Questão 1
Questão
------- Function returns the starting position of one string within another, and is case sensitive?
Responda
-
Find (Instring)
-
search
-
start
-
instring (start)
Questão 2
Questão
In which type of testing, look and feel consistency comes?
Responda
-
Usability
-
GUI
-
Basic Functional...
-
All
Questão 3
Questão
The basic criteria to be followed while testing a web application are
Responda
-
Flow
-
All-path
-
Page
-
Hyperlink Testing
Questão 4
Questão
------ Key techniques used in security testing are
Responda
-
SQL injection
-
Phishing
-
Vulnerability
-
All
Questão 5
Questão
6. In which stage QE starts
I. Design
II. Development
Questão 6
Questão
------- Are interfaces of web application
Questão 7
Questão
A new test case is added in QC using
Responda
-
Add new test case
-
Add new test set
-
New test case
-
New test set
-
All
Questão 8
Questão
-------Testing is critical in web application testing
Responda
-
Compatibility
-
DB
-
page
-
usability
Questão 9
Questão
10. ------ is a way of attempting to acquire information such as Usernames, password, and Credit card details by masquerading as a trustworthy entity in an electronic communication.
Responda
-
SQL injection
-
Phishing
-
Vulnerability
-
All
Questão 10
Questão
Stress testing is -----(check box)
Responda
-
Memory leaks
-
Race Conditions
-
Synchronization issues
-
None
Questão 11
Questão
To accommodate future loads, you need to know how many additional resources are necessary to support future usage levels.
Responda
-
Capacity testing
-
load testing
-
stress testing
-
smoke testing
Questão 12
Questão
________is responsible for installing the solution into the PROD environment.
Responda
-
Release Management
-
Test team
-
development team
-
production team
Questão 13
Questão
Simulators play big role when are no mobile devices available for testing.
Questão 14
Questão
Find Bugs is a static analysis tool that examines your class or JAR files.
Questão 15
Questão
Principles of BDD
Questão 16
Questão
It is important that when a defect is raised, it is generated through test lab.
Questão 17
Questão
Defect leakage is because of ----
Questão 18
Questão
All types of templates are available in c2.0.
Questão 19
Questão
Process types of templates are available in c2.0.
Questão 20
Questão
It is not needed to exclude a project from PHS score.
Responda
-
Closing a WMP
-
Closing a project
-
Set IE factor
-
None
Questão 21
Questão
Which projects are ported to c2.0 from ESA?
Responda
-
Proposal
-
Bench
-
External
-
Administrative
Questão 22
Questão
QC has defect tab for defect management
Questão 23
Questão
In defect tab what we can done….
Responda
-
Defect reports
-
Create
-
Manage
-
Update
Questão 24
Questão
Initial stage of software life cycle is
Responda
-
Requirement Analysis.
-
design
-
coding
-
maintenance
Questão 25
Questão
Which is not the type of severity?
Responda
-
Severe
-
High
-
Low
-
Critical
-
Medium
Questão 26
Questão
Baseline RTM is exit criteria for test execution
Questão 27
Questão
Exit criteria is used to
Questão 28
Questão
Junit4 allows grouping of test cases
Questão 29
Questão
Documenting requirements is used to know the problems of the system.
Questão 30
Questão
Cross browser compatibility testing can be automated.
Questão 31
Questão
Filtering can be used for the data manipulation and data retrieval.
Questão 32
Questão
QC allows the following features. extra option 'favorites'
Responda
-
Filter and cross filter records
-
Sort and group sort records
-
Snapshot
-
Alerts and follow up flags
-
All of the above
Questão 33
Questão
Dashboard benefits
Responda
-
Manage risk of mission-critical applications
-
shows those alerts which are critical
-
alerts the time left so that SLA is met
-
All of the above
Questão 34
Questão
A project metrics once closed can opened by reopening it
Questão 35
Questão
….. Gives 100% test coverage
Responda
-
Branch coverage
-
Statement coverage
-
RTM
-
all coverage
Questão 36
Questão
What type of testing done by developers
Questão 37
Questão
Which factors that depends on project
Responda
-
Severity
-
Release
-
Developer
-
All
Questão 38
Questão
What are the types of testing techniques
Responda
-
Dynamic
-
Static
-
Experience Based
-
No testing
Questão 39
Questão
------- testing is performed before the application is rolled out?
