ASAP 8 Methodology Technical Solution Management Work Stream Quiz

Beschreibung

Diploma ASA380 - ASAP Implementation Methodology Quiz am ASAP 8 Methodology Technical Solution Management Work Stream Quiz , erstellt von kim.t.dowling am 16/03/2016.
kim.t.dowling
Quiz von kim.t.dowling, aktualisiert more than 1 year ago
kim.t.dowling
Erstellt von kim.t.dowling vor mehr als 8 Jahre
34
1

Zusammenfassung der Ressource

Frage 1

Frage
The SAP Going Live Check is split into two sections: Analysis and Verification. What are the recommendations regarding delivery of these sessions? (More than one answer is correct. Please choose the correct answers.)
Antworten
  • All sessions should be delivered before the project go-live.
  • All sessions should be delivered after the project go-live.
  • Going Live Analysis is conducted at minimum four weeks before the project go-live, during the realisation phase.
  • Going Live Verification is scheduled after the start of production, during the Go Live Support phase.
  • All sessions are delivered by certified consultants from SAP Active Global Support through a remote connection.

Frage 2

Frage
Which are the deliverables of the Technical Solution Management work stream in the Realisation phase?
Antworten
  • Define General Settings and Master Data.
  • Quality Assurance Environment (QAS).
  • Technical Solution Design.
  • Technical Operations and Handover Plan.
  • SAP Going Live Check,

Frage 3

Frage
What is the purpose of the Technical Solution Management work stream in the project preparation phase? (One answer)
Antworten
  • To define General Settings and Master Data for the project.
  • To deliver QA and Production environments and finalize the development of the operations handbook.
  • To define and develop the Organisational and Production Support Readiness Check
  • To start preparation of essential technical and infrastructure deliverables that support the initial project planning of an SAP implementation project.
  • To prepare a strategy to hand off operations of the solution landscape to the post-production support organisation.

Frage 4

Frage
Which are the tasks of the deliverable 'Development Environment (DEV)' in the Blueprint phase? (More than one answer is correct. Please choose the correct answers.)
Antworten
  • Execute Technical Installation of SAP Products for DEV
  • Create master data in DEV environment - Master Data #1 - n
  • Conduct Design Review Service
  • Perform Manual Configuration in DEV
  • Import Configuration and Development Objects to QAS

Frage 5

Frage
Which transaction code in SAP Solution Manager is used to set up project documentation standards? (One answer)
Antworten
  • SOLAR01
  • RMMAIN
  • SOLAR02
  • SOLAR_PROJECT_ADMIN
  • SOLAR_LEARNING_MAP
Zusammenfassung anzeigen Zusammenfassung ausblenden

ähnlicher Inhalt

Physik: Elektrizität und Energie
JohannesK
Verdauung
Cassibodua
Spanisch Einstufungstest Niveau B1.1
SprachschuleAktiv
Maria Montessori - Hilf mir, es selbst zu tun
Nika L.
Genetik
Laura Overhoff
Grundbegriffe der Kunst
K Gal
Vetie - Histologie und Embryologie
Fioras Hu
Systemwissenschaften 1 Teil Jäger
Gustav Glanz
Vetie Pharma Datum unbekannt Karteikarten
Alina Stumpf
Basiswissen_MS-4.2_Foliensatz I
Bernd Leisen
Vetie Fleisch 2022
Maite J