
Test and evaluation technical orders
Pregunta 2
Pregunta
Which kind of time compliance technical order (TCTO) will be issued if a condition exists which if left uncorrected, could result in fatal or serious injury to personnel or extensive damage or destruction to property?
Respuesta
-
Immediate
-
Routine
-
Priority
-
Urgent
Pregunta 3
Pregunta
In which publication would you find information or the change or revision status of a technical order?
Respuesta
-
Records time compliance TO
-
Technical order update listing register
-
Technical order card catalog
-
Index technical order
Pregunta 4
Pregunta
Which technical orders are primarily work simplification devices to help personnel carry out instructions contained in other type of technical orders?
Pregunta 5
Pregunta
In TO 1F-16C-33-1-2, the designator "1F" identifies the:
Pregunta 6
Pregunta
Which publication list major technical order indexes by category?
Pregunta 7
Pregunta
How are changed pages in printed technical orders identified?
Respuesta
-
By change numbers printed at the top of each page
-
In the index only, they are individually identified
-
By black hordes around the outside of the changed page
-
A heavy black line in the outer margin of the page next to the line containing the changed text
Pregunta 8
Pregunta
Which publication is issued for a technical order that contains material that is not part of the normal sequence outlined in the table of content?
Respuesta
-
Change
-
Appendix
-
Revision
-
Supplement
Pregunta 9
Pregunta
Which term identifies completely new editions of a publication that bear a new publication date?
Respuesta
-
Change
-
Appendix
-
Revision
-
Supplement
Pregunta 10
Pregunta
Which technical order deficiency report identifies a deficiency that affects safety and the unit mission?
Respuesta
-
Emergency
-
Immediate
-
Routine
-
Urgent
Pregunta 11
Pregunta
Which TO deficiency report identifies recommended TO improvements, which if not made, will create potentially hazardous conditions through continued use and will have a negative effect on operation, maintenance efficiency, or on the operating life or general service use of the equipment?
Respuesta
-
Emergency
-
Immediate
-
Routine
-
Urgent
Pregunta 12
Pregunta
How does the user typically generate a technical order change request to change an integrated electronic manual?
Respuesta
-
By initiating an AFTO Form 22
-
Through the integrated maintenance data system desktop
-
Through the integrated maintenance information system desktop
-
through the technical order data change request (TODCR) application located in the JCAALS system
Pregunta 13
Pregunta
How many TCTOs are there?
Pregunta 14
Pregunta
Which of the following TCTOs are issued because conditions could result in injury to personnel, damage to valuable property or unacceptable reductions in combat efficiency.
Respuesta
-
Immediate action
-
Emergency action
-
Routine action
-
Urgent action
Pregunta 15
Pregunta
This type of TO is in the form of a tape or a card.
Respuesta
-
TCTO
-
Abbreviated
-
Index
-
Automated
Pregunta 16
Pregunta
Where do you access an Interactive Electronic Technical Manual?
Respuesta
-
IMIS desktop
-
IMDS desktop
Pregunta 17
Pregunta
In the TO 1F-16C-2-94JG-30-1, what does the third group identify?
Pregunta 18
Pregunta
In the TO 1F-16C-2-94JG-30-1, what does the fourth group identify?
Pregunta 19
Pregunta
In the TO 1F-16C-2-94JG-30-1, what does the second group identify?
Respuesta
-
Category
-
Supplemental manual
-
Aircraft model number
-
Type of TO
Pregunta 20
Pregunta
Changes to a TO are issued when only part of the existing TO is affected and a new title page is issued with each supplement.
Pregunta 21
Pregunta
This type of TO are issued as separate publications incorporating augmented or revised data.
Respuesta
-
Change
-
Augment
-
Supplement
-
Revision
Pregunta 22
Pregunta
How many deficiency reports are there?
Pregunta 23
Pregunta
This type of deficiency report recommend non-emergency correction to TO deficiency involving hazardous conditions. If not corrected, the deficiency can result in injury to people, damage to equipment or property, or reduce operating efficiency.
Respuesta
-
Emergency report
-
Routine report
-
Immediate report
-
Urgent report