Responda
-
UAT
-
System
-
Integration
-
Regression
Questão 40
Questão
Pareto analysis is based on classical 80/20 rule.
Questão 41
Questão
Pareto analysis using the following tools.
Questão 42
Questão
Pareto analysis is used to _________ for potential identify the defects.
Responda
-
root cause analysis(RCA)
-
cause analysis
-
Synthetic analysis
Questão 43
Questão
CAR is the combination of pareto analysis &root cause analysis
Questão 44
Questão
Testing forms are
Responda
-
Junit
-
TestNG
-
JTesting
-
a & b
-
all
Questão 45
Questão
Defect tracking is not a good suggestion for testing.
Questão 46
Questão
Metrics frequency can be selected by enabling
Responda
-
Enabling metrics
-
Enable testing metrics
-
Benchmarks
-
Test data
Questão 47
Questão
OLBM stands for……
Responda
-
Organizational level bench mark
-
Operational level bench mark
-
optional level benchmark
-
orthogonal level bench mark
Questão 48
Responda
-
Informal review
-
Walkthrough
-
Technical review
-
Inspection
-
All of the above.
Questão 49
Responda
-
No formal process
-
May take the form of pair programming or a technical lead reviewing designs and code result may be documented
-
Varies in usefulness depending on the reviewers
-
Main purpose: inexpensive way to get some benefit
Questão 50
Questão
Database testing is
Responda
-
Checking tables
-
Writing queries
-
Procedures
-
All of the above
Questão 51
Questão
Non functional requirements
Questão 52
Questão
----- Tool used to identify the source code, physical application that is causing the bottle neck.
Questão 53
Questão
Goal analysis is not identity the in completed , inconsistency requirement.
Questão 54
Questão
-------- Tool is used to identity whether all the functional specifications are met.
Questão 55
Questão
Testing metrics are enabled --------hrs
Questão 56
Questão
Cannot generate various defect reports from QC defect tab
Questão 57
Questão
When u open a project in QC it open & display module in which v r last working
Questão 58
Questão
Bug triage meeting are project meetings in which open bugs are divided into categories
Questão 59
Questão
Which of following are not key task for defect tracking (radio?)
Questão 60
Questão
Which of the following is broken down individual task such as processes, decisions,& then connected
Responda
-
Activity diagram
-
Use case
-
Requirement
-
none
Questão 61
Questão
checking if communication is proper b/w web server- Application server and Application server – database server and vice versa
Responda
-
Server interface,
-
internal interface,
-
External interface
-
all
Questão 62
Questão
What comes just before test execution .............
Responda
-
Test Development
-
design
-
maintenence
-
Test run
Questão 63
Questão
Select valid defect types
Responda
-
Functional
-
Integration
-
Developmental
-
Rational
-
Network
Questão 64
Responda
-
Testing
-
Production
-
Prevention
-
Appraisal
Questão 65
Questão
Frequent code check-in pushes developer to create modular, less complex code
Questão 66
Questão
When annotation in Junit4 replaces the setup method in Junit3 (eLearning)
Responda
-
Before Class
-
After class
-
Between Class
Questão 67
Questão
While designing test case very common mistakes we do
Responda
-
Perform a through clean up
-
Incomplete , incorrect or incoherent set up
-
Write too short test cases
-
Unclear about test result
-
miss a step
Questão 68
Questão
Action verb” used in Test scenario
Responda
-
Verify
-
Validate
-
Evaluate
-
Test
-
connect
Questão 69
Questão
Priority is criticality of test case
Questão 70
Questão
Project repository is automaticaly created wen v create a project to store document
Questão 71
Questão
Version control system is feasible for ____________
Questão 72
Questão
Cannot generate various defect reports from QC defect tab
Questão 73
Questão
Key task for running test (radio)
Questão 74
Questão
Who will generate defect report?
Responda
-
PM
-
TL
-
TM
-
developer
-
tester
Questão 75
Questão
Tools of Automation
Responda
-
Load runner
-
Rational robot
-
silk test
-
QTP
Questão 76
Questão
What are the benefits of release modules (Release and cycle management) in QC??
Responda
-
Manage projects and assests against release and cycles
-
Track release progress
-
Gain visibility into release readiness and release quality
-
Compare releases and cycles for conti process impro
Questão 77
Questão
What are the tools used for defect tracking??
Questão 78
Questão
What does MCDC stand for?
