CM 434 Lean Construction
- LEAN SUPPLY CHAIN MANAGEMENT
- Attributes Construction Supply Chain (
- Push vs Pull
- Push
- Materials released on pre-determined schedule
- , cost is increased inventory
- Pull
- Downstream
stakeholders
- Release
triggered by
customer(s
- Pull w/Bulk Materials
- Kanban
- Customer withdraws
from “supermarket
- supermarket then gets replenished by issuing
production Kanban; largely visual
- No shop drawings
- Prevents Over Production
- Allows tightly
bounded inventory
to build up between
supplier and
customer process
- Material purchased from uniformly
produced lots
- → Generally need to have
some on-site inventory
- Costs association
- Pull w/ ETO
Products
- Requirements
- Lead time
- Look ahead
window
- Shop
Drawings
- Increase
Look Ahead
window
- Easier to
perform
- Reduce Lead
time
- Product Types
- Bulk
- MTO
- ETO
- Construction Companies
generally do not control
supply chain
- Local optimization is limitation of construction
- Material MGMT Factors
- space, price, planning (demand) reliability, lead time
- LEAN DESIGN
- Pull in Design
- Target Value Design (TVD)
- Integrated Design (IDP)
- Choose-by-advantage (CBA)
- INTEGRATED
PROJECT
DELIVERY
- Attributes
- Integrate Project Delivery
- GMP vs EMP
- Contractual Methods for Sharing Pain/Gain
- ACTIVITY-BASED
COSTING
- Two goals of ABC
- Mechanisms
- Cost Drivers