MGT 325 Exam 3

Descrição

Practice exam for MGT 325 Exam 3
Ben Burkett
Quiz por Ben Burkett, atualizado more than 1 year ago
Ben Burkett
Criado por Ben Burkett quase 9 anos atrás
2354
0

Resumo de Recurso

Questão 1

Questão
In the A-B-C system, the typical percentage of the number of items in inventory for A items is about:
Responda
  • 50
  • 10
  • 70
  • 30
  • 90

Questão 2

Questão
In the A-B-C classification system, which account for 15% of the total dollar-volume for a majority of the inventory items would be classified as:
Responda
  • A items
  • B items
  • C items
  • A items plus B items
  • B items plus C items

Questão 3

Questão
In the A-B-C classification system, items which account for 60% of the total dollar-volume for few inventory items would be classified as:
Responda
  • A items
  • B items
  • C items
  • A items plus B items
  • B items plus C items

Questão 4

Questão
The EOQ model is most relevant for which one of the following?
Responda
  • ordering items with dependent demand
  • determination of safety stock
  • ordering perishable items
  • determining fixed interval order quantities
  • determining fixed order quantities

Questão 5

Questão
Which is not a true assumption in the EOQ model?
Responda
  • production rate is constant
  • lead time doesn't vary
  • no more than 3 items are involved
  • usage rate is constant
  • no quantity discounts

Questão 6

Questão
A cycle count program will usually require that 'A' items be counted:
Responda
  • daily
  • once a week
  • monthly
  • quarterly
  • more frequently than annually

Questão 7

Questão
In the basic EOQ model, if annual demand doubles, the effect on the EOQ is:
Responda
  • it doubles
  • it is four times the previous amount
  • it is half its previous amount
  • it is about 70% of its previous amount
  • it increases by about 40%

Questão 8

Questão
In the basic EOQ model, if lead time increases from 5 to 10 days, the EOQ will:
Responda
  • double
  • increase, but not double
  • decrease by a factor of 2
  • remain the same
  • none of the above

Questão 9

Questão
In the basic EOQ model, an annual demand of 40 units, an ordering cost of $5, and a holding cost of $1 per unit per year will result in an EOQ of:
Responda
  • 20
  • square root of 200
  • 200
  • 400
  • none of these

Questão 10

Questão
In the basic EOQ model, if D=60 per month, S=$12, and H=$10 per unit per month, EOQ is:
Responda
  • 10
  • 12
  • 24
  • 72
  • 144

Questão 11

Questão
In the basic EOQ model, if annual demand is 50, carrying cost is $2, and ordering cost is $15, EOQ is approximately:
Responda
  • 11
  • 20
  • 24
  • 28
  • 375

Questão 12

Questão
If average demand for an inventory item is 200 units per day, lead time is 3 days, and safety stock is 100 units, the reorder point is:
Responda
  • 100 units
  • 200 units
  • 300 units
  • 600 units
  • 700 units

Questão 13

Questão
If no variations in demand or lead time exist, the ROP will equal:
Responda
  • the EOQ
  • expected usage during the lead time
  • safety stock
  • the service level
  • the EOQ plus safety stock

Questão 14

Questão
Which one of the following isa implied by a "lead time" service level of 95%?
Responda
  • Approximately 95% of the demand during lead time will be satisfied
  • Approximately 95% of inventory will be used during lead time
  • The probability is 95% that demand during the lead time will exactly equal the amount on hand at the beginning of lea time
  • The probability is 95% that demand during lead time will not exceed the amount on hand at the beginning of lead time.
  • none of the above

Questão 15

Questão
Which one of the following is implied by an "annual" service level of 95%?
Responda
  • Approximately 95% of demand during lead time will be satisfied
  • The probability is 95% that demand will exceed supply during lead time
  • The probability is 95% that demand will equal supply during lead time
  • The probability is 95% that demand will not exceed supply during lead time
  • None of the above

