What constitutes the largest use of energy in buildings in the United States?
Respuesta
-
Space cooling
-
Space heating
-
Electric lighting
-
Water heating
Pregunta 2
Pregunta
Green building emphasizes using what type of design process?
Respuesta
-
Linear
-
Multistage
-
Integrative
-
Tiered
Pregunta 3
Pregunta
What are the three dimensions of sustainability often described as the triple bottom line or the three-legged stool?
Respuesta
-
Economic prosperity, environmental stewardship, and social responsibility
-
Economic theory, cultural agendas, and global variety
-
Energy efficiency, water efficiency, and indoor environmental quality
-
Government standards, building codes, and building practices
Pregunta 4
Pregunta
Life-cycle assessment is used to determine the ___?
Respuesta
-
Balance of natural cycles such as the hydrologic cycle
-
Environmental aspects and potential impacts of a given product
-
Life span of a building and its components
-
Environmental systems affected over the life of a building
Pregunta 5
Pregunta
When is the best time to incorporate an integrative approach for a building project
Respuesta
-
Predesign
-
Schematic design
-
Design development
-
Construction documents
-
Construction
Pregunta 6
Pregunta
Credit weightings are based on ___?
Respuesta
-
Relative costs and benefits of each credit
-
Environmental impacts and human benefits
-
Carbon footprint and embodied energy
-
Expected environmental performance
Pregunta 7
Pregunta
Implementation of green building strategies such as daylighting, passive cooling, high-efficiency mechanical systems,
and stack ventilation contributes to what type of cost savings?
Pregunta 8
Pregunta
The installation of low-flow faucet aerators at hand washing stations will result in which of the following? (Choose two)
Respuesta
-
Reduced hours of occupancy
-
Reduced energy use
-
Reduced water use
-
Increased occupant productivity
-
Reduced stormwater runoff
Pregunta 9
Pregunta
How many levels of LEED Professional Accreditation are available?
Pregunta 10
Pregunta
Which of the following is a primary responsibility of the U.S. Green Building Council?
Respuesta
-
Developing the LEED Professional Accreditation exams
-
Administering LEED project reviews and certification processes
-
Establishing continuing education requirements for LEED Accredited Professionals
-
Providing and developing LEED-based education and research programs
Pregunta 11
Pregunta
A development company is designing a seven-story, 100,000-square-foot condominium building. The developers will be
responsible for completing the interior finishes, but will not be supplying furniture or appliances. What LEED rating
system would be most relevant for this project type?
Respuesta
-
LEED for New Construction and Major Renovation
-
LEED for Homes
-
LEED for Commercial Interiors
-
LEED for Core & Shell
Pregunta 12
Pregunta
The carbon overlay in LEED is used for what purpose?
Respuesta
-
To prioritize the relative impact of credits on greenhouse gas emissions
-
To identify the major contributors to environmental degradation
-
To quantify the relative impact of different energy efficiency measures
-
To rank the feasibility of various green building strategies
Pregunta 13
Pregunta
What is the procedure required to achieve LEED certification?
Respuesta
-
Register a project with GBCI, pay applicable review fees, and submit documentation
-
Retain a LEED professional, register the project, and pay applicable fees
-
Submit documentation, obtain a preliminary rating, and pay applicable certification fees.
-
Register the project with GBCI, demonstrate environmental innovation, and pay applicable fees.
Pregunta 14
Pregunta
What is the earliest point at which a LEED for Schools project can be certified?
Respuesta
-
After one year of occupancy and after all commissioning activities are complete
-
After the project team has registered and submitted all project specifications
-
After final punch-list items are complete and all review fees are paid
-
After building completion and once all submittals and clarifications are reviewed
Pregunta 15
Pregunta
The licensed-professional exemption is used by a project team to do what?
Respuesta
-
Achieve continuing education credit for primary team members.
-
Capture federally available tax credits for the project.
-
Bypass otherwise required submittals.
-
Streamline the permitting process in many jurisdictions.
Pregunta 16
Pregunta
A team is unclear whether a proposed project strategy will achieve a specific LEED credit the team is pursuing. The
team decides it should submit a Credit Interpretation Request (CIR). Prior to submitting the CIR for review, which
strategies should the project team consider (select three)?
Respuesta
-
Review the credit intent and self evaluate whether the strategy meets that intent.
-
Contact LEED customer service to determine whether the CIR is likely to be successful.
-
Review past CIRs to see whether this issue has been addressed in the past.
-
Consult the appropriate LEED reference guide for a more detailed explanation.
-
Contact its local chapter to receive a preliminary ruling.
-
Identify other issues to address within the CIR.
Pregunta 17
Pregunta
What metric is the best indicator of transportation impacts associated with a building project?
Pregunta 18
Pregunta
Decreasing impervious surfaces on a project site will ___?
Pregunta 19
Pregunta
What is acknowledged as one of the greatest threats to surface-water quality?
