PDD Quiz I

Beschreibung

ARCH PDD Quiz am PDD Quiz I, erstellt von a a am 28/03/2024.
a a
Quiz von a a, aktualisiert vor 14 Tage
a a
Erstellt von a a vor 4 Monate
3
0

Zusammenfassung der Ressource

Frage 1

Frage
Which of the following scenarios below would be the best at reducing foot fall noise compared to the others?
Antworten
  • Carpet on soft underlayment on 4" to 8" thick concrete structural slab.
  • Carpet on underlayment on concrete structural slab with isolation hangers (spring, neoprene) with 6" or more air space resiliently suspended to secure gypsum board ceiling underneath.
  • Carpet installed on 2" to 4" floated concrete slab with fiberboard between pads on the concrete structural slab.
  • 8" concrete slab

Frage 2

Frage
Which type of joint allows movement between the concrete slab and adjoining columns and walls of a building?
Antworten
  • Isolation Joints
  • Control Joints
  • Slab Joints
  • Joist Joints

Frage 3

Frage
Drag and drop the given mortar types to match the given construction application options accordingly-each mortar type is to be used only once.
Antworten
  • N
  • M
  • S
  • O

Frage 4

Frage
During the construction administration phase of a high-end downtown historic hotel renovation project, the architect receives shop drawings for aluminum roof cladding and notices that copper fasteners are specified for attachment. What is the potential problem with the detail?
Antworten
  • Architect is only responsible for reviewing the shop drawing, not approving, therefore potential risks are not their responsibility.
  • A potential risk of galvanic corrosion exists; cladding will corrode.
  • A potential risk of galvanic corrosion exists; fasteners will corrode.
  • There is no risk of galvanic reaction, detail should be approved by architect.

Frage 5

Frage
An architect is working on the details of a new shopping mall project that will be built in an old navy yard as part of the redevelopment of the whole area. The developer wants to retain the existing character of the site by recommending the floor finishes of the main gallery area be slip-resistant exposed concrete. What type of concrete finishing method/material below is more suitable for the exposed floor finishes of the main gallery area of this new shopping mall?
Antworten
  • A burlap drag
  • Coarse-bristled broom finishing
  • Sawing
  • Machine Troweling

Frage 6

Frage
Which of the following is the most watertight mortar joint profile?
Antworten
  • Raked
  • Concave
  • Flush
  • Struck

Frage 7

Frage
A 34‐W, 425‐mA (milliampere), 48‐in. fluorescent tube produces 3200 lm. What is the illuminance on the floor of a 12 ft-square room in foot candles, assuming 60% overall efficiency and uniform illumination? (Round the nearest whole number)
Antworten
  • 267
  • 160
  • 22
  • 13

Frage 8

Frage
A 2-in.-diameter round steel rod 10 ft long is subjected to a tensile force of 60 kips. How much will it elongate under the load? (Round the nearest thousandth) Δ𝐋 = 𝐏𝐋/𝐀𝐄 and Modulus of Elasticity of steel at 29,000 ksi and π = 3,14
Antworten
  • 0.0025"
  • 0.006"
  • 0.079"
  • 0.047

Frage 9

Frage
During the construction documentation phase of a school project in Duluth, MN, the architect and the engineer are discussing the appropriate portland cement type to be specified for the project. Which type of the portland cement type below would provide the best performance considering the concrete work is scheduled in early November?
Antworten
  • Type I
  • Type II
  • Type III
  • Type IV

Frage 10

Frage
An architect is working on a high-end restaurant project where the client wants an open kitchen, visible to restaurant customers, with white tiles, cabinets and counter surfaces. While reviewing the interior elevations, the architect notices that the grout specified by the interior designer does not meet this design intent. Which material below is not supposed to be in the grout mixture if it is desired to have white finish color?,
Antworten
  • Iron
  • China clay
  • Limestone
  • Chalk

Frage 11

Frage
Which type of temperature reinforcement is more likely to be used to prevent cracking in the slabs due to abrupt temperature changes?𝐂𝐡𝐞𝐜𝐤 𝐭𝐡𝐞 𝐭𝐰𝐨 𝐭𝐡𝐚𝐭 𝐚𝐩𝐩𝐥𝐲.
Antworten
  • Steel rebars
  • Synthetic fiber reinforcement
  • Welded wire fabric.
  • Light welded wire fabric.