Questão 16

Questão
Daily usage is exactly 60 gallons per day. Lead time is normally distributed with a mean of 10 days and a standard deviation of 2 days. What is the standard deviation of demand during lead time?
Responda
  • 60 x 2
  • 60 times the square root of 2
  • 60 times the square root of 10
  • 60 x 10
  • None of the above

Questão 17

Questão
Lead time is exactly 20 days long. Daily demand is normally distributed with a mean of 10 gallons per day and a standard deviation of 2 gallons. What is the standard deviation of demand during lead time?
Responda
  • 20 x 2
  • 20 x 10
  • 2 times the square root of 20
  • 2 times the square root of 10
  • none of the above

Questão 18

Questão
Which of these products would be most apt to involve the use of a single-period model?
Responda
  • gold coins
  • hammars
  • fresh fish
  • calculators
  • frozen corn

Questão 19

Questão
In a single-period model, if shortage and excess costs are equal, then the optimum service level is:
Responda
  • 0
  • .33
  • .50
  • .67
  • none of these

Questão 20

Questão
In a single-period model, if shortage cost is four times excess cost, then the optimum service level is percent.
Responda
  • 100
  • 80
  • 60
  • 40
  • 20

Questão 21

Questão
In the single-period model, if excess cost is double shortage cost, the approximate stockout risk, assuming an optimum service level, is percent.
Responda
  • 100
  • 67
  • 50
  • 33
  • 5

Questão 22

Questão
If, in a single-period inventory situation, the probabilities of demand being 1, 2, 3, or 4 units are .3, .3, .2, and .2, respectively. If two units are stocked, what is the probability of selling both of them?
Responda
  • .5
  • .6
  • .7
  • .8
  • none of these

Questão 23

Questão
If average demand for an item is 20 units per day, safety stock is 50 units, and lead time is four days, the ROP will be:
Responda
  • 20
  • 50
  • 70
  • 80
  • 130

Questão 24

Questão
Suppose that usage of cooking oil at Harry's Fish Fry is normally distributed with an average of 15 gallons/day and a standard deviation of two gallons/day. Harry has just fired the manager and taken over operating the restaurant himself. Harry has asked you to help him decide how to reorder cooking oil in order to achieve a service level which is seven times the risk of stockout (7/8). Lead time is eight days. Assume that cooking oil can be ordered as needed.
Responda
  • 185.30
  • 126.50
  • 150
  • 122.50
  • 167.85

Questão 25

Questão
A bakery's use of corn sweetener is normally distributed with a mean of 80 gallons per day and a standard deviation of four gallons per day. Lead time for delivery of the corn sweetener is normal with a mean of six days and a standard deviation of two days. If the manager wants a service level of 99 percent, what reorder point should be used?
Responda
  • 502.8
  • 852.8
  • 853.5
  • 480

Questão 26

Questão
A manufacturer is contemplating a switch from buying to producing a certain item. Setup cost would be the same as ordering cost. The production rate would be about double the usage rate. Compared to the EOQ, the economic production quantity would be approximately:
Responda
  • the same
  • 20% larger
  • 40% larger
  • 20% smaller
  • 40% smaller

Questão 27

Questão
A manufacturer is contemplating a switch from buying to producing a certain item. Setup cost would be the same as ordering cost. The production rate would be about double the usage rate. Compared to the EOQ, the maximum inventory would be approximately:
Responda
  • 70% higher
  • 30% higher
  • the same
  • 30% lower
  • 70% lower

Questão 28

Questão
The manager of the Quick Stop Corner Convenience Store (which never closes) sells four cases of Stein beer each day. Order costs are $8.00 per order, and Stein beer costs $.80 per six-pack (each case of Stein beer contains four six-packs). Orders arrive three days from the time they are placed. Daily holding costs are equal to five percent of the cost of the beer. At what point should he reorder Stein beer?
Responda
  • 0 cases remaining
  • 4 cases remaining
  • 12 cases remaining
  • 16 cases remaining
  • 20 cases remaining