Pregunta 20
Pregunta
A project that specifies exterior surfaces with high solar reflectance index (SRI) values is contributing to which
environmental benefit?
Respuesta
-
Reduced heat island effect
-
Support for renewable energy
-
Protection of the dark-sky initiative
-
Improved stormwater quality
Pregunta 21
Pregunta
A project is in the pre-design phase and the site has already been selected. The team wants to increase the open space
on the project site. Which strategies should it consider (select two)?
Respuesta
-
Increase the floor-to-area ratio of the building.
-
Implement a construction activity pollution plan.
-
Use pervious paving materials for the parking area.
-
Locate parking underground.
-
Select drought-tolerant plantings.
Pregunta 22
Pregunta
An industrial facility is located in an area with no public transportation. In which ways can the project team reduce the
project’s transportation impact (select two)?
Respuesta
-
Provide a carpooling incentive to building occupants.
-
Upgrade the company cars to hybrids.
-
Install solar panels to power parking lot lighting.
-
Provide occupants a fuel subsidy.
Pregunta 23
Pregunta
A project adjacent to protected forestland that is home to a variety of plant and animal life wants to reduce the impact
of its site lighting. To achieve this, the project team installs exterior lighting that ___?
Respuesta
-
Provides for tasteful, decorative appearance.
-
Reduces the need for night-time security.
-
Adequately illuminates the night sky.
-
Does not trespass onto adjacent properties.
Pregunta 24
Pregunta
Prior to final selection of the project site, the owner and design team should confirm that the site is ___?
Respuesta
-
Compliant with the green design criteria
-
Compliant with the sustainable building codes
-
Previously undeveloped
-
Removed from other development
Pregunta 25
Pregunta
What is the primary standard used to establish the baseline case for indoor water use?
Pregunta 26
Pregunta
What is reduced when a project uses reclaimed water in its cooling towers?
Pregunta 27
Pregunta
How can potable water use for irrigation be reduced or eliminated (select two)?
Respuesta
-
Install submeters
-
Select locally adapted plants
-
Increase the coverage of turf grass
-
Use organic fertilizers
-
Select noninvasive plants
Pregunta 28
Pregunta
Wastewater from toilets and urinals is known as ___?
Respuesta
-
Brownwater
-
Potable water
-
Blackwater
-
Graywater
-
Drinking water
Pregunta 29
Pregunta
Nonpotable water is typically suitable for which of the following uses (select two)?
Respuesta
-
Ice making
-
Drinking
-
Showers
-
Toilet flushing
-
Irrigation
Pregunta 30
Pregunta
What is the baseline water use for water closets?
Respuesta
-
0.8 gallons per flush
-
1.0 gallons per flush
-
1.6 gallons per flush
-
3.2 gallons per flush
Pregunta 31
Pregunta
Municipally supplied reclaimed water is considered ____?
Respuesta
-
Free water
-
Nonpotable water
-
Process water
-
Blackwater
Pregunta 32
Pregunta
Process water use can be reduced by ____? (Choose two)
Respuesta
-
Installing submeters
-
Installing low-flow showerheads
-
Using high-efficiency irrigation technologies
-
Using ENERGY STAR-certified clothes washers
Pregunta 33
Pregunta
What is the first step a project team should consider when trying to save energy?
Respuesta
-
Use on-site renewable energy.
-
Reduce energy demand.
-
Adopt energy efficiency measures.
-
Install submetering equipment.
Pregunta 34
Pregunta
What strategy is being used for a project design that orients windows to allow the building to be warm in the winter,
stay cool in the summer, and capture daylight?
Pregunta 35
Pregunta
To what do renewable energy certificates (RECs) refer?
Respuesta
-
On-site photovoltaic systems
-
Off-site renewable energy purchases
-
Market-generated wind power
-
Stock in utility providers
Pregunta 36
Pregunta
One of the most cost-effective ways to ensure optimal ongoing energy performance is to ___?
Respuesta
-
Commission building systems
-
Upgrade mechanical systems
-
Install renewable energy systems
-
Maintain trees and landscaping features
Pregunta 37
Pregunta
Refrigerants are necessary as part of the refrigeration cycle often used to cool buildings. However, the benefits of their
use should be considered against their potential for adverse environmental impacts. These direct impacts are
quantified by which metrics? (Choose two)
Pregunta 38
Pregunta
A project team is selecting the HVAC system for the tenant space. Which primary factors should be considered to
minimize the environmental impact of the system (select two)?
Respuesta
-
First cost
-
Expected life
-
Energy performance
-
Lead time
Pregunta 39
Pregunta
Energy use associated with office equipment, kitchen cooking, and escalators is known as ___?
Respuesta
-
Regulated energy
-
Exempt energy
-
Process energy
-
Secondary energy
Pregunta 40
Pregunta
Which are considered renewable energy sources (select two)?
