Question 1

Question
All of the following are true about reflected ceiling plans EXCEPT?
Answer
  • Shows a view of the ceiling as though it were reflected onto a mirror on the floor
  • Shows partitions that extend to the ceiling and those that extend through the ceiling
  • Shows power sources and outlets
  • Shows ceiling materials

Question 2

Question
When are mechanical, electrical, and plumbing details developed and coordinated with the interior drawings?
Answer
  • Preliminary design to prevent conflicts
  • For presentation to show the client that the design solution will "work"
  • During construction drawings
  • During design development

Question 3

Question
Specifications are made most concise by..
Answer
  • Using descriptive specs
  • Using reference standard specs
  • Using phrases instead of complete sentences
  • Avoiding the use of works like a, the, and all

Question 4

Question
According to standard drawing convention, how would a set of construction drawings produced by an interior designer be organized?
Answer
  • Title and index, fire protection drawings, mechanical, electrical, floor plans, reflected ceiling plans, elevations, details
  • title and index, architectural, electrical, fire protection, interiors, mechanical, plumbing, structural
  • Title and index, architectural, interiors, mechanical, electrical, structural, plumbing, fire protection
  • Title and index, floor plans, reflected ceiling plans, elevations, details, mechanical, electrical, fire protection

Question 5

Question
Which type of specification is a statement setting criteria and results required for the item being specified?
Answer
  • Performance Specification
  • Base-bid specification
  • Reference standard specification
  • Technical specification

Question 6

Question
Which of the following is the best way to show finish placement for a project with spaces that have 2 finishes, such as paint and wallcovering?
Answer
  • Schedule a meeting to walk through the finishes with the general contractor
  • Use wall finish tag symbols that coordinate with the schedule
  • Use a finish schedule and label the finishes N, S, E, W on the plan
  • Use a combination of lines, symbols, and elevations on a finish plan

Question 7

Question
In which type of drawing would you NEVER find furniture?
Answer
  • Reflected ceiling plan
  • Parti drawing
  • Section
  • Elevation

Question 8

Question
Which plan is sometimes aligned with the electrical and power/communication plans, because the exact location of many of these outlets is directly related?
Answer
  • Accessories
  • Furniture
  • Furnishings
  • Finishes

Question 9

Question
Which type of schedule would be LEAST likely to be found in a set of interior design drawings?
Answer
  • Window schedule
  • Millwork schedule
  • Equipment schedule
  • Finish schedule

Question 10

Question
Which type of drawing meets the requirements of either design intent, constraints, function, or constructability?
Answer
  • RCP
  • Section
  • Detail drawing
  • Shop drawing

Question 11

Question
Which of the following would NOT typical be the responsibility of the interior designer to show on a Reflected Ceiling Plan?
Answer
  • Height of dados and ceiling finishes
  • Exit signs and sprinkler locations
  • Full height wall partitions extending through the plenum to the concrete slab above
  • Switching and circuiting for lighting fixtures

Question 12

Question
Which of the following would an interior designer put into a schedule?
Answer
  • Hardware
  • Door/Window
  • Finish
  • All of the above

Question 13

Question
Which is the best lighting system to use in a graphic designer's office if the designer's goal is to provide a flexible and cost effective lighting system that creates a pleasant work environment?
Answer
  • Direct/Indirect
  • Task/Ambient
  • Recessed
  • Indirect

Question 14

Question
All of the following are true about wood structural systems EXCEPT?
Answer
  • Typically not used in residential construction
  • Is strong in both compression and tension
  • Typically used in small commercial construction
  • Is inexpensive and plentiful

Question 15

Question
What is NOT allowed in a return-air plenum?
Answer
  • Water supply pipes
  • Wood blocking
  • Electrical cable
  • Fire dampers

Question 16

Question
Which would you use to separate a building into 2 different construction types?
Answer
  • Fire barrier
  • Fire partition
  • 2 hour fire rated partition
  • Firewall

Question 17

Question
___________ Loads in a building are the permanent material weights of the building components, equipment, and other fixed elements.
Answer
  • Gravity
  • Dead
  • Dynamic
  • Horizontal