Frage 12

Frage
An 8 feet tall, 240 feet wide brick masonry wall has been designed, and the architect is working on updating the construction cost of the wall during the CD phase. Based on the itemized costs given below, what would be the total cost of the wall? • Approximately 175 bricks will be used per 10 square yard wall (waste material included), and 10 bricks cost $3.5 • 10 Sq Yd brick wall grout cost $250 • 10 Sq Yd brick wall labor cost $850 • 1.5% inflation cost should be added to the overall cost
Antworten
  • $24,773.00
  • $25,145.00
  • $25,890.00
  • $28,163.00

Frage 13

Frage
Which of the following documents are part of Bidding Documents? 𝐂𝐡𝐞𝐜𝐤 𝐭𝐡𝐞 𝐭𝐰𝐨 𝐭𝐡𝐚𝐭 𝐚𝐩𝐩𝐥𝐲.
Antworten
  • Change Orders
  • Addendum
  • General Conditions
  • Contract Modifications

Frage 14

Frage
During the bidding phase of an interior office renovation project, the owner decides to revise wood wall bases WB-2 and WB-3 to resilient vinyl wall bases. According to the partial finish plan view given above, select the rooms that will be affected based on this revision. 𝐂𝐡𝐞𝐜𝐤 𝐭𝐡𝐞 𝐟𝐢𝐯𝐞 𝐭𝐡𝐚𝐭 𝐚𝐩𝐩𝐥𝐲
Antworten
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 217

Frage 15

Frage
An architect is working on the revisions of the given items below during the Construction Documentation phase of a project. Drag and drop given revision items to match the given Master Specification divisions accordingly. Drag and drop the letter's across the irrelevant Division.
Antworten
  • X
  • Temporary protective walkways
  • Plastic Toilet Compartments
  • Dampers

Frage 16

Frage
The second floor of a high school library has classrooms, conference rooms, office spaces, and two staircases on opposite ends of the floor. The school board has decided to remodel the second floor to add an automatic fire sprinkler system and an emergency communication system. They also wish to expand the space by removing partition walls between the library and the adjacent unused building. With the new addition, the office space will increase by 20%, and classroom areas will increase by 30%. Based on the current areas per use given below, what is the minimum required stair width of the new space? 𝐂𝐮𝐫𝐫𝐞𝐧𝐭 𝐀𝐫𝐞𝐚𝐬: ○ Classrooms: 1860 SF ○ Conference Rooms: 800 SF ○ Office: 1150 SF https://codes.iccsafe.org/content/IBC2021P2
Antworten
  • 24"
  • 36"
  • 44"
  • 48"

Frage 17

Frage
Based on the information given in the plan diagram above, what is the minimum total length of an unobstructed straight ADA ramp system and entry hall required to create an accessible route between points A and B? (The thickness of the partition at the entry door is to be ignored)
Antworten
  • 46'
  • 48'
  • 51'
  • 56'

Frage 18

Frage
Select the location of the Main Switch Board on the electrical single-line diagram given above
Antworten
  • 1
  • 2
  • 3
  • 4

Frage 19

Frage
Drag and drop the given components of the schematic shelf detail above across to the letters accordingly.
Antworten
  • Brick Veneer
  • Air Space
  • Flashing
  • Shelf angle
  • Weep hole
  • Mortar net
  • Backer rod & sealant
  • Plastic shim

Frage 20

Frage
Select the location of the fire stop in the fire-rated partition and metal deck section detail given below.
Antworten
  • A
  • B
  • C
  • D
  • E
Zusammenfassung anzeigen Zusammenfassung ausblenden

ähnlicher Inhalt

PDD Quiz XII
a a
ABSOLUTISMUS - LUDWIG XIV
Julian 1108
Wie gut kennst du dich in Goethe's FAUST I aus?
barbara91
Epochen und Literaturströmungen_1
barbara91
IKA-Theoriefragen Serie 16 (15 Fragen)
IKA ON ICT GmbH
LEK 1
Peter M
Vetie Radiologie Vorlesungsfragen
Sophie Lütkemöller
Vetie Pharma 2016
E. König
Vetie Pharma Übungsfragen 2019/2020
Maite J
Vetie Parasitologie
Alina Stumpf
Lebensmittelkunde 2015 - Vetie
Peter Christian Ponn