Question 1

Question
The ____________ is direction of a celestial object from the observer, expressed as the angular distance from the north or south point of the horizon to the point at which a vertical circle passing through the object intersects the horizon.
Answer
  • azimuth
  • tilt
  • angle
  • direction

Question 2

Question
The _________ is the angle of the panels facing towards the sun?
Answer
  • tilt
  • azimuth

Question 3

Question
Solar panels are most efficient when installed on a _________ degree azimuth.
Answer
  • 150 degree azimuth
  • 180 degree azimuth
  • 200 degree azimuth
  • 270 degree azimuth

Question 4

Question
What tilt angle is best for efficiency and aesthetics?
Answer
  • 0 - 10 degree tilt
  • 10 - 20 degree tilt
  • 20 - 30 degree tilt
  • 30 - 40 degree tilt

Question 5

Question
What are the qualifications for a solar manufacturer to become a Tier One manufacturer?
Answer
  • 25 - year power guarantee
  • 10 - year limited product warranty
  • Third-party insurer
  • Made in the USA

Question 6

Question
A ______________, converts the variable direct current (DC) output of a photovoltaic (PV) solar panel into a utility frequency alternating current (AC) that can be fed into a commercial electrical grid or used by a local, off-grid electrical network.
Answer
  • solar inverter
  • solar panel
  • conduit
  • power optimizer

Question 7

Question
Where should the inverter be installed when installing a roof mounted solar system?
Answer
  • close to the home's electric panel box
  • in the shade
  • on the roof

Question 8

Question
The best place to install solar panels are in
Answer
  • direct sunlight
  • a partially shaded location

Question 9

Question
Stelcor Energy will not install over roof areas with
Answer
  • gas vents
  • bathroom vents
  • kitchen vents
  • t-vents

Question 10

Question
Stelcor Energy does not install atop of manufactured homes.
Answer
  • True
  • False

Question 11

Question
What panel box specifications are required to install solar?
Answer
  • At least a 100 - amp service
  • At least a 200 - amp service
  • At least two open ports
  • At least three open ports

Question 12

Question
What details about the customer's service panel box will need to be inputted within the customer's Deal?
Answer
  • combined or separate meter
  • amperage of service panel box
  • number of open ports

Question 13

Question
At the customer's home the Energy Consultant is required to take images of the customer's panel box. Where does the Energy Consultant upload those images?
Answer
  • Customer's Lead profile within CRM
  • Customer's Deal within CRM
  • Customer's Account within CRM

Question 14

Question
What are the three most important items, at a customer's home, that Energy Consultants are required to document with photos?
Answer
  • service panel box
  • placards of any items that will require an energy efficiency upgrade
  • panel box set up
  • photo of address
Show full summary Hide full summary

Similar

AQA GCSE Product Design Questions
Bella Statham
ART NOUVEAU
Britknee52
How Sewing Machines Work
faithkateridarli
Costume History Slidshow
Jemi Armstrong
Product Design
adamwood451
A LEVEL PRODUCT DESIGN - MODERN MANUFACTURING SYSTEMS
charlotte-clayto
GCSE Textiles - Design
Nicola Lees
GCSE Product Design Plastics (AQA Specification)
T Andrews
History of Arts and Interior Design II
wiekiepedia
U3: Instructional Outcomes and Underlying Theories (EDID6503 unit 3)
Annika L-M
GCSE ART AND DESIGN
darneshdadgostar