Question 18

Question
Which ceiling system would you use to accommodate acoustic ceiling tile, light fixtures, supply and return air grilles, fire sprinklers, and partitions attached in a consistent, unified way?
Answer
  • Suspended ceiling
  • demountable ceiling system
  • Grid ceiling system
  • Integrated ceiling system

Question 19

Question
Which of the following is true about solid-core doors?
Answer
  • Used as acoustical barriers
  • Are made with a variety of core types depending on the functional requirements of the door
  • All of these are true
  • Available with fire ratings of 20 minutes, 45 minutes, and 90 minutes

Question 20

Question
Which of the following would be used to improve the acoustical properties of a wall by isolating the wallboard from rigid attachment to framing?
Answer
  • Resilient channels
  • Wood furring strips
  • Insulation
  • Hat shaped furring channels

Question 21

Question
Which Is the best method to minimize noise and acoustic problems when planning a space?
Answer
  • Maximize common wall contact between spaces
  • Use acoustic ceiling tile
  • Stagger the placement of doorways
  • Use white noise to mask unwanted sounds

Question 22

Question
Which of the following would you most likely find on a reflected ceiling plan?
Answer
  • A
  • B
  • C
  • D

Question 23

Question
Which scale would you typically draw small and complex construction details in?
Answer
  • 1/2"=1'0"
  • 3"=1'0"
  • 3/16"=1'0"
  • 1/8"=1'0"

Question 24

Question
The dotted line in the exhibit shown below allocates:
Answer
  • Full height partitioning
  • Existing construction to be removed
  • Demising wall partition
  • Awning windows

Question 25

Question
In the exhibit, the top number inside each symbol refers to what in a set of working construction documents?
Answer
  • Indicates the sequential drawing number
  • Indicates the drawing sheet
  • Indicates the amount of views are shown
  • Indicates the number of drawings included

Question 26

Question
In the following door schedule, the frame of door 108A is made of what material?
Answer
  • Steel
  • Existing
  • Aluminum
  • Hollow metal

Question 27

Question
What would be the best scale to use if you were drawing a very complex elevation?
Answer
  • 1/4"=1:50
  • 1/2"=1:20
  • 1 1/2"=1:100
  • 3"=1:5

Question 28

Question
Which of the following hatch patterns represent batt insulation in a wall type?
Answer
  • A
  • B
  • C
  • D

Question 29

Question
Which of the following scales should NEVER be used for interior design construction drawings?
Answer
  • 1"=1'0"
  • 3/16"=1'0"
  • 1/8"=1'0"
  • 3/4"=1'0"

Question 30

Question
Water conservation is a primary goal for the current project that you are working on. You could use all of the following to reach this goal EXCEPT..
Answer
  • Use high efficiency toilets
  • Appropriate plant selection
  • Increase the use of potable(drinkable) water
  • Use low flow shower heads and faucets

Question 31

Question
Choose all that are components of the programming report
Answer
  • Programming concepts
  • Appendices
  • Executive summary
  • Goals and objectives of report
  • Summary of space needs
  • Space adjacencies
  • Code requirements
  • Design concept
  • Analysis of existing space
  • Budget and schedule requirements
Show full summary Hide full summary

Similar

ART NOUVEAU
Britknee52
IDFX Flashcards
Brittany Kelly
Green Cards
Brittney Andrews
Chapter 2 - Schematic Design
Rianna Straw
Eco Solvent Printing %% 9871585333 %% Complete Solution of Advertising
Nitin Kumar Srivastav
Eco Solvent Printing %% 9871585333 %% Complete Solution of Advertising
Nitin Kumar Srivastav
LED Boards %% 9871585333 %% Complete Solution of Advertising
Nitin Kumar Srivastav
Fabric Boards %% 9871585333 %% Complete Solution of Advertising
Nitin Kumar Srivastav
Interior Design %% 9871585333 %% Complete Solution of Advertising
Nitin Kumar Srivastav
Flex printing %% 9871585333 %% Complete Solution of Advertising
Nitin Kumar Srivastav
Fabric Boards %% 9871585333 %% Complete Solution of Advertising
Nitin Kumar Srivastav