RIBA PLAN 2013
consultation
- INTEGRATE CHANGES
- Sustainability
- BIM
- Building services design
- UK Gov construction stategy
- OLD RIBA STAGE
- A: Appraisal
- B: Design Brief
- C: Apraisal
- D: Design Development
- E: Technical Design
- F1 & F2: Production information
- G: Tender Documentation
- H: Tender Action
- J: Mobilisation
- K: Construction to PC
- L: Post PC
- NEW RIBA STAGE
- 1: PREPARATION
- 2: CONCEPT DESIGN
- 3: DEVELOPED DESIGN
- 4: TECHNICAL DESIGN
- 5: SPECIALIST DESIGN
- 6: CONSTRUCTION (OFF + ONSITE)
- 7: USE AND AFTERCARE
- PROPOSALS
- Abolish A - L stages and
replace with 7 point schedule
of works incorporating:
- intellegent commissioning
- soft landings
- project outcomes
- differing stages of planning
- UK & international use
- Private + public sector
- Differing project sizes
- KEY CHANGES
- Work stages reduced from 11 to 7
& aligned with the CIC sch of
services
- Stages A & B have been merged into 1 intitial 'preparation stage'
- Stages F to L have been simplified and re-numbered
- Job specific flexibility replaces the single description
of tasks used in the Plan of works 2007
- Planning is accounted for in the design process
- Sustainability and BIM have been incorporated with
the introduction of BIM 'overlay' and 'Green Overlay'
- GREEN OVERLAY
- Provides a framework for the inclusion of sustainability in the apprisal,
breifing, design and construction process.
- the overlay takes the existing plan as a starting point add guidance notes and highlights
additional actions to promote the construction of sustainable buildings.