Question 1
Question
If a LEED project that is providing preferred parking for fuel efficient and low emitting vehicles has multiple parking lots, where should the preferred parking spaces be located?
Answer
-
preferred parking spaces only need to be provided in one lot
-
preferred parking spaces only need to be located in the lot designated for visitors
-
preferred parking spaces only need to be provided in the lot designated for staff
-
preferred parking spaces must be distributed among all lots
Question 2
Question
Which LEED recognized strategy will require chain of custody documentation as proof of credit compliance?
Question 3
Question
What is the greatest benefit of an integrative design process as it relates to a LEED project?
Answer
-
educating the project owner
-
reducing project soft costs
-
meeting building codes
-
shortening the project schedule
-
capitalizing on credit synergies
Question 4
Question
How many years can an agricultural product grow or be raised to be considered as rapidly renewable by LEED?
Question 5
Question
Which of the following strategies does not qualify as providing "preferred parking"?
Answer
-
providing a space that is as close to the building as possible
-
providing a designated covered spot
-
offering a significant discount on parking passes
-
providing a guaranteed space in a lottery system
-
providing a randomly assigned parking space
Question 6
Question
When are CFC based refrigerants allowed to be used in a LEED project?
Question 7
Question
Which of the following is not a required design consideration for the recycling collection and storage area prerequisite?
Question 8
Question
A project team is using cotton insulation that is grown and manufactured 100 miles from the project site. What credit(s) will the use of this material count toward?
Answer
-
rapidly renewable materials
-
recycled content
-
regional materials
-
recycled content and regional materials
-
rapidly renewable materials and regional materials
Question 9
Question
Which of the following project is considered to be a "soft cost"?
Question 10
Question
What is required as documentation for each and every prerequisite and credit in the LEED for BUilding Designa nd Construction Rating System?
Answer
-
a project drawings
-
a required signatory
-
a letter template
-
photos
-
a project narrative
Question 11
Question
What is the minimum amount of pervious area a paving system must have to be considered "open grid"?
Question 12
Question
Solar reflectance is roughly synonymous with what term?
Answer
-
aquifer
-
glare
-
shielding
-
albedo
-
lumen
Question 13
Question
Which of the following is not considered to be a "basic service"?
Answer
-
Parking lot
-
church
-
bank
-
beauty salon
-
grocery store
Question 14
Question
One of the most cost effective ways to ensure optimal ongoing energy performance is to ______?
Answer
-
commission building systems
-
upgrade mechanical systems
-
maintain trees and landscaping features
-
install renewable energy systems
Question 15
Question
Which federal act has been adopted by many local jurisdictions and contains requirements for building accessibility?
Answer
-
EPAct
-
ANSI
-
ADA
-
Civil Rights Act
-
ASHRAE
Question 16
Question
A project generates 100 tons of waste throughout construction. 50 tons are collected off site and sent to a sorting facility with a facility wide diversion rate of 60%. 40 tons are separated on site and sent directly to recyclers. The final 10 tons are incinerated off site. What percentage of waste does LEED consider to have been recycled?
Question 17
Question
Which specific refrigerant has the highest global warming potential (GWP) of all the common refrigerants?
Answer
-
HCFC-123
-
CFC-502
-
CFC-11
-
HFC-404A
-
HFC-23
Question 18
Question
A project team is considering pursuing an innovation in design credit for a strategy that will require a large capital expense. The team decides that it will implement the strategy only if the strategy will be eligible for an innovation in design credit. What steps should the team take to determine whether its strategy will be eligible for the credit?
Answer
-
Research existing CIRs to see whether the strategy has been previously addressed
-
Draft a compelling narrative for the LEED submittal
-
Calculate the strategy's overall environmental impact and self evaluate whether it is significant
-
Check the LEED rating system
Question 19
Question
Which strategy supports improved indoor air quality?
Answer
-
avoid the use of products with high carbon dioxide concentrations
-
use filters with a low minimum efficiency reporting value (MERV) rating
-
use materials with recycled content
-
design systems to deliver ample outside air
-
eliminate refrigerants with ozone depletion potential
-
use advanced framing techniques
Question 20
Question
A new high rise residential building should use what LEED rating system for certification?
