CM 434 Lean Construction
  1. LEAN SUPPLY CHAIN MANAGEMENT
    1. Attributes Construction Supply Chain (
      1. Push vs Pull
        1. Push
          1. Materials released on pre-determined schedule
            1. , cost is increased inventory
            2. Pull
              1. Downstream stakeholders
                1. Release triggered by customer(s
                2. Pull w/Bulk Materials
                  1. Kanban
                    1. Customer withdraws from “supermarket
                      1. supermarket then gets replenished by issuing production Kanban; largely visual
                    2. No shop drawings
                      1. Prevents Over Production
                        1. Allows tightly bounded inventory to build up between supplier and customer process
                        2. Material purchased from uniformly produced lots
                          1. → Generally need to have some on-site inventory
                            1. Costs association
                        3. Pull w/ ETO Products
                          1. Requirements
                            1. Lead time
                              1. Look ahead window
                              2. Shop Drawings
                                1. Increase Look Ahead window
                                  1. Easier to perform
                                  2. Reduce Lead time
                            2. Product Types
                              1. Bulk
                                1. MTO
                                  1. ETO
                                  2. Construction Companies generally do not control supply chain
                                    1. Local optimization is limitation of construction
                                      1. Material MGMT Factors
                                        1. space, price, planning (demand) reliability, lead time
                                    2. LEAN DESIGN
                                      1. Pull in Design
                                        1. Target Value Design (TVD)
                                          1. Integrated Design (IDP)
                                            1. Choose-by-advantage (CBA)
                                            2. INTEGRATED PROJECT DELIVERY
                                              1. Attributes
                                                1. Integrate Project Delivery
                                                  1. GMP vs EMP
                                                    1. Contractual Methods for Sharing Pain/Gain
                                                    2. ACTIVITY-BASED COSTING
                                                      1. Two goals of ABC
                                                        1. Mechanisms
                                                          1. Cost Drivers

                                                          Semelhante

                                                          Artigo Científico elaboração
                                                          Candido Gabriel
                                                          INQUÉRITO POLICIAL
                                                          julianodanielp
                                                          Simulado de física
                                                          Alessandra S.
                                                          Como se Preparar para Concursos com Mapas Mentais
                                                          Alessandra S.
                                                          Conceitos de Contabilidade
                                                          Alessandra S.
                                                          Constituição Federal - Artigos 1 à 5
                                                          GoConqr suporte .
                                                          A U T A R Q U I A
                                                          Jean Pierre Silva
                                                          Direito Penal - Escrevente TJ-SP
                                                          Luiz Gustavo Muzzi Rodrigues
                                                          Plano de Aula em 5 minutos
                                                          GoConqr suporte .
                                                          PLANEJAMENTO DE LÍNGUA PORTUGUESA 2018 - 2ª ETAPA
                                                          Adriana Marcia Couto Poletti
                                                          EMA-134 Doutrina de liderança na Marinha
                                                          Iris Gouvêa