Contracts - Arch-Consultant Agrmt for a Sustainable Project AIA Doc C401 SP

Descrição

PPM ARE 5.0 PPM (Project Planning & Mgmt) Ballast Review FlashCards sobre Contracts - Arch-Consultant Agrmt for a Sustainable Project AIA Doc C401 SP, criado por Kara Biczykowski em 01-10-2021.
Kara Biczykowski
FlashCards por Kara Biczykowski, atualizado more than 1 year ago
Kara Biczykowski
Criado por Kara Biczykowski aproximadamente 3 anos atrás
2
0

Resumo de Recurso

Questão Responda
- AIA Doc C401 SP - Standard Form of Agrmt Btwn Arch & Consultant, for use on a Sustainable Project 1) definitions are the same as in: 2) roles & responsibilities of the consultant are the same as in: 1) AIA Doc A201 SP Gen. Conds. for use on a Sus. Project 2) AIA Doc C401
-additional added provisions to the C401 for consultants include: 1) the consultant is responsible for the sustainable consultant services designated under the primary agrmt btwn the owner & arch 2) the consultant must perform the sustainable measures to the extent applicable 3) at the archs request, the consultant must also attend the sustainability workshop 4) like the arch, the consultant does not warrant or guarantee that the project will achieve the sustainable objective *the arch must prov. consultant a copy of sus. plan when approved by owner

Semelhante

Contracts - Gen Conds of the Contract for a Sustainable Project AIA Doc A201 SP
Kara Biczykowski
Contracts - Arch-Consultant Agrmt AIA Doc C401
Kara Biczykowski
Contracts - Owner-Contractor AIA Doc A101
Kara Biczykowski
Contracts - Supplementary & Special Conds of the Contract
Kara Biczykowski
Contracts - B101 SP (Sustainable Project)
Kara Biczykowski
Project Quality Control
Kara Biczykowski
Contracts - Owner-Arch Agreement B101
Kara Biczykowski
Project Planning & Mgmt
Kara Biczykowski
Sustainable Design
Kara Biczykowski
Project Execution
Kara Biczykowski
Construction Administration
Kara Biczykowski