Respuesta
-
Nuclear
-
Solar
-
Wave
-
Natural gas
Pregunta 41
Pregunta
How many years can an agricultural product grown or be raised to be considered as rapidly renewable by LEED?
Pregunta 42
Pregunta
What is the first step in a successful waste management policy?
Respuesta
-
Recycle all possible construction materials.
-
Reuse existing materials.
-
Reduce the total quantity of waste.
-
Specify recyclable materials.
-
Determine the embodied energy of the product.
Pregunta 43
Pregunta
A project generates 100 tons of waste throughout construction. 50 tons are collected on-site and sent to a sorting
facility with a facility-wide diversion rate of 60%. 40 tons are separated on-site and sent directly to recyclers. The final
10 tons are incinerated off-site. What percentage of waste does LEED consider to have been recycled?
Pregunta 44
Pregunta
According to the EPA, what percentage of solid waste is currently recycled in the United States?
Pregunta 45
Pregunta
A building material that is made from recycled soda bottles contains ___?
Respuesta
-
Post-industrial recycled content
-
Post-consumer recycled content
-
Pre-consumer recycled content
-
Pre-fabricated recycled content
Pregunta 46
Pregunta
LEED defines regional materials as originating within ___?
Respuesta
-
50 miles of the project site
-
250 miles of the project site
-
500 miles of the project site
-
750 miles of the project site
Pregunta 47
Pregunta
Ongoing consumables are consumed during which of the following?
Pregunta 48
Pregunta
Which environmentally preferable attributes of materials does LEED recognize (select three)?
Respuesta
-
Are harvested and manufactured regionally
-
Contain recycled content
-
Are sourced from developing countries
-
Are salvaged
-
Offer future customization options
Pregunta 49
Pregunta
According to the Environmental Protection Agency, what percentage of time do Americans spend indoors?
Pregunta 50
Pregunta
Thermal comfort is typically attributed to what environmental factors?
Respuesta
-
Temperature, humidity, and air speed
-
Ventilation, temperature, and daylight
-
Humidity, ventilation, and controllability
-
Density, temperature, and solar heat gain
Pregunta 51
Pregunta
The abbreviation VOC refers to ____?
Respuesta
-
Volatile organic compounds
-
Variable operating conditions
-
Variable ozone contaminants
-
Versatile organized composites
Pregunta 52
Pregunta
Which strategy supports improved indoor air quality?
Respuesta
-
Eliminate refrigerants with ozone-depleting potential.
-
Avoid the use of products with high carbon dioxide concentrations.
-
Use filters with a low minimum efficiency reporting value (MERV) rating.
-
Use materials with recycled content.
-
Use advance framing techniques.
-
Design systems to deliver ample outside air.
Pregunta 53
Pregunta
A school project in predesign would like to incorporate building strategies to maximize student learning. Which
strategies should be considered to achieve this goal (select two)?
Respuesta
-
Install individual thermal comfort controls in offices.
-
Incorporate daylight into classrooms.
-
Reduce the energy use of the building below the baseline standard.
-
Consider acoustical issues in core learning spaces.
Pregunta 54
Pregunta
An operable window is considered what kind of control?
Pregunta 55
Pregunta
Demand-controlled ventilation is typically adjusted in response to ___?
Pregunta 56
Pregunta
In addition to prohibiting smoking within the building, where is it also important to prohibit smoking to reduce occupant
exposure to harmful airborne chemicals (select two)?
Pregunta 57
Pregunta
An Innovation in Design credit for exemplary performance would be available for ___?
Respuesta
-
Implementing a comprehensive green building education program
-
Significantly diverting construction waste beyond the requirement of 75%
-
Achieving carbon neutrality
-
Providing 75% more spaces with daylighting
-
Developing a green housekeeping policy
Pregunta 58
Pregunta
Projects can identify which credits have regional priority by ____?
Respuesta
-
Checking the USGBC website
-
Researching locally pertinent environmental issues
-
Submitting a Credit Interpretation Request (CIR)
-
Calculating the net environmental impact
Pregunta 59
Pregunta
An Innovation in Design credit for innovative strategies is likely available for projects that ___?
Respuesta
-
Issue a press release to announce their LEED project registration.
-
Include two LEED Accredited Professionals on the project team.
-
Develop an educational outreach program.
-
Plan to enroll the project in LEED for Existing Buildings: Operations and Maintenance.
Pregunta 60
Pregunta
A project team is considering pursuing an Innovation in Design credit for a strategy that will require a large capital
expense. The team decides that it will implement the strategy only if the strategy will be eligible for an Innovation in
Design credit. What steps should the team take to determine whether its strategy will be eligible for the credit?
Respuesta
-
Research existing CIRs to see whether the strategy has been previously addressed.
-
Calculate the strategy’s overall environmental impact and self-evaluate whether it is significant.
-
Draft a compelling narrative for the LEED submittal.
-
Check the LEED rating system.