Questão 29

Questão
The manager of the Quick Stop Corner Convenience Store (which never closes) sells four cases of Stein beer each day. Order costs are $8.00 per order, and Stein beer costs $.80 per six-pack (each case of Stein beer contains four six-packs). Orders arrive three days from the time they are placed. Daily holding costs are equal to five percent of the cost of the beer. If he were to order 16 cases of Stein beer at a time, what would be the length of an order cycle?
Responda
  • 0.25 days
  • 3 days
  • 1 day
  • 4 days
  • 20 days

Questão 30

Questão
The manager of the Quick Stop Corner Convenience Store (which never closes) sells four cases of Stein beer each day. Order costs are $8.00 per order, and Stein beer costs $.80 per six-pack (each case of Stein beer contains four six-packs). Orders arrive three days from the time they are placed. Daily holding costs are equal to five percent of the cost of the beer. If he were to order 16 cases of Stein beer at a time, what would be the average inventory level?
Responda
  • 4 cases
  • 12 cases
  • 8 cases
  • 20 cases
  • 16 cases

Questão 31

Questão
The manager of the Quick Stop Corner Convenience Store (which never closes) sells four cases of Stein beer each day. Order costs are $8.00 per order, and Stein beer costs $.80 per six-pack (each case of Stein beer contains four six-packs). Orders arrive three days from the time they are placed. Daily holding costs are equal to five percent of the cost of the beer. If he were to order 16 cases of Stein beer at a time, what would be the daily total inventory costs, EXCLUDING the cost of the beer?
Responda
  • $2.00
  • $4.00
  • $1.28
  • $3.28
  • $2.56

Questão 32

Questão
The manager of the Quick Stop Corner Convenience Store (which never closes) sells four cases of Stein beer each day. Order costs are $8.00 per order, and Stein beer costs $.80 per six-pack (each case of Stein beer contains four six-packs). Orders arrive three days from the time they are placed. Daily holding costs are equal to five percent of the cost of the beer. What is the economic order quantity for Stein beer?
Responda
  • 8 cases
  • 11 cases
  • 14 cases
  • 20 cases
  • 32 cases

Questão 33

Questão
A design engineer wants to construct a sample mean chart for controlling the service life of a halogen headlamp his company produces. He knows from numerous previous samples that this service life is normally distributed with a mean of 500 hours and a standard deviation of 20 hours. On three recent production batches, he tested service life on random samples of four headlamps, with these results: Sample Service Life (hours) 1 195 500 505 500 2 525 515 505 515 3 470 480 460 470 90. What is the sample mean service life for sample 2?
Responda
  • 460 hours
  • 495 hours
  • 500 hours
  • 515 hours
  • 525 hours

Questão 34

Questão
A design engineer wants to construct a sample mean chart for controlling the service life of a halogen headlamp his company produces. He knows from numerous previous samples that this service life is normally distributed with a mean of 500 hours and a standard deviation of 20 hours. On three recent production batches, he tested service life on random samples of four headlamps, with these results: Sample Service Life (hours) 1 195 500 505 500 2 525 515 505 515 3 470 480 460 470 What is the mean of the sampling distribution of sample means when service life is in control?
Responda
  • 250 hours
  • 470 hours
  • 495 hours
  • 500 hours
  • 515 hours

Questão 35

Questão
A design engineer wants to construct a sample mean chart for controlling the service life of a halogen headlamp his company produces. He knows from numerous previous samples that this service life is normally distributed with a mean of 500 hours and a standard deviation of 20 hours. On three recent production batches, he tested service life on random samples of four headlamps, with these results: Sample Service Life (hours) 1 195 500 505 500 2 525 515 505 515 3 470 480 460 470 What is the standard deviation of the sampling distribution of sample means for whenever service life is in control?
Responda
  • 5 hours
  • 6.67 hours
  • 10 hours
  • 11.55 hours
  • 20 hours