Answer
-
LEED for New Construction
-
LEED for Homes
-
LEED for Operations and Maintenance
-
LEED for Core and Shell
-
LEED for Interior Design and Construction
Question 21
Question
The regional priority credits for a project are based on what?
Answer
-
The project's city
-
the project's state
-
the project's county
-
the project's zip code
Question 22
Question
What costing model should be used to demonstrate the true cost of sustainability strategies?
Answer
-
simple payback
-
benefit analysis
-
return on investment
-
life cycle costing
Question 23
Question
What is the energy policy act used for in the LEED rating systems?
Answer
-
to set indoor air quality requirements
-
to establish baseline building plumbing fixture performance
-
to establish baseline building energy performance
-
to set product VOC limits
Question 24
Question
What is the first step in a successful waste management policy?
Answer
-
determine the embodied energy of the product
-
specify recyclable materials
-
recycle all possible construction materials
-
reduce the total quantity of waste
-
reuse existing materials
Question 25
Question
What is the first step a project team should consider when trying to save energy?
Answer
-
install sub metering equipment
-
use onsite renewable energy
-
reduce energy demand
-
adopt energy efficient measures
Question 26
Question
What happens if USBC finds out that a project does not meet the minimum program requirements (MPRs)?
Answer
-
the project's certification level is lowered by one level
-
the project must be resubmitted
-
certification can be revoked
-
a fine must be paid
Question 27
Question
The heat island effect may raise the temperature in an urban area by how many degrees above the temperature in nearby rural areas?
Question 28
Question
What percentage of the solid waste stream each year is attributable to construction and demolition of waste?
Question 29
Question
What factor should a project team not consider when calculating life cycle costs?
Answer
-
maintenance costs
-
operating costs
-
initial costs
-
life span
-
none of the above
Question 30
Question
Which of the following transportation methods does not count as public transportation for LEED purposes?
Question 31
Question
Use of a dry urinal would decrease the fixture's water use form the Energy Policy Act baseline urinal water usage by how much?
Answer
-
1.6 GPF
-
2.5 GPF
-
0.5 GPF
-
1.0 GPF
Question 32
Question
LEED defined regional materials as originating within ____ miles of the project site?
Question 33
Question
Projects can identify which credits have regional priority by ____?
Answer
-
Checking the USGBC website
-
researching locally pertinent environmental issues
-
calculating the net environmental impact
-
submitting a CIR
Question 34
Question
Which type of refrigerant has an essentially zero ozone depletion potential (ODP) but still has high global warming potential (GWP)?
Answer
-
HCFCs
-
HFCs
-
CFCs
-
natural refrigerants
Question 35
Question
Which of the following is not a LEED accepted strategy for decreasing single rider, conventional automobile use?
Answer
-
providing preferred parking for fuel efficient and low emitting vehicles
-
charging fees for parking
-
locating the project near mass transit
-
providing only the amount of parking required by the zoning code
-
providing bicycle storage and showers
Question 36
Question
A building material that is made from recycled soda bottles contains _____?
Answer
-
pre-fabricated recycled content
-
post-industrial recycled content
-
pre-consumer content
-
post-consumer recycled content
Question 37
Question
Which LEED category has the most available LEED points?
Question 38
Question
Which strategy is not effective in reducing potable water use for irrigation?
Question 39
Question
What environmental problem is associated with CFC and HCFC use?
Answer
-
soil erosion
-
ozone depletion
-
the heat island effect
-
water pollution
-
air pollution
Question 40
Question
Which of the following strategies would not be appropriate for mitigating the heat island effect potential of the parking lot of a large office building?
Answer
-
use paving with a SRI of 35
-
place half of the parking underground
-
use open grid paving
-
use mature trees to shade 50% of the parking lot
-
plant seedling conifers to shade the parking
Question 41
Question
Which of the following is not a strategy for reducing stormwater runoff volume?
Answer
-
installing a vegetated roof
-
rainwater harvesting
-
minimizing the building footprint
-
increasing impervious paving
-
using bio retention
Question 42
Question
Which of the following types of vehicles does not qualify as an alternative fuel vehicle for the purposes of LEED?
Answer
-
Diesel powered
-
ethanol pwered
-
hydrogen powered
-
electric powered
-
hybrid (gas-electric)
Question 43
Question
How many of the 110 available points in most of the rating systems are considered bonus points?
Question 44
Question
Why should a project team aim to significantly exceed the established threshold of a LEED credit?
