Cal 1

Descrição

Cal 1
Enrique Gomez
Quiz por Enrique Gomez, atualizado more than 1 year ago
Enrique Gomez
Criado por Enrique Gomez mais de 5 anos atrás
6
0

Resumo de Recurso

Questão 1

Questão
On a control chart, the customer’s acceptable quality limits are represented as:
Responda
  • a. Control limits
  • b. Mean
  • c. Specification
  • d. Normal distribution

Questão 2

Questão
If you and your Project team were using a Scatter diagram to check for correlation of two Project quality variable, you would be involved in:
Responda
  • a. Inspection.
  • b. Quality Prevention.
  • c. Control Quality.
  • d. Quality Audits.

Questão 3

Questão
In evaluating the possibility of something happening versus not happening, the sum of all probabilities equals what?
Responda
  • a. 100
  • b. 10
  • c. 1 or 100%
  • d. The standard

Questão 4

Questão
If the results of activity A have no bearing on the results of activity B, the two activities would be considered:
Responda
  • a. Statistically unique
  • b. Statistically independent
  • c. Correlated, but nor causal
  • d. Mutually exclusive

Questão 5

Questão
In a control chart, the mean is represented as a horizontal line that represents:
Responda
  • a. The average of the control limits
  • b. The average of all the points
  • c. The average of all the points that are within control limits
  • d. A means of identifying assignable cause

Questão 6

Questão
Which of these tools is NOT a part of the Tools and Techniques of Quality?
Responda
  • a. Control Chart.
  • b. Flowchart
  • c. Statistical Sampling
  • d. Scatter Diagram

Questão 7

Questão
A project manager is analyzing and evaluating non-conformities. He is planning to use the 80/20 principle. What does this represent?
Responda
  • a. 80% of the problems are caused by 20% of the causes
  • b. 80% of the problems can be resolved while the remaining 20% have no solution
  • c. 20% of the problems can be resolved while the remaining 80% have no solution
  • d. 20% of the problems are caused by 80% of the causes

Questão 8

Questão
A project implemented several steps to improve customer satisfaction but the result from the next survey remained the same as before. How can the results be analyzed to find out why the steps did not make any improvement?
Responda
  • a. Draw a control chart to see how many surveys results are outside limits.
  • b. Using root cause analysis to find what is still causing customer dissatisfaction.
  • c. Create a Pareto Chart to see what is the biggest dissatisfaction customer is having.
  • d. Perform quality audit to verify quality measurements.

Questão 9

Questão
If you were using a fish bone diagram to determine root causes of problems, you would be involved to:
Responda
  • a. Quality Inspection
  • b. Quality Prevention
  • c. Control Quality
  • d. Quality Audits

Questão 10

Questão
Fishbone diagrams are also known as what?
Responda
  • a. Ishikawa diagram
  • b. Cause and Effect diagram
  • c. Cause/Effect diagram AND Ishikawa diagram
  • d. Pareto diagram

Semelhante

Evolução biológica
joana_pinto_202
Feudalismo
Malu Miralha
Princípios Direito Penal
Carlos Moradore
Cap 2: O Reflexo Aprendido - Condicionamento Pavloviano (Livro: Princ. Bás. da Análise do Comp.)
Lorena S. Sousa
Livros para Vestibular - Fuvest e Unicamp
GoConqr suporte .
5 Ferramentas de Estudo para Melhorar sua Aprendizagem
GoConqr suporte .
Normas Regulamentadoras de Segurança e Saúde do Trabalho (NR)
Edson Baal
TGA - Teoria Clássica
Natanael Lima
Nutrição para o Cérebro e a Memória
Joana Meira
Art. 5º da CF/88
Luís Felipe Mesiano
Plano de estudos ENEM 2017 - Matérias que mais caem
Nathalia - GoConqr