Questão 36

Questão
A design engineer wants to construct a sample mean chart for controlling the service life of a halogen headlamp his company produces. He knows from numerous previous samples that this service life is normally distributed with a mean of 500 hours and a standard deviation of 20 hours. On three recent production batches, he tested service life on random samples of four headlamps, with these results: Sample Service Life (hours) 1 195 500 505 500 2 525 515 505 515 3 470 480 460 470 If he uses upper and lower control limits of 520 and 480 hours, what is his risk (alpha) of concluding service life is out of control when it is actually under control (Type I error)?
Responda
  • 0.0026
  • 0.0456
  • 0.3174
  • 0.6826
  • 0.9544

Questão 37

Questão
A design engineer wants to construct a sample mean chart for controlling the service life of a halogen headlamp his company produces. He knows from numerous previous samples that this service life is normally distributed with a mean of 500 hours and a standard deviation of 20 hours. On three recent production batches, he tested service life on random samples of four headlamps, with these results: Sample Service Life (hours) 1 195 500 505 500 2 525 515 505 515 3 470 480 460 470 If he uses upper and lower control limits of 520 and 480 hours, on what sample(s) (if any) does service life appear to be out of control?
Responda
  • sample 1
  • sample 2
  • sample 3
  • both samples 2 and 3
  • all samples are in control

Questão 38

Questão
The Chair of the Operations Management Department at Quality University wants to construct a p-chart for determining whether the four faculty teaching the basic P/OM course are under control with regard to the number of students who fail the course. Accordingly, he sampled 100 final grades from last year for each instructor, with the following results: Instructor Number of Failures Prof. A 13 Prof. B 0 Prof. C 11 Prof. D 16 What is the sample proportion of failures (p) for Prof. D?
Responda
  • 0
  • .04
  • .11
  • .13
  • .16

Questão 39

Questão
The Chair of the Operations Management Department at Quality University wants to construct a p-chart for determining whether the four faculty teaching the basic P/OM course are under control with regard to the number of students who fail the course. Accordingly, he sampled 100 final grades from last year for each instructor, with the following results: Instructor Number of Failures Prof. A 13 Prof. B 0 Prof. C 11 Prof. D 16 What is the estimate of the mean proportion of failures for these instructors?
Responda
  • .10
  • .11
  • .13
  • .16
  • .40

Questão 40

Questão
The Chair of the Operations Management Department at Quality University wants to construct a p-chart for determining whether the four faculty teaching the basic P/OM course are under control with regard to the number of students who fail the course. Accordingly, he sampled 100 final grades from last year for each instructor, with the following results: Instructor Number of Failures Prof. A 13 Prof. B 0 Prof. C 11 Prof. D 16 What is the estimate of the standard deviation of the sampling distribution for an instructor's sample proportion of failures?
Responda
  • .0075
  • .03
  • .075
  • .3
  • .75

Questão 41

Questão
The Chair of the Operations Management Department at Quality University wants to construct a p-chart for determining whether the four faculty teaching the basic P/OM course are under control with regard to the number of students who fail the course. Accordingly, he sampled 100 final grades from last year for each instructor, with the following results: Instructor Number of Failures Prof. A 13 Prof. B 0 Prof. C 11 Prof. D 16 What are the .95 (5% risk of Type I error) upper and lower control limits for the p-chart?
Responda
  • .95 and .05
  • .13 and .07
  • .1588 and .0412
  • .16 and .04
  • .1774 and .0226

Questão 42

Questão
The Chair of the Operations Management Department at Quality University wants to construct a p-chart for determining whether the four faculty teaching the basic P/OM course are under control with regard to the number of students who fail the course. Accordingly, he sampled 100 final grades from last year for each instructor, with the following results: Instructor Number of Failures Prof. A 13 Prof. B 0 Prof. C 11 Prof. D 16 Using .95 control limits, (5% risk of Type I error), which instructor(s), if any, should he conclude is (are) out of control?
Responda
  • none
  • Prof. B
  • Prof. D
  • both Prof. B and Prof. D
  • all

