null
US
Sign In
Sign Up for Free
Sign Up
We have detected that Javascript is not enabled in your browser. The dynamic nature of our site means that Javascript must be enabled to function properly. Please read our
terms and conditions
for more information.
Next up
Copy and Edit
You need to log in to complete this action!
Register for Free
1917183
Overhead Lines
Description
Element 5 Page 2
No tags specified
ngc2
Mind Map by
Yasir Kayani
, updated more than 1 year ago
More
Less
Created by
Yasir Kayani
almost 10 years ago
11
1
0
Resource summary
Overhead Lines
where possible, lines should be diverted or made dead before work - pre-planning is vital
it may be possible to make line dead for short periods - work can be planned for these times
liaise with local electricity supplier or owner of lines on precautions required
training should be provided in precautions, especially dangers of carrying long objects e.g. ladders near lines
cranes/excavators, etc may need to be modified by fitting physical restraints
adequate supervision should be provided
Show full summary
Hide full summary
Want to create your own
Mind Maps
for
free
with GoConqr?
Learn more
.
Similar
Safe Movement of Vehicles
Yasir Kayani
Work at Height
Yasir Kayani
DSE Risk Assessment
Yasir Kayani
Hand Tools
Yasir Kayani
Portable Electrical Equipment
Yasir Kayani
Violence at Work
Yasir Kayani
Temperature
Yasir Kayani
Substance Misuse
Yasir Kayani
Manual Handling
Yasir Kayani
Cranes
Yasir Kayani
Electrical Control Measures
Yasir Kayani
Browse Library