Question 45
Question
What strategy is being used for a project design that orients windows to allow the building to be warm in the winter, stay cool in the summer and capture daylight?
Question 46
Question
Which type of system or equipment would not be a consumer of process water?
Question 47
Question
What is one potential disadvantage of using comingled recycling as a part of a construction waste management plan?
Answer
-
It is more difficult to document than site separated recycling
-
it may be more expensive than site separated recycling
-
it takes up more site area than site separated recycling
-
it may require a greater time investment from the project team
Question 48
Question
The CRI green label plus certification program certifies what type of building material?
Answer
-
furniture
-
adhesives
-
wood products
-
paint
-
carpet
Question 49
Question
Which of the following is not an acceptable form of renewable energy under the LEED rating systems?
Question 50
Question
Which type of refrigerant in general is the most efficient?
Answer
-
HFCs
-
CFCs
-
Natural refrigerants
-
HCFCs
Question 51
Question
Which of the following is not required of an Innovation and design strategy?
Answer
-
it must be a strategy not already covered in the LEED rating systems
-
it must be quantifiable
-
it must be cost effective
-
it must be repeatable by other projects
-
it must be comprehensive
Question 52
Question
Which of the following is not an approved strategy for minimizing the non-roof heat island effect?
Answer
-
shading hardscape with photovoltaiv panels
-
placing parking underground
-
using paving materials with an SRI of 29 or higher
-
using asphalt for parking areas
-
using open grid paving
Question 53
Question
Which rating system has a required recertification process?
Answer
-
Operations and Maintenance
-
Homes
-
Interior Design and Construction
-
Building Design and Construction
-
Neighborhood Development
Question 54
Question
If a project has 1 full time employee and 6 part time employees, what is the projects full time equivalent value (FTE)?
Question 55
Question
What is the best use for potable water?
Answer
-
Drinking
-
cooling towers
-
toilet flushing
-
irrigation
-
swimming pools
Question 56
Question
What type of plant material is most appropriate for use on a green roof?
Answer
-
annuals
-
cultivated plant species
-
native plants
-
trees and shrubs
Question 57
Question
Which type of water is not allowed to be used for irrigation purposes?
Answer
-
Well water
-
gray water
-
captured rain water
-
potable water
-
black water
Question 58
Question
What is an appropriate use of the LEED logo?
Answer
-
for a link to the website
-
by a project pursuing LEED certificaiton
-
on product packaging
-
to indicate an organization's USGBC membership
Question 59
Question
What is not a possible source of graywater?
Answer
-
Washing machine
-
Toilets
-
Bathroom sink
-
showers
-
drinking fountain
Question 60
Question
What is true of the CIR process?
Answer
-
CIRs can be submitted by anyone with a USGBC account
-
all projects must use CIRs
-
CIRs cost $220 each
-
a successful CIR can aware LEED points
Question 61
Question
Demand controlled ventilation is typically adjusted in response to___?
Question 62
Question
What sustainability concept can xeriscaping contribute to?
Answer
-
reducing the heat island effect
-
certified wood
-
indoor air quality
-
construction waste management
-
water efficient irrigation
Question 63
Question
Which material below is not considered a rapidly renewable resource?
Answer
-
bamboo
-
wood
-
cork
-
silk
-
straw
Question 64
Question
What is the best time to incorporate an integrative approach for a building project?
Answer
-
design development
-
construction documents
-
construction
-
schematic design
-
predesign
Question 65
Question
Which of the following regulations is likely to be contained in zoning regulations? (pick 3)
Answer
-
landscaping regulations
-
stormwater management regulations
-
regulations on energy usage
-
open space requirements
-
parking space requirements
Question 66
Question
Projects that achieve a projected water savings of at least ___ are eligible for an exemplary performance ID credit in addition to earning 4 points in WE indoor water use reduction.
Question 67
Question
What are some other possible LEED certifications a project may be able to receive if it has already received LEED core and shell certification? (pick 2)
Answer
-
LEED for schools
-
LEED for new construction
-
LEED for operation and maintenance
-
LEED for Homes
-
LEED for commercial interiors
Question 68
Question
A fuel efficient vehicle must meet which requirement to qualify as low emission and fuel efficient vehicles?