Questão 43

Questão
A Quality Analyst wants to construct a control chart for determining whether four machines, all producing the same product, are under control with regard to a particular quality attribute. Accordingly, she inspected 1,000 units of output from each machine in random samples, with the following results: Machine Total Defectives #1 23 #2 15 #3 29 #4 13 What is the sample proportion of defectives for machine #1?
Responda
  • .023
  • .02
  • .0115
  • .0058
  • .005

Questão 44

Questão
A stint for use is coronary surgery requires a special coating. Specifications for this coating call for it to be at least 0.05 millimeters but no more than 0.15 millimeters. Suppose the criterion for evaluating this process is that the appropriate capability index must be at least 1.3. With a long-run process mean of 0.09 and a standard deviation of 0.015, is this process capable?
Responda
  • Yes
  • No

Questão 45

Questão
Studies on a bottle-filling machine indicates it fills bottles to a mean of 16 ounces with a standard deviation of 0.10 ounces. What is the process specification, assuming the Cpk index of 1?
Responda
  • 0.10 ounces
  • 0.20 ounces
  • 0.30 ounces
  • 16.0 ounces plus or minus 0.30 ounces
  • none of the above

Questão 46

Questão
Studies on a machine that molds plastic water pipe indicate that when it is injecting 1-inch diameter pipe, the process standard deviation is 0.05 inches. The one-inch pipe has a specification of 1-inch plus or minus 0.10 inch. What is the process capability index (Cpk) if the long-run process mean is 1 inch?
Responda
  • 0.50
  • 0.67
  • 1.00
  • 2.00
  • none of the above

Questão 47

Questão
The specification limit for a product is 8 cm and 10 cm. A process that produces the product has a mean of 9.5 cm and a standard deviation of 0.2 cm. What is the process capability, Cpk?
Responda
  • 3.33
  • 1.67
  • 0.83
  • 2.50
  • none of the above

Questão 48

Questão
The specifications for a product are 6 mm ± 0.1 mm. The process is known to operate at a mean of 6.05 with a standard deviation of 0.01 mm. What is the Cpk for this process?
Responda
  • 3.33
  • 1.67
  • 5.00
  • 2.50
  • none of the above

Questão 49

Questão
138. A process results in a few defects occurring in each unit of output. Long-run, these defects should be monitored with___________________.
Responda
  • p-charts
  • c-charts
  • x-bar charts
  • r-charts
  • o-charts

Questão 50

Questão
When a process is in control, it results in there being, on average, 16 defects per unit of output. C-chart limits of 8 and 24 would lead to a ________________ chance of a Type I error.
Responda
  • 67%
  • 92%
  • 33%
  • .03%
  • 5%

Questão 51

Questão
When a process is in control, it results in there being, on average, 16 defects per unit of output. C-chart limits of 4 and 28 would lead to a chance of a Type I error.
Responda
  • 67%
  • 92%
  • 33%
  • 0.3%
  • 5%

Questão 52

Questão
A tool that is not used for quality management is ________________.
Responda
  • Flowchart
  • Histogram
  • Perato Analysis
  • Redesign
  • Check sheets

Questão 53

Questão
The four dimensions of quality that are sometimes used to determine fitness for use of a product are
Responda
  • performance, special features, durability, and service after sale
  • performance, special features, conformance, and reliability
  • special features, conformance, reliability, and durability
  • performance, conformance, reliability, and durability
  • special features, conformance, durability, and service after sale

Questão 54

Questão
A tool that depicts process variation graphically is a(n) .
Responda
  • Affinity diagram
  • Check list
  • Control Chart
  • Flow Chart
  • Relationship diagram

Questão 55

Questão
Which isn't a cost of quality?
Responda
  • Prevention cost
  • External failure
  • Extended Service Contracts
  • Internal failure
  • Appraisal costs

Questão 56

Questão
Lost production time, scrap, and rework are examples of
Responda
  • internal failure costs
  • external failure costs
  • appraisal costs
  • prevention costs
  • replacement costs

Questão 57

Questão
Warranty service, processing of complaints, and costs of litigation are examples of
Responda
  • internal failure costs
  • external failure costs
  • appraisal costs
  • prevention costs
  • replacement costs

