Kaplan - CDs 2009 [Cost Estimates] Chapter Quiz Questions

Descripción

Kaplan Study Guide
Tiffany Brown
Test por Tiffany Brown, actualizado hace más de 1 año
Tiffany Brown
Creado por Tiffany Brown hace alrededor de 8 años
11
1

Resumen del Recurso

Pregunta 1

Pregunta
An architect's preliminary estimate of construction cost would consider all of the following EXCEPT: I. labor and materials supplied by the owner. II. cooling towers. III. land acquisition costs. IV. the architect's fee. V. metal curtain wall systems
Respuesta
  • A. I only
  • B. I and IV
  • C. None, everything would be considred
  • D. III and IV

Pregunta 2

Pregunta
An architect who prepares a preliminary estimate of construction cost according to the subsystems method
Respuesta
  • A. considers one set of subsystems for concrete buildings and a different set for steel buildings.
  • B. can easily analyse the cost of alternative exterior wall systems.
  • C. would most likely use this method during the schematic design phase.
  • D. would be performing an additional service under the AIA Agreement between Owner and Architect.
Mostrar resumen completo Ocultar resumen completo

Similar

Mejores Sistemas Educativos del Mundo
Diego Santos
Inglés - Verbos Compuestos I (Phrasal Verbs)
Diego Santos
Gramática para practicar el First Certificate I
Diego Santos
Historia de Al-Ándalus
maya velasquez
Arte Prerromano
maya velasquez
Compás de 4/4
mariajesus camino
ANATOMIA DEL SISTEMA NERVIOSO
Maria Heredia Sa
RESOLUCIÓN DE CONFLICTOS
Kelly Maria
FRANQUISMO (1939-1975)
Juan Cano Molina
Lectura afectiva básica
darwin jaramillo
MAPA DE NAVEGACIÓN UNIMINUTO
Maria Alejandra Osorio Jimenez