Answer
-
green label score of 30 or more
-
green label score of 45 or more
-
green e score of 25 or more
-
green seal score of 30 or more
-
green score of 45 or more
Question 69
Question
Which of the following products would be considered to contain post consumer recycled content that wuold contribute to the LEED credit for recycled content?
Answer
-
plumbing pipe made from recycled plastic components
-
steel beams made from used railroad ties
-
glass tiles made from glass broken during manufacturing
-
carpet made from recycled soda bottles
-
a countertop made from newspapers
Question 70
Question
During construction, if permanently installed air handlers are used, what is the minimum MERV rating for the filtration media needed to achieve IEQ credit: construction IAQ management plan?
Answer
-
MERV 8
-
MERV 6
-
MERV 7
-
MERV 10
-
MERV 5
-
MERV 9
Question 71
Question
What 3 standards can be used to achieve EA credit 1 Optimize energy performance? (pick 3)
Question 72
Question
What may prevent pedestrian access to a community resource? (pick 3)
Answer
-
a parking lot
-
a public park
-
a freeway interchange
-
distance
-
a wall
Question 73
Question
Which of the following materials may not contribute to construction waste management strategies? (pick 2)
Answer
-
concrete
-
product packaging
-
scrap wood
-
asbestos floor tiles
-
land clearing debris
Question 74
Question
What does the construction activity pollution prevention plan aim to prevent? (pick 3)
Question 75
Question
Which standards are used to establish what vehicles qualify as low emitting and fuel efficient vehicles?
Question 76
Question
The cost of LEED certification for new construction is based on which of the following?
Answer
-
USGBC membership and project type
-
project size
-
project size and USGBC membership
-
USGBC membership
-
project size and project type
-
project type
Question 77
Question
What is the cost of submitting a CIR?
Question 78
Question
In addition to prohibiting smoking within the building, where is it also important to prohibit smoking to reduce occupant exposure to harmful airborne chemicals? (pick 2)
Question 79
Question
Which of the following groups would be considered transient occupants? (pick 2)
Question 80
Question
What happens after the construction submittal?
Answer
-
the full application is ruled upon by USGBC
-
construction points are awarded
-
the design submittal
-
design and construction points are awarded
Question 81
Question
What types of water on a residential condo project could not be used to qualify for WE credit 1 outdoor water use reduction? (pick 2)
Question 82
Question
What are the two primary benefits of using regional materials? (pick 2)
Answer
-
minimizing the impacts of transportation
-
reducing costs
-
assuring quality craftsmanship
-
supporting the local economy
Question 83
Question
At minimum, which of the following basic materials should a recycling program designed to meet the storage and collection of recyclables prerequisite accommodate? (pick 3)
Answer
-
glass
-
plastics
-
cardboard
-
bulbs
-
ink cartridges
Question 84
Question
How can a project purchase green power? pick 2
Answer
-
By purchasing green e certified RECs
-
by buying energy directly from nearby wind farm
-
through a program by the local utility company
-
by purchasing and installing solar panels
Question 85
Question
Which of the following projects would definitely not meet minimum program requirements?
Answer
-
5,000 SF fire station
-
casino on a riverboat
-
a brand new elementary school
-
renovation/addition to large office building
-
temporary sports practice facility
Question 86
Question
What two specific types of refrigerants does the Montreal Protocol phase out the use of? pick 2
Question 87
Question
Two primary sources of potable water:
Answer
-
private/public well
-
ocean
-
captured rainwater
-
lake or stream
-
municipal water systems
Question 88
Question
What are some useful strategies to achieve WE credit: outdoor water use reduction? pick 3
Answer
-
use bioswales
-
use drip irrigation
-
remove turf grass
-
implement mulching
-
create a sediment basin
Question 89
Question
Which approaches can be taken to achieve WE credit outdoor water use reduction? pick 3
Question 90
Question
What are ways to reduce storm water runoff volume?
Answer
-
create retention ponds
-
impervious paving
-
slowing water run off rates
-
use high albedo roof covering
-
use smaller building footprint
-
install bioswales
Question 91
Question
Local codes and regulations may affect which of the following strategies? pick 2
Answer
-
purchasing green power
-
minimizing parking capacity
-
managing indoor air quality
-
construction waste management
-
use of rainwater for toilet flushing
Question 92
Question
What is reduced when a project uses reclaimed water in its cooling towers?