Muri-variation in operation
process, not cause by end
customer
waste=from, unreliable vendors, bad
design, long set up times, inspection of line
Muri: to much equipment,
facilities, people
primary elements
inventory only when
needed
zero defects
quality
reduce lead/setup times,
queue lengths+lot sizes
incrementally revise
operations
themselves
accomplish all at
minimum cost
JIT
synonyms
IBM=continuous
flow
manufacturing
HP,
stockless
production
GE,
management
by site
Motorola, short cycle
manufacturing
Toyota:
TPS
Boeing:Lean
manufacturing
John Deere:one piece
flow manufacturing
philosophy of
manufacturing
management
with objectives
attack fundamental
problems
eliminate
waste
simplicity in
production
management
identify problems
not mask
Lean process each
step=
Valuable-judge by customer
capable:right
first+every time
Available:ready
when needed
Adequate:just
enough
capacity
Flexible:switch
different task-
low££
lower inventory level= issues arise
easier- scrap, setup time, quality probs,
late delivery, process downtime
Push strategy, work from production
to retailer. Production set on historic
conditions, not responsive to
changes in demand=overstocking,
bottlenecks, unaceptable service
levels, obsolescence
supply chain=combo of both,
intersection= decoupling
point/push-pull boundary
dell build to
order-components=push, final
assembly=pull, decoupling
point=assembly line
work=on demand
photocopy shop,
amazon
Pull: demand driven not forcast
driven. doesn't require make to
order, TMM-nearly pull
production-more supermarket
style, use kanban cards when
stock=low
work released based on system
status
vending machine,supermarket
key elements-
total quality management-
workers=own quality
inspectors,
scrap/rework=inconsistant
with flow
total employee involvement-
commitment+participation
by everyone
5 basic
concepts
specify value- separate value from waste-eliminate
waste, product=meet customer needs,
teamwork=eliminate waste, specify values human
relations=more complicated than human-product
interactions
identify value
stream-no all activities
to make
product+optimise them,
take customer
viewpoint=identify
activities that add
value, activities=focus
on tier-one supply chain
companies
preconditions-trust=labour+management, recognition of
processes, familiarity with problem solving, quality at
source, agreement over value+waste, right settings,
agreement that change=needed