Questão 58

Questão
Costs of inspectors, testing, test equipment, and labs are examples of
Responda
  • internal failure costs
  • external failure costs
  • appraisal costs
  • prevention costs
  • replacement costs

Questão 59

Questão
Loss of business, liability, productivity and costs are consequences of
Responda
  • Labor Unions
  • Globalization
  • Poor Quality
  • Robotics
  • Micro-factories

Questão 60

Questão
Quality planning and administration, quality training, and quality control procedures are examples of
Responda
  • internal failure costs
  • external failure costs
  • appraisal costs
  • prevention costs
  • replacement costs

Questão 61

Questão
ISO 9000 standards do not have a requirement for
Responda
  • resource
  • remedial
  • systems
  • training
  • management

Questão 62

Questão
A quality circle is
Responda
  • responsible for quality
  • total quality control
  • an inspection stamp found on meat
  • a voluntary group of employees
  • none of the above

Questão 63

Questão
ISO 9000 currently requires of a certified organization
Responda
  • Quarterly reporting
  • Product diversity
  • Annual audits
  • A minimum of four supervisory levels
  • Continuous improvement

Questão 64

Questão
The quality control improvement tool which distinguishes between the "important few" and the "trivial many" is
Responda
  • brainstorming
  • check sheets
  • Pareto analysis
  • cause-and-effect diagrams
  • fail-safe methods

Questão 65

Questão
TQM stands for:
Responda
  • Taguchie Quality Methods
  • Tactical Quality Measurements
  • The Quality Matrix
  • Total Quality Management
  • Total Quantity Measurement

Questão 66

Questão
Which of the following is an element of TQM?
Responda
  • continuous improvement
  • competitive benchmarking
  • employee empowerment
  • team approach
  • all of the above

Questão 67

Questão
85. Management behaviors supporting an organizational culture that encourages continuous improvement include which of the following? (I) develop a vision statement for the organization (II) develop a reward system that promotes the philosophy (III) institute continuous training programs (IV) make decisions that adhere to the philosophy
Responda
  • I, II, and IV
  • I, II, III, and IV
  • I and III
  • II, III, and IV
  • II and IV

Questão 68

Questão
The tool that is useful in the collection and organization of data is:
Responda
  • a control chart
  • a Pareto chart
  • a check sheet
  • a flow chart
  • none of the above

Questão 69

Questão
A quality improvement technique that involves the sharing of thoughts and ideas in a way that encourages unrestrained collective thinking is:
Responda
  • Pareto analysis
  • benchmarking
  • brainstorming
  • a control chart
  • a check sheet

Questão 70

Questão
In order for TQM to be successful, it is essential that most of the organization be
Responda
  • members of quality circles
  • under contract
  • ISO certified
  • trained in error detection techniques
  • in agreement with the philosophy and its goals

Questão 71

Questão
The typical difference between "quality circles" and "continuous improvement teams" is
Responda
  • Quality circles work on product design only
  • Continuous improvement teams work on product and process design
  • Continuous improvement teams use only engineers while quality circles use just the workers doing the work
  • the amount of employee empowerment
  • There is no difference-they are just the same

Questão 72

Questão
Which of the following is not a goal of process improvement?
Responda
  • increasing customer satisfaction
  • reducing waste
  • achieving higher quality
  • identifying the cause of a problem
  • All are the goals

Semelhante

Preparing for Presentations
Micheal Heffernan
Introduction notes on SCRUM Project management framework.
Wesley Thomson
The SAT Math test essentials list
lizcortland
How to improve your SAT math score
Brad Hegarty
Unit 3.4: Effective People Management
nk_
How to Turn Business Failure into Business Success
Micheal Heffernan
Management Skills: MOTIVATION
Ciara Mooney
Leadership vs. Management
Fahima Noori
What is strategy?
wightrose
MGT chapter 15
Bailey N
chapter 14 management
Rigo Sanchez