SAB9#74 y 89_Quality_Process I & II

Descripción

Mapa Mental sobre SAB9#74 y 89_Quality_Process I & II, creado por Salvador Rueda el 03/03/2016.
Salvador Rueda
Mapa Mental por Salvador Rueda, actualizado hace más de 1 año
Salvador Rueda
Creado por Salvador Rueda hace más de 8 años
18
0

Resumen del Recurso

SAB9#74 y 89_Quality_Process I & II
  1. Quality is defined as the degree to which the project fulfills requirements
    1. Quality Management Process
      1. Planning
        1. Plan Quality Management
          1. Determine Quality standards, process, and metrics
            1. Create process improvement plan
              1. Determine all roles and responsibilities
              2. Executing
                1. Perform Quality Assurance
                  1. Request changes
                    1. Continuously improve
                      1. Follow processes
                        1. Perform quality audits
                        2. Monitoring and controlling
                          1. Control Quality
                            1. Take action to control de project
                              1. Measure performance against other metrics in the PM plan
                                1. Analyse and evaluate performance
                                  1. Influencethe factors that cause changes
                                    1. Perform quality control
                                  2. Includes creating and following policies and procedures to ensure that a project meets the defined needs it was intented to meet from the costumer´s perspective
                                  3. The PM should recommend improvements to the performing organization´s standards, policies and process.
                                    1. It should be considered whenever there is a change to any of the project constraints.
                                      1. It should be cheked before an activity or work package is completed
                                        1. The PM must spend time trying to improve quality
                                          1. The PM must determine metrics to be used to measure quality before the project work begins
                                            Mostrar resumen completo Ocultar resumen completo

                                            Similar

                                            100  años  de  Soledad
                                            JL Cadenas
                                            Historia Contemporánea: Los fascismos
                                            María Salinas
                                            SISTEMA REPRODUCTOR HUMANO_2
                                            sistemas.liceova
                                            Guerra Civil Española: Fechas Clave
                                            maya velasquez
                                            Linea del tiempo Ciencia
                                            erick romero
                                            ECOSISTEMAS
                                            MARTÍN PINOS QUÍLEZ
                                            TEOREMA DE PITAGORAS
                                            Alejandra GamboaMLLM
                                            HISTORIA: HECHOS, PERSONAJES...
                                            Ulises Yo
                                            FGM-11. DERECHOS Y DEBERES DE LOS MIEMBROS DE LAS FUERZAS ARMADAS
                                            antonio del valle
                                            Comunicación Celular
                                            Leonardo Ortega
                                            Soluciones Quimicas
                                            Lucero Angelica