Responda
-
Modified condition/Data coverage
-
Modified Condition/Decision Coverage
-
Mature Condition/Data Coverage
Questão 79
Questão
Abusive language should be used for Effective Defect logging
Questão 80
Questão
Metrics porting b/w Prolite & C20 occurs
Responda
-
Once in month
-
Every 24 hour
-
Every hour
-
None
Questão 81
Questão
How to create bug reports (radio)
Responda
-
Single bug in multiple reports
-
Multiple bugs in single single report
-
single bug in single report
-
All above
Questão 82
Questão
C20 has provision to add Custom Metrics
Questão 83
Questão
Forcing error conditions in System is
Responda
-
Exception
-
Negative
-
Exception or negative
Questão 84
Questão
It is important that defects encountered during test execution are created through test lab
Questão 85
Questão
Type of req which satisfies the needs of customer or the consumer directly interacts with
Responda
-
operational req
-
functional req
-
technical req
-
transitional req
Questão 86
Questão
Status of the defect when it is logged
Responda
-
new
-
open
-
deferred
-
rejected
Questão 87
Questão
Where is IDE score card available in the C20
Responda
-
Process
-
governance
-
package
Questão 88
Questão
Module to store test cases that are to be executed
Responda
-
Test lab
-
test plan
-
test set
Questão 89
Questão
Process package in C20 can be modified according to project needs.
Questão 90
Questão
Which of the following is not a test execution metrics?
Responda
-
test design coverage
-
test effectiveness
-
no of defects
Questão 91
Questão
Steps in load testing (stress)
Responda
-
identify scenarios
-
identify load
-
Simulate load
-
Identify TC
-
Calculate metrics
Questão 92
Questão
Type of testing good for automation
Responda
-
Regression testing
-
Retesting
Questão 93
Questão
Select the purpose of use case modeling
Questão 94
Questão
Select the type of testing which can be automated
Responda
-
regression
-
functional
-
load
-
performance
-
stress
Questão 95
Questão
How many steps on root cause analysis
Questão 96
Questão
Best defect prevention technique for long time
Responda
-
5 why analysis
-
Pareto analysis
-
Cause effect
-
RCA
Questão 97
Questão
Type of dynamic technique
Responda
-
BVA
-
Error guessing
-
Reviews
Questão 98
Questão
All the defects are not process defects?
Questão 99
Questão
In testing phase all the defects are application defects.
Questão 100
Questão 101
Questão
Risk based technique is a technique of test execution?
Questão 102
Questão
Defects found should be tracked on test lab
Questão 103
Questão
Passive Voice should be used to reproduce defects
Questão 104
Questão
_______is a structure for documenting the function required for a system, usually involving software whether that is new or being changed
Responda
-
Use case
-
Prototype
-
User Story
-
Test Case
Questão 105
Questão
Data validation -----check box
Responda
-
Provides Message to define what the input you expect for cell is
-
Can be applied to cells even when data exists in old
-
Provides ability to set error message when user enter an invalid data
-
Useful even when the workbook is protected and shared
-
Restricts types of data entry in cell by using validation criteria
Questão 106
Questão
Baseline is a snapshot of library at a specific point of time
Questão 107
Questão
Advantage of unit testing
Responda
-
Faster debugging
-
Faster development
-
Better design
-
Regression tool
-
Reduce future cost
Questão 108
Questão
Defect aging is the different b/w the date when object fixed and the detection date
Questão 109
Questão
Best environment to test
Questão 110
Questão
Pre-requisite means
Responda
-
Initial set up
-
what we need
-
Requirement
-
prior information
Questão 111
Questão
Continuous integration means applying quality controlled after Dev.
Questão 112
Questão
Benefits of good requirements
Questão 113
Questão
Test Development effort is combined of Test cases and test scenarios
Questão 114
Questão
Goals of defect triage meeting
Questão 115
Questão
Use case is a collection of success and failure scenarios description actor using a system to support a goal
Questão 116
Questão
Mobile software testing includes (device)
Questão 117
Questão
Review Defect Density (check box)
Questão 118
Questão
From which status defect can be moved to deferred status
Responda
-
Assigned or open
-
Rejected
-
Reopen
-
Cancelled
Questão 119
Questão
Cognizant uses this tool for model based testing
Responda
-
Smartest
-
Requisite pro
-
ADAPART
-
none
Questão 120
Questão
Application Defects are caused due to
Responda
-
Coding Error
-
Missed requirement
-
Incomplete